Professional profile

A highly skilled Civil Engineer with solid experience on a wide range of roads and highways, asphalt paving, surveying works, materials testing,sourgas plant, pre-commissioning works, gas pipeline, raw water pipeline, hydrotesting of pipelines, construction of tanks and piperacks, bored piles,nitrogen purging,river crossings by HDD method, structural steel and concreting works, safety in design, soil improvement and stabilization, geotechnical soil site investigations,shoreline and coastline protection works, site development, massive sanitary landfills, earthworks and earthmoving works, construction and installation of metal towers and concrete poles of 110 kV overhead powerlinesconstruction projects. Extensive knowledge of industry standards and methodologies, including expertise in ASTM, AASHTO, Marshall, risk assessments, toolbox training and method statements.Tenacious and exacting in the delivery of highly professional services through superb planning and organisation, performing well under pressure and forging a reputation for timely and reliable results. A self starter who enjoys being part of, as well as leading, a successful and productive team. Possesses excellent interpersonal skills and can communicate concisely at all levels.

Objective

Looking to secure a new and challenging position with a forward thinking company, where current skills will be put to good use whilst enabling further personal and professional development and advancement.

Career summary

02/2019 – UP TO PRESENT OPERATIONS MANAGER

MARINAS CONSTRUCTION BUILDERS INCORPORATED

ALTURAL RICEMILL PROJECT

UBAY BOHOL PHILIPPINES

Manage all the operation activities of the company with regards to construction support and logistics of all projects of the company.

Actively involve in the planning and management preparation of every project of the company.

Attend meetings with clients through their key personnel in finalizing the requirements to start the project like environmental certificates and work permit from the local municipality.

Involve in the interview process in hiring of personnel and manpower essential to the project.

Involved in the hiring and management of sub-contractors for the project.

Interview suppliers of materials for construction needs for every different project sites.

Check suitable borrow pit locations and also quarry sites for the aggregate materials needed for the concrete batching plant at the site.

Coordinate with client representative with regards to the finalization of the project plans and drawings & specifications.

Participate in the implementation of the temporary facilities for both PMT & Client Representatives.

Participate in the preparation and inspection of the required equipments needed at the site.

Coordinate with Consultants (PMO) with regards to the implementation of Project Specifications & Standards.

Ensure that the sub-contractors adhere to the Project Drawings, Standards & Specifications.

Ensure that the work is carried out in a very safe and timely manner with impact to the Project Schedule.

02/ 2017 – 01/ 2018 CIVIL SUPERVISOR (ONSHORE)

TECNIMONT SPA UAE

AL DABB’IYA SURFACE FACILITIES PROJECT PHASE III

ABU DHABI UAE

As the main contractor, I manage the sub-contractor in the construction activities of the Clusters Onshore which involves the excavation and installation of foundations for Piperacks, Closed Drain Drum Pit, Pipe supports and Sleepers, ITRs/ETRs, Chemical Shelter and Injection Package.

Ensure that the sub-contractor adheres to the project plans, drawings and specifications.

Initiate to write and amend the work procedures and ensure that they are task specific and the different hazards and control measures are clearly defined and in place.

Review, comment and approve the Method Statement and Tasks Review Analysis (TRA) and HAZID as submitted by the sub-contractor.

Review and approve the work permits from the sub-contractor electronically as per the Permit To Work system of Tecnimont and ADNOC.

Ensure that the manpower employed by the sub-contractor is adequate to the scope of works and jobs at hand.

Ensure that the sub-contractor carries out the construction activities in a very safe and timely manner with impact to the overall project schedule.

Act as a trouble shooter at the site for any issues involving civil works and provides practical solutions as much as possible without any impact on costs.

Ensure that the sub-contractor uses only the latest revision of drawings for the project.

Coordinate with other disciplines for the best way forward in executing the works at the site.

Coordinate with Project Engineering for any issues arising from conflicts in the drawings and any technical issues before they become showstoppers.

Submit a daily progress report to the Line Manager and discuss relevant issues pertaining to work executions or methods and on how to improve production at the site.

Report to project HSE any near misses at the site and be proactive in ensuring that the Life Saving Rules of ADCO is well understood by every worker, supervisors and managers involve in the project.

02/ 2014 – 03/ 2016 CIVIL CONSTRUCTION SUPERVISOR

SHELL GABON UPSTREAM INTERNATIONAL

CENTRAL AFRICA

Manage the contractor in the pre-drilling and post drilling work activities for the well pads in Toucan and Rabi Oilfields.

Direct supervision of a multi million savings in drilling program and was achieved through practical and quick thinking analysis and being proactive in being a part of the solution

Representative of the Engineering Department to the Emergency Response Team (ERT) in Rabi

Manage and supervise the contractor in the construction of the Pig Launcher and Receiver for the New SealineReplacement Project.

Supervise and manage the contractor in the black top road campaign in Gamba

Perform pre-commissioning works for the Yenzi House Construction Project

Manage the contractor in the civil works construction and site preparation of the platforms for different wells in Gamba,Ivenga&TotouOilfields in Gamba, Gabon.

Supervise the contractor in the repair of the 18” Main Oil Line (MOL) from Rabi To Gamba

Coordinate with Shell Topo for the pre-survey works of well site preparation & excavation works and corrosion points (CPs) markers along the Main Oil Line route.

Perform civil maintenance works on Shell’s existing plant at Shell Terminal

Manage and supervise the contractor in the civil works construction of the Aggreko Temporary Power Plant

Ensure that the works at the sites are carried out in a very safe and timely manner

Ensure that the contractors strictly adheres to the project plans and specifications as per Shell Standards

Liaise with HSE in the implementation of the safety policies of the project and the Shell Company management

Review and approve the work permits of different contractors and ensure that the work permits adheres to the PTW system of Shell Gabon.

Review and approve the JHA/HAZID and Method Statement and ensure that they are relevant to the work activities applied for and are up to date and conforms to the established Shell PTW System

Generate task specific work procedures that are relevant to the site conditions.

Attend the Daily Engineering Meeting and the OPN Meetings.

01/ 2012 – 02/2014 PMC CONSTRUCTION SUPERINTENDENT

CH2MHILL / VECO ENGINEERING

SHAH SULPHUR STATION & PIPELINES PK 11

ABU DHABI UNITED ARAB EMIRATES

Manage the contractor in the construction of the Liquid Sulphur Storage Tanks (6 Nos.) and Desalinated Water Tank in Shah Main Gas Plant, Firewater Tanks (2 Nos.), Utility Water Tanks (2 Nos.), Process Water Tanks (2 Nos.) & Potable Water Tanks (2 Nos.)

Monitor the contractor’s activities in the construction of the 12” SEET Pipeline and Corridor, Piperacks, Earthworks, Test Piles and Working Piles, Installation of Overhead Lines and concreting works for the Sulphur Storage Building, Main Access Road, Sub-station Building, IES Building and the Sulphur Station.

Ensure that the contractor’s activities are carried out in a very safe and timely manner with impact to the overall schedule.

Review and approve the contractor’s work permits and ensure that the method statements are relevant to the different task at hand and the JHA / HAZID is specific to the hazards at the site and the control measures and barriers required for a safe execution of the job.

Ensure that the work of the contractor is carried out according to the project plans and specifications.

Implement the project HSE Plans particularly in working through the desert mountains and sand dunes of the Shah area in UAE which shares a border with Saudi Arabia

Respond to contractor’s technical & site queries and other correspondence.

Review and update the construction plans and structural drawings and ensure its implementation by the contractor.

Reports to the Construction Manager to discuss construction work related issues and how to respond.

Ensure that the method statements, testing of materials e.g. soils and concrete are strictly adhered to by

the contractor.

Ensure that the materials used by the contractor are as per the Material Approval Request (MAR)

Attend weekly progress meeting with the contractor and safety tool box meeting at the site.

06/ 2011 – 12/ 2011 PMC CONSTRUCTION SUPERINTENDENT

FLUOR MONGOLIA

OSBL RAW WATERLINE SUPPLY STATION PROJECT

OYU TOLGOI, MONGOLIA

Manage the contractor in the construction of a 67 Kms. Maintenance track road for the Raw Water Supply Station Project (RWSS).

Also manage the contractor in the construction of the raw water main pipeline 900mm diameter ductile pipes, collector tank pump stations (CTPS 1 – 5), break tank pump stations (BTPS 1 – 2), sub-stations, switchyard, bore field pump stations, valve boxes, drain pits, 6.3kV electric poles, 35kV steel towers.

Ensure that the work is carried out in a very safe manner and as per the project specifications, plans and drawings and in compliance with the norms and standards of Mongolia.

Monitor the progress of the contractor and ensure that the project procedure, method statements and the permit to work system is strictly adhered to using HAZID.

Review and approve the work permits of the main contractor to ensure that the work is carried out in avery safe and timely manner.

Ensure that the work permits adheres to the PTW system of Fluor Mongolia and Rio Tinto.

Authorship of the different work procedures that are necessary for strict compliance from the contractor to ensure a safe execution of the task at hand.

Liaise with the Mongolian government inspection team SSIA with regards to the work quality and workmanship through materials testing, and joint survey checking.

Attend daily meetings and safety tool box talk with the contractor.

Provide input on how to do the work safely and participate in obtaining analytical solutions to problems at the worksite.

Responsible for contractor’s daily concrete request and liaise such concrete with the batching plant manager.

Coordinate between the contractor and the blasting superintendent with regards to main pipeline trench areas thar requires blasting.

Monitor the borrow pits and quarries for the materials to be used in by the contractor in roads construction and trench backfill requirements.

Responsible in the application of Land Disturbace Permits and Land Use Permits for the project and coordinate with the Environmental Department in the implementation of the laws of Mongolia in protecting its environment and heritage.

12/ 2008 – 06/ 2011

CIVIL SUPERINTENDENT

KPO BV URALSK, KAZAKHSTAN

URALSK GAS PIPELINE PROJECT

Reporting to the Lead Project Engineer on the construction of the Uralsk Gas Pipeline Project (UGPP), playing a pivotal role in successful completion to strict deadlines, budgets and specifications

Ensuring full compliance with industry standards and best practice through enforcement of robust systems and procedures and by forging productive working relationships with vendors and contractors

Maximising contractor performance via shrewd management, regular reviews and strict monitoring of contractor activities, including testing of soils, aggregates and concrete specimens

Instrumental in the achievement of outstanding quality and safety standards through regular inspections of all work performed by contractors and vendor equipment

Adopting a logical and professional approach to problem solving and technical issue resolution, working closely with multi-disciplinary teams to ensure projects remain on schedule specifically on the pipeline route through the mountainous area of Uralsk

Successfully ensuring work scopes, structural design and drawings, manuals and specifications are fully updated, along with ownership of the Design Change Notification process

Driving continuous improvement of working practices, challenging and reviewing methods and procedures to maximise safety, productivity and functionality

Review and approve the method statements submitted by the main contractor.

Review and approve the Job Hazard Analysis / HAZID for a safe execution of the job at the site.

Review and approve the work permits of the main contractor and ensure that the permits are as per the PTW system of KPO B.V.

Cease works in case of violation of safety rules that may jeopardize personnel health and life; immediately inform responsible persons and management.

Taking the lead in performing in depth design and material conformity surveys, ensuring full adherence to client specifications

Manage and monitor the activities of the sub-contractor on the river crossings using Horizontal Direct Drilling (HDD) method.

Pre-commissioning works on the gas pipelines, air blowing, clean-out by pig method, hydrotesting of main pipelines and purging with nitrogen.

01/ 2008 – 07/ 2008

CIVIL SUPERVISOR

TENGIZ CHEVRON OIL, KAZAKHSTAN

SULPHUR EXPANSION PROJECT (SEP)

Key player in a major design and construction project, facilitating the first phase by managing site preparation and road works in Sulphur Pad 2 for the Sulphur Expansion Project (SEP)

Responsible for contractor activities including removal of sulphur stock materials and preparation of site for soil investigation and survey works

Supporting the SEP Engineering Team by providing technical expertise for site design process and Safety in Design

Effectively coordinating soil investigation drilling works performed by the contractor in advance of new structural works.

Collaborating with the SEP Health, Safety and Environmental team to address safety matters and brownwork permit procedures, ensuring all workers are fully conversant with the Permit to Work system and encourage safety innovations among the contractors

By study and assessment of the project drawings and specifications ensure adequate instructions and method statements are provided for the work content described. Ensure proper control of changes by issuing Instruction to Contractor (ITC) for all changes, reviewing Site Engineering Query (SEQ) to ensure that resposes are appropriate and practical, and reviewing Design Change Notifications (DCN) prior to issue to contractors to ensure correct use of construction resources. Where necessary, ensure that Client approval to changes and costs has been given

Ensure contractor ratio of supervision to labor is adequate and in accordance with contractor contract bid and that such supervision is available at work face areas

Review and approve the method statements, JHA / HAZID, work permits and ensure that they are in accordance with the PTW system of TCO and Chevron.

Write work procedures as needed and required to ensure the safe execution of the job at the site.

04/ 2004 – 11/ 2007

CIVIL WORKS SUPERVISOR

PARSONS FLUOR DANIEL INT’L (PFD) TENGIZ, KAZAKHSTAN

SOUR GAS INJECTION PLANT/ SECOND GENERATION PROJECT

In charge of all contractor civil and structural activities on the Sour Gas Injection Plant (SGI) and Second Generation Plant (SGP) construction projects

Managing method statements, risk assessments and safety task analyses, along with toolbox talks, Permit to Work, Safety in Design, punch listing, inspections, verification and sign off

Review, liaise with the Work Responsible Person and approve the different permits to ensure that the work will be done in a very safe manner.

Identify all the possible hazards and ensure the implementation of the control measures as mentioned on the work permits.

Ensure that the work will be according to the MS, Safety Task Analysis (STA) and if required provide work procedures to ensure safe execution of the work by the main contractor.

Maximising safe use and functionality of lifting equipment, ensuring full compliance with industry standards and regulations

Successfully managing workforce productivity, responsible for addressing contractor performance and attendance issues

Consider the financial implications of all work undertaken and recommend action which will reduce the cost of any work provided that such action is consistent with the project schedule, accepted engineering practice and will maintain the standard of work required

Ensure Safety in Design norms and standards for reinforced concrete and steel structures such as pipe racks, ladders and cages, handrails, gratings and building structures are strictly observed by the contractor and issue site instructions to contractor for any revisions to work not done accordingly as per the project standards

Ensure that the cranes and other lifting devices and equipments for use by the contractor in the hook up and assembly of structural beams and members for the different building structures are in conformance to the norms and standards of the Republic of Kazakhstan.

12/ 1989 – 03/ 2004 CONSTRUCTION MANAGER

AL DERBAS ROADS & MAINTENANCE CO. LTD

AL KHOBAR, SAUDI ARABIA

Supervises and controls the construction and asphalting of various roads and highways projects for clients such as Ministry of Communications, Saudi Aramco, Ministry of Aviation and Defense, Saudi Binladin Group,

SABIC, and Fluor Arabia

Organize the work and the project team to ensure that the scope of works and specifications are implemented, the project schedule is strictly adhered to and the work is carried out in a very safe and timely manner

Coordinate with the material engineer in establishing strategic locations of borrow pits, review and implement the project specifications and material testing requirements for soils, aggregates, concrete, steel, and hot-mix asphalt as per ASTM Standards, AASHTO Specifications and Marshall Method for the bituminous (4A) and wearing course (6B) as per the Ministry of Communications specifications

Ensure that all materials to be used in the project are suitable and approved by the clients

Manage, plan and implement as per the project schedule the asphalt paving works and ensure the material delivery requirements to the project of 60/70 penetration bitumen so as not to incur delays in the overall project schedule

Liaise with the quantity surveyor regarding quantification of of the project material requirements like A1b and A24 subgrade materials, aggregate base course materials (6F), and component aggregates for the asphalt batching plant logistics.

Liaise with the quarry foreman with regards to the crusher schedule and operations to ensure continous supply of crushed aggregates and sand as per project supply requirements.

Progressing through the ranks on a wide range of road and highway projects for various clients in the EasternProvince

Driving successful site development, mass landfills, planning and delivery via a high performing project team

Coordinating method statements, risk assessments, job safety analyses, work permits, project schedules and testing in conjunction with clients and colleagues

Liaise with project consultants and inspectors with regards to the implementation of the testing schedules and site inspections and joint survey checkings to ensure smooth transitions and handover to the client

Reporting to the Project Manager on daily progress, with responsibility for meetings with project teams and clients

03/ 1988 – 09/ 1989 MATERIAL ENGINEER/CIVIL ENGINEER

AL HINDI CO. AL KHOBAR KSA

Responsible in the testing of materials such as soils, aggregates, concrete using ASTM standards and also

Hot-mix asphalt using AASHTO specifications and marshall method

Perform field density tests at the site using sand cone method and troxler as required

Perform tests on soils and aggregates to determine proctor value by rammer method for subgrade and

aggregate base course materials

Perform bitumen extraction on hot-mix asphalt sample to determine its content

Perform sieve analysis on soils and aggregates to determine the percentage composition of every aggregate

size by weight

Perform Los AngelesAbration test on aggregates

Perform Liquid Limit and Platic Limit Tests on soils

MATERIAL ENGINEER/CIVIL ENGINEER

Al Hindi Company

Education and qualifications

Licensure: Registered Philippine Civil Engineer

Registration No.0044813

Dates of Exam:November 30& December 1, 1984

Member of the Philippine Institute of Civil Engineers (PICE)

Cebu Chapter

BSc: University of the Visayas

CebuCity, Philippines

Bachelor of Science in Civil Engineering

March 24, 1984

Professional Training

First Aid

Working in a Confined Space

Working at Height

Mini-Filter

SCBA

Safety in Design

Permit

OSHA

Primavera 3

STAAD PRO 200

Further skills

I.T. Skills: Word, Excel, Internet, Power Point&Email

Languages: Fluent English & Basic Arabic

Personal details

Date of birth:

Marital Status:

Health:

December 8, 1960

Married

Excellent; non-smoker

Other:

Driver; full clean license Philippines and UAE



Contact this candidate