Post Job Free
Sign in

Civil Engineering Project

Location:
Fereej Ibn Dirhem, Qatar
Salary:
20000QAR
Posted:
July 12, 2020

Contact this candidate

Resume:

SARAVANAN.B

Quantity Surveyor

Location:Doha,Qatar

Mobile :+ 974 -77297895

Email: *****************************@*****.***

Saravanan_CV(2019) - 1 of 5

Bachelor of Civil

Engineering,

M S University,

Graduated Year-2000

Tamilnadu, India

Quantity Surveyor

Indian

The Ministry of

Municipality and

Urban Planning

(MMUP/UPDA)Qatar

English

Tamil

Hindi

Malayalam

AUTO CAD

PRIMAVERA

MS OFFICE

MS PROJECT

SUMMARY

A self- motivated Quantity Surveyor with over 19 years of experience in the construction industry in managing Multi-Billion Dollar fast track Industrial Projects / Commercial Projects / Infra Structure Projects and Residential & Building Projects; Well versed in working different levels of internal environment in QATAR, UAE, BAHRAIN & INDIA. A dynamic Quantity Surveyor professional having Project Management, Cost & Quantity Management, Contract Management, Coordination and Team Management with well-known organizations and Well versed in implementing to the familiar with International Codes and Standards including ASTM, BS, ISO and POMI, SMM7, CESMM3, FIDIC, NRM1 and NRM2 & other codes procedures are covered to client satisfaction.

CURRENT PROFESSIONAL EXPERIENCE

KEO INTERNATIONAL CONSULTNATS,

QATAR

Position: Quantity Surveyor,

Duration: March2020 – Until Date 2020

Project: Roads and Infrastructure in Al Kharaitiyat and Izghawa - Phase 1 - Package 04

Contract Value: 5.99 Billion QAR

KEO INTERNATIONAL CONSULTNATS, QATAR

Position: Quantity Surveyor,

Duration: December 2014 – Feb 2020

Project: Construction and Upgrade of Rayyan Road

Project 7: Contract 2 West of Olympic R/A to West of New Rayyan R/A- IA/12-13/C/058/ST

Contract Value: 4.44 Billion QAR

The P007-C2 is the Contract for the Construction and Upgrade of the Section of Rayyan Road from West of Olympic Roundabout to the New Rayyan Roundabout, approximately 5.5 km with dividing median and generally four lanes in each direction plus 6.0 km of service/side roads. The Works include three two-level interchanges (F106, B3 and R8), two three-level interchanges (R5 and R6) and one Fly-over Bridge at the interchange (R7). The works also include all turning lanes, power galleries

(i.e. cable tunnels) and pedestrian underpasses. In addition, the scope of Works includes traffic diversions, temporary traffic control and management, public and private utilities protection, temporary diversion and future provision, and Intelligent Transport System. SARAVANAN.B

Quantity Surveyor

Saravanan_CV(2019) - 2 of 5

Cost Estimation

Budget

Bill of Quantities

Evaluation

Interim Valuations

Negotiation

Depth Knowledge of

FIDIC

Depth Knowledge of

QCS

Depth Knowledge of

International Codes

Claims

Variation Analysis

Project Planning &

Management

Cost & Quantity

Management

Contract Management

Cost Control

Procurement

Co-ordination

Mobile : +974-********

Email: *************@*****.**.**

Skype: Saravanan7998

LinkedIn: Saravanan-b-58995a20/

Twitter:@SaravananBalas8

"References available upon

request".

The Scope includes utilities works also like Storm Water Works, Potable Water Works, Foul Sewer Works, TSE Works, Electrical Works, Street Lighting Works, Ooredoo Works, QNBN works, QAF Works, MOI-SSD Works, UGN Works, ITS Works, Substation Works and Landscaping Works, etc.

DUTIES AND RESPONSIBILITY

Assist the SQS in all matters relating to the financial and contractual aspects of the project.

Implements cost controls and financial control procedures as outlined in the construction contracts.

•Measures and assesses client’s variations to the construction works and contractor’s claims for changes.

•Evaluates contractor’s monthly interim payment applications.

•Identifies areas of concern and assesses their potential impact upon the project budget.

•Measurement of site works from drawings and on site including AutoCAD measurement techniques.

•Assists in the review of time extensions, delays and penalties.

•Prepares progress valuations in respect of interim monthly and final payments to contractors.

•Assesses, measures, advises on and recommends the cost impact of design changes.

•Prepares Change/Variation Orders and reports upon cost impacts of such orders on the construction budget.

•Assists in the reviews, assessments and reports upon contractor’s claims

•Prepares project cost and cash flow reports.

PREVIOUS PROFESSIONAL EXPERIENCE

SAMSUNG ENGINEERING(P) LTD,BAHRAIN

Position: Project Quantity Surveyor,

Duration: November 2011 – November 2014

Project: STEEL MILL PROJECTS (SULB) & SEWERAGE TREATMENT PLANT(STP)

Contract Value: 1.25 Billion BHD & 1.75 Billion BHD DUTIES AND RESPONSIBILITY

• Participate in evaluation and recommendation of appropriate Cost and Value Consultant(s) to client for project site.

• Assist Project Control Manager to establish client requirements, conduct feasibility studies, past estimation reviews and cost estimations.

• Undertake cost analyses for project work.

• Perform risk and value management and cost control.

• Assist Identify, analyze and develop responses to commercial risks.

• Provide advice on contractual claims including EOT and costs.

• Value completed work and coordinate for arranging payments.

• Measure variations quantities and costs.

Recording and monitoring all site activities and costs being expended on the project.

• Prepare and monitor project cash flow forecasts.

• Measure, value, submit and negotiate contract variations.

• Provide advice to project staff on commercial and contractual matters including reviewing and drafting of correspondence.

•Prepare submit and negotiate project interim valuation and final accounts.

• Preparation of subcontractor’s payments and recording / monitoring of all SARAVANAN.B

Quantity Surveyor

Saravanan_CV(2019) - 3 of 5

site works.

• Preparation of monthly commercial reports in conjunction with PM and site team.

• Reconciliation of materials and works executed during the month. SEG CONTRACTING W.L.L, QATAR

Position: Lead Quantity Surveyor,

Duration: January 2009 – July 2011

Project: RASS LAFFAN SAFETY ENGINEERING COLLEGE PROJECT WITH INFRASTRUCTURE

Contract Value: 1.75 Billion QAR

DUTIES AND RESPONSIBILITY

• Evaluate the unit rates for new work items and present to the SQS for review.

• Participate in recording the details and monitor the day works recording and process.

• Assist the SQS in the preparation of variation orders.

• Participate in the Evaluate contractual claims for review by the SQS.

• Participate in the evaluation and recommendation of entitlement of Contractors claims for review and issuance by the SQS.

• Advice on contractual matters related to financial issues.

• Ensure completeness and validity of all contractual requirements.

• Monitor the contractor’s resource allocation.

• Assist the SQS in the preparation of financial statements for monthly report.

• Participate in the evaluation and recommendation of entitlement of Contractors claims for review and issuance by the SQS.

• Monitor the contractor’s resource allocation.

• Assist the SQS in the preparation of financial statements for monthly report.

• Check and record measurements of completed work.

• Monitor contracts final cost estimates.

• Participate in the preparation of Final Accounts with all supporting documentation

ROBODH CONTRACTING CO.LLC,UAE

Position: Sr. Quantity Surveyor,

Duration: June 2006 – November 2008

Project: DUBAI MARINA MALL WITH TWIN TOWER(78 STOREYS) WITH FOUR STOREYS CAR PARKING BUILDING PROJECT

Contract Value: 3.75 Billion AED

DUTIES AND RESPONSIBILITY

• Establish client’s requirements and undertake feasibility studies.

• Attend onsite and consultants’ meetings and liaise with clients, architects and associate consultants in the administration of projects.

• Interpret engineering drawings and specifications to calculate project costs.

• Prepare various main building contracts, piling contracts and nominated sub-contracts for tender and contract formalization.

• Measure and take off quantities for architectural and structural work elements.

• Administer pre and post contract and consultancy work.

• Assess variation orders; prepare interim valuations, cost plans and budget studies.

• Compile contract documents for execution.

• Understand and adhere to the statutory building regulations.

• Undertake cost analysis for repair and maintenance of project work. SARAVANAN.B

Quantity Surveyor

Saravanan_CV(2019) - 4 of 5

• Allocate work to subcontractors.

• Analyze outcomes and write detailed progress reports.

• Maintain awareness of different building contracts in current use.

• Valuing completed work and arrange payments.

FW CONSTRUCTION (P) LTD, MALDIVES

Position: Quantity Surveyor,

Duration: August 2004 – May 2006

Project: 10 STOREYS COMMERICAL & RESIDENTIAL PROJECT Contract Value: 175 Million USD

DUTIES AND RESPONSIBILITY

• Preparation of Cost Estimations estimates / budgets.

• Handling of pre & post contract calculations and correspondence.

• Measurement of Bills of Quantities.

• Evaluation, negotiation and selection of suppliers / sub-contractors.

• Checking and verification of subcontractor’s interim payment certificates.

• Preparing cost budgets and prices for contract variations.

• Monitoring project cost and preparation of cost reports.

• Providing commercial support to Design and sub Contract Staff.

• Post contract administration of contract (POMI, FIDIC Red Books and D&B – drafting correspondences, claims, delay analysis etc.)

• Management of bonds, insurances and guarantee logs

• Interim valuations and payment certificates

• Variations analysis, recommendations and management

• Performing risk and value management and cost control functions

• Undertaking costs analysis project work

• Identifying, analyzing and developing responses to commercial risks

• Writing detailed progress/ cost reports

• Reporting to Client Representative on all commercial issues

• Understanding the implications of health and safety regulations

• Managing workload with minimal supervision

• Client facing and involvement in commercial meetings CEEBROSS Property (P) Ltd, INDIA

Position: Site Engineer,

Duration: May 2000 – July 2004

Project: (G+7) STOREYS RESIDENTIAL BUILDING PROJECT Contract Value: 50 Million USD

DUTIES AND RESPONSIBILITY

• Project Management / Site Management;

• Prepare the Construction Schedule;

• Managing resources management;

• Timely completion of project within the given time frame and maintaining quality of Work at all stages as per specifications;

• Minimize wastage of Construction Material;

• Liaison with Client / Consultants;

• Motivating and managing site personnel as team leader;

• Resource Mobilization and management.

• Reporting to Commercial Director on all commercial issues.

• Understanding the implications of health and safety regulations.

• Maintain sub-contract data base.

• Maintain material supplier’s database.

• Take off quantities.

• Prepare progress reports to Project Manager as required.

• Performs other duties and responsibilities as may be assigned from time to time. SARAVANAN.B

Quantity Surveyor

Saravanan_CV(2019) - 5 of 5

RELEVANT THE KEY AREAS EXPERTISE EXPERIENCE

Project Planning & Management:

Managing project activities right from the conceptualization stage to the execution; involving finalization of technical specifications, tendering, procurement, scheduling, progress monitoring, site management, manpower planning & liaising with consultants & contractors.

Establishing time span of project execution as per client specifics; listing down resource needs for projects, after considering the budgetary parameters set.

Planning time & resources, scheduling the activities, updating actual progress, analyzing variance, forecasting weekly & monthly resource requirements etc.

Monitoring/discussing project status; reviewing during the course of project review meetings.

Cost & Quantity management:

Budget Estimates and Cost Planning:-feasibility and detailed construction cost plans and budgets.

Design and Construction Evaluation:-evaluation of the most cost effective construction procurement process.

Contracts Types and Procedures:-advice on the optimum construction contracts and procedures for the procurement and construction of your capital works project.

Contract Documentation:-development of tender contracts and documents for the procurement and construction buildings.

Evaluating Contractor’s Claim:-assessment and evaluation of construction claims associated with additional works delays etc. Preparation of counter claims.

Final Accounts:-provision of final report that addresses all costs associated with your construction project.

Contract Management:

Preparing & floating of tenders to contractors/sub-contractors, evaluation of offers, techno-commercial discussion & finalization of contract in view of project schedule.

Settling of all techno-commercial disputes / clarifications during execution of project.

Deploying review systems to manage execution as per effective techno-economic feasibility.

Overseeing client invoice submission, monitoring and following up of invoice payments.

Settlement of disputes with clients, contractors, Govt. and statutory bodies.

Co-ordination:

Responsible for coordination with the engineering, purchase and finance department for design & drawing specification, dispatch of materials at site’s, raising invoice and payment.

Interacting with the client for securing quick approval of the designs provided & carrying out planning as per pert chart requirement and ensuring proper cash flow cum payment on time.

Coordinating with staff and sub-contractors on site for project progress.



Contact this candidate