Ninad Oak
SUMMARY
I am an experienced graduate engineer who has worked with Chrysler, Whirlpool, and GM in manufacturing engineering. I am a Lean six sigma and MODAPTS certified engineer with experience in scroll development, process improvement, time, motion and ergonomic studies.
ACADEMIC QUALIFICATION
M.S. Industrial Engineering – Texas Tech University, Lubbock, TX (May 2017)
B.S. Mechanical Engineering – University of Pune, India (May 2014)
SKILL SET
Lean Manufacturing tools, DMAIC, DOE, Project Management, Kaizen, 5S, Line Balancing, VSM, cycle time validation,
Engineering software – AutoCAD, Arena, MS Project, Teamcenter, AMPS, Google suite, STDS, APS
Certification – MODAPTS
WORK EXPERIENCE
Industrial Engineer, Vehicle Systems at GM Arlington assembly, Arlington, TX Sept 2019- April 2020
Updated 3D layouts for T1XX launch for Trim and Final line which included addition of new tools and equipment
Analyzed operator cycle times for Trim and chassis on the existing K2 program using Standard time data system (STDS) to maximize throughput
Conducted deep dive meetings with the corporate layout integration team to validate final T1XX layouts
Worked with facility engineering team, Lean material strategies (LMS) team to make space for additional T1 stations
Followed T1 builds to validate cycle times on Trim and Final
Worked with the production to solve difficult over cycle jobs on Engine line for the T1 builds.
Worked with the ergonomics team to solve platform issues on the final line
Industrial Engineer, The Productivity Team, at Whirlpool Corporation Tulsa, OK May 2019 – Aug 2019
Conducted MODAPTS studies on stove line to collect cycle time data for 70 stations
Conducted MURI analysis on all 70 stations to find out any level 1 MURI’s
Suggested and documented Kaizens for eliminating 68 Level 1 Muri’s
Conducted MUDA and MURA analysis to find out any variation in jobs as well as any NVA and Semi-NVA
Suggested and documented Kaizens for MUDA-MURA analysis
Worked on 6 headcount reductions on 2 shifts and made plans for the line balancing trials
Studied material handler jobs to make plans for headcount reductions in material handling
Launch Industrial Engineer (Contract) FCA Sept 2018 – April 2019
Conducting line speed studies on the stations to validate throughput
Participating in Workplace Organization (WO) projects
Maintaining required to run (RTR) number for manpower in general assembly
Eliminating penalty heads on stations by continuous improvement (Kaizen) and line balancing
Scrolling job elements for new launch on engine line
Conducting MODAPTS studies on job elements in GA to validate theoretical cycle time
Line balancing done on engine harness job operation to reduce line stops
Participating in new station layout reviews for launch
Working with MLM, ergonomics and quality teams for solving Product process integration (PPI) issues
Process Improvement Engineer at Trulite Glass & Aluminum Solutions (Indianapolis) Feb 2018 – Aug 2018
Participating in continuous improvement activities to improve throughput (Manufacturing yield, cutting yield)
Part of VSM team which is developing value stream map for different products
Developing/maintaining work instructions and SOPs
Developing PFMEA and control plans
Auditing SOP’s and maintaining/improving the standard of work
Participated in Implementation of skill chart for all line employees to improve cross training
Working on Lean deployment of the Indianapolis plant which includes developing visual management (GO - NO GO’s, glass do’s and don’ts) for various processes
Conducting OSHA, BBS audits and Layered process audits to support and improve plant KPI’s
Training production employees, supervisors in lean concepts (5whys, Gemba walks, 7 wastes) to develop a lean culture
Managing lean CapEx, justifying costs
Developed a harp rack inventory model to keep track of drop glass (cullet) and improve utilization
Launch Industrial Engineer at Tata Motors, Pune, India July 2013 - July 2015
Used world class manufacturing (WCM) principles to improve productivity
Participated in continuous improvement (Kaizen) activities along the assembly line
Assisted in improving the standard operating procedures (SOP) and work instructions
Conducted operator cycle time validation using MODAPTS
Conducted Line balancing activities to reduce labor idle time
Assessed labor requirements and optimization
Worked in a fast paced and Union environment
Assisted quality team in PFMEA process to reduce downtime and bottleneck issues
Conducted 5S Audits and took corrective actions to improve orderliness
Developed/Maintained station layouts