Post Job Free

Resume

Sign in

Engineer Site

Location:
Riyadh, Saudi Arabia
Posted:
July 11, 2020

Contact this candidate

Resume:

CAREER

OBJECTIVE

Dynamic Mechanical Engineering professional gained 6 years plus result driven versatile experience aspiring a career growth in the field of construction industries to utilize acquired skills and knowledge in achieving organizational goals, I am seeing a job opportunity in an environment of excellence which can provide me with learning and self-development opportunities for future career growth. Seeking a challenging job and to become a part of a highly professional team of an organization where I may strengthen my educational background, and thus develop myself as an excellent Project.

SAMMARY OF

QUALIFICATION

Almost 6 years of extensive experience in the field of Mechanical Engineering,(MEP) Plumbing System (drainage and domestic), Infrastructure Sewer Network (SVCP), Strom Network(UPVC and GRP pipes), Potable Water Network (Ductile Iron and HDPE Pipes), Irrigation water network(UPVC Pipes), HVAC System (Refrigerant and heating piping connections of indoor and outdoor (AHU&FCU) Units distribution including district cooling system. And installation of Fire rated and galvanized duct connections from DXU, FCU, and AHU to rooms, corridor’s diffuser and grills) Installation of supply, return and exhaust duct. Drain connections for AHU & FCU Units. Fire Fighting System (Black Steel pipe A53 and A106 with threaded and grooved fittings). Experience on Project Management, Supervision, Installation of primary, Secondary pumps and heat Exchangers, Valves package's instrumentation and accessories. Expertise associated with Engineering, Shop and IFC Drawings. AZHAR MUZAFFAR

Mechanical Site Engineer & Mechanical QC Inspector (SABIC Approved) Father Name: Muzaffar Hussain

Address: Riyadh (Saudi Arabia)

Email: adehwn@r.postjobfree.com

Mobile# +966*********

D.O.B: 12-04-1992

Gender: Male

Marital Status: Single

Nationality: PAKISTANI

Religion: ISLAM

Language: ENGLISH, ARABIC BASIC, URDU

Driving License: VALID

VISA STATUS: TRANSFERABLE

Azhar Muzaffar/ RESUME P a g e 2

SKILLS Effective technical skills

Ability to work under pressure

Problem-solving skills

Interpersonal skills

Verbal and written communication skills Team working skills

Project Status reporting to the manager and client. Microsoft Office

Web Services

PROFESSIONAL

EXPERIENCE

AL ZAMIL AIR CONDITIONERS & COOL CARE.

CLIENT AND CONSULTANT: RMTC (02-july-2019 to till now) POST : Mechanical QA/QC Inspector

PROJECT: RIYADH METRO 1F8 STATION

VALUE: It will consist of six metro lines spanning a total length of 176 kilometers, with 85 stations. The project will cost $22.5 billion to build. System length: 176 km (109 mi)

Locale: Riyadh, Saudi Arabia

Number of lines: 6

Number of stations: 84

PROJECT DETAILS: Line 1 will stretch from north to south through the Centre of Riyadh, along the Olaya-Batha corridor, covering 38 kilometer’s. The line will include 22 stations and 4 transfer stations where it will connect with other new metro lines. Much of Line 1 will be underground.

Line 2 will run east to west along King Abdullah Road and will be built mostly at grade

(15km) with some elevated sections. This line will run east to west and will extend more than 25 kilometer’s with 13 stations and 3 transfer stations. DUTIES AND RESPONSIBILITIES

Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site.

Coordinate with the consultant’s representative and Site En-charge for inspection and meeting about quality problems including the closure of Non-Compliance Report.

Report to the QA/QC Manager, control, and monitor all activities related to Quality Management system.

Taking care of QA/QC documents of the entire project including certificates, Azhar Muzaffar/ RESUME P a g e 3

calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non-conformance, NCR and Site Instruction, SI.

Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.

Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP.

Monitoring the phases of quality control of work as per specification.

Get approved HVAC Shop Drawings, MEP- Coordination Drawings, Work method statement and Project Specification from Project Engineer.

Ensure the HVAC Ducts, Fittings, accessories and Child water pipes, fittings, accessories are available and approved by Inspection department prior to installation.

Ensure sufficient hand tools, power tools, ladder and scaffolding are available for installation.

Coordinate with other discipline and ensure site clearance is available to start the HVAC Activities.

Provide approved HVAC Shop drawing, MEP Co-ordination Drawing to site supervisor (or) Foreman and inform them to shift the required ducting and piping approved material from warehouse to site and arrange required material to avoid progress delay.

Closely monitor site activities to ensure quality of work is in compliance with approved shop drawing and Specification and get daily progress report from site supervisor (or) foreman and update to project Engineer (or) Manager.

Checking and preparation of Shop Drawings of Fire System as per NFPA standards.

Installation of Fire Fighting system as per approved drawings. SAUDI REAL ESTATE CONSTRUCTION CO.

(04-OCT-2017 TO 01-APRIL-2019)

CLIENT: ALKARIA

CONSULTANT: AMO & PARTENERS ENGINEERING

Project Value: 225 million SAR

Post : Mechanical Site Engineer and QC Engineer

PROJECT: AL REMAL ( AL DHAHIA HOUSING COMPOUND Thumamah, Riyadh Saudi Arabia (Near Airport) VILLAS: 568, School, Mosques, office and roads. DUTIES AND RESPONSIBILITIES

Monitoring and administering the QA/QC plan or programmed and ensuring incorporated material on construction projects are in compliance with the plans and specifications.

Assuring that the work is performed as required by the contract and meets or exceed the required qualities.

Assuring the acceptable quality of material,processes, and the workmanship in the project work.

Azhar Muzaffar/ RESUME P a g e 4

Maintain standards od safety and comply with company’s health, safety and environments drawing.

Verify that welding joint has been performed as per specifications and joint have been released.

Verify the piping material identity (pipe,valves and fittings) and its conformance to the installation drawings.

Verifiy that dimensions and alignment tolerances of piping system as per the constructs specifications.

In-process surveillance to verifiy compliance with specified piping erection procedure including flange alignments and cleanness etc.

Performing piping walk down inspection and completing punch lists. Verifying that punch list items have been dealt with in accordance with the contractual arrangements.

Reviewing and verifying completeness of piping test packages ( hydro or pneumatic) prior to testing.

Witness final piping and HVAC testing.

Completing and endorsing all inspection records from initial inspection till final acceptance of HVAC sysyem.

Coordination with main contractor’s and consultants regarding inspection and attand weekly meeting.

Ensuring that all concealed works are completed satisfactorily and accepted by consulatant before clearing to civil and finishes team.

To prepare “shop drawings” and “MEP coordination Drawings” and prepare “As-built Drawings” .

Following up with the client for approvels( Materials, Drawings and other).

(J&P) JOANNOU & PARASKEVAIDES (SAUDI ARABIA) LIMITED. BUILDING AND CIVIL ENGINEERING CONTRACTOR

CLIENT: SAUDI BASIC INDUSTRIES CORPORATION (SABIC)

(25-July-2015 to 30-september-2017)

Post : Mechanical Site Engineer and QC Engineer

PROJECT: Al Waseel Hill SABIC Riyadh Compound (Near Dariyah Riyadh KSA) PROJECT VALUE: USD 562 MILLION

CONSTRUCTION OF PHASE-1-A RASIDENTIAL COMMUNITY FOR SABIC EMPLOYEES IN RIYADH.WORK INCLUDES CONSTRUCTION OF 623 NO. VILLAS, 5 NO. APARTMENT BLOCKS OF TOTAL 62 NOS. APARMENTS, AND A NUMBER OF COMMUNITY AND COMMERCIAL FACILITIES SUCH AS MARKET, MOSQUES, SCHOOLS, CLUBHOUSES, VARIOUS MALE AND FEMALE RECREATION AREAS AND INTEGRATED PARKS AND PLAZAS. THE RESIDENTIAL VUILDINGS WILL BE BUILT TO ACHHIEVE LLED SILVER RATINGS UNDER THE LEED FOR HOMES RATING SYSTEM FROM USGBC-USA.

DUTIES AND RESPONSIBILITIES

Monitoring the phases of quality control of work as per specification.

Develop and maintain inspection procedures and techniques,throughout The construction, pre-commissioning and commissioning stages.

Maintain accurate and calibrated inspection tools and equipment for Consistent measurements of operation of the inspection and testing system.

Report on daily inspection and testing activities and issuing non-conformance reports when the specification or procedural requirements are not met.

Maintain inspection and testing records.

Coordination with main contractor’s MEP coordinator and Consultant on all aspects of site inspections.

Azhar Muzaffar/ RESUME P a g e 5

To conduct surveillance on the inspection tests required in the technical provisions of the specification.

To carry out the preparatory, initial and follow up inspections as per the approved ITP.

To perform and witness all testing required at sub-vendors premises and approved independent testing laboratory as recommended.

Ensuring that all concealed works are completed satisfactorily and accepted by consultant before clearing to civil and finishes team.

Monitoring and administering the QA/QC Plan or Program and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.

Assuring the acceptable quality of materials, processes, and workmanship in the project work.

Issue materials receiving report for the delivered materials.

Maintain standards of safety and comply with Company’s Health, Safety And Environment Management System requirements.

Follow and maintain Company standards of Quality in accordance With Company Quality System requirements.

Possess knowledge in inspection of HVAC, firefighting and plumbing systems and will have knowledge of International codes/standards.

Exposure to local authorities’ rules and regulations will be distinct advantage.

Capable of handling projects with minimum direction and supervision.

Performing visual inspection of piping installation including.

Verifying piping material identity (pipe, valves and fittings) and its conformance to the installation drawings.

In-process surveillance to verify compliance with specified piping erection procedure including flange alignments, torturing, cleanliness etc.

Performing piping walk down inspection and completing punch lists.

Verifying that punch list items have been dealt with in accordance with the contractual arrangements.

Reviewing and verifying completeness of piping test packages (Hydro or pneumatic) prior to testing.

Witnessing final piping tests.

Coordinate all QA/QC activities with the site QC manager.Coordinate all QA/QC activities with the site QA/QC procurement Manager.

Control all achieves documentation upon the completion of the Project. South Hill Contracting Riyadh (Saudi Arabia)

Sub-Contractor: VOLTAS LIMITED LLC (OLYAN GROUP) Riyadh Saudi Arabia CLIENT: Khatib & Alami

Post : Mechanical site Engineer (HVAC/PIPING) (01st Aug. 2014 – 20 Jul. 2015) Type of project: Installation of Boiler and chiller with piping Mechanical & Electrical, Butterfly valves, Modulating butterfly valves, Gate valves, NRV (None Return valves), Y- Steiner, Drain valves, instrumentation sensor, TIT Sensor, PIT sensor, Painting of all pipe lines, Fabrication for pipe Supports, 6G & argon welding of pipes, RT and NDT Test, insulation And cladding Installation. Electrical: Installation of Cable tray, Electrical MV, LV panels and cable pulling with final termination.

DUTIES AND RESPONSIBILITIES

Well verse with engineering drawings and principles.

Able to solve problems using both logic and creative/innovative Approaches.

Excellent communication skills.

Strong in learning the new methodologies of mechanical Engineering.

Ability to take instructions.

Generally responsible for implementations and monitoring of all mechanical Related works at site as per approved drawings and Methods and safety rules.

Estimates, prepares and assigns the resources such as manpower, materials, Consumables, Azhar Muzaffar/ RESUME P a g e 6

Academic

Qualification

equipment, tools, etc., required for all Mechanical and related Works prior to execution. Plans and analyses all possible construction at site.

Interprets construction drawings and studies the contract Documents and Applicable standards or specifications prior to Execution of any jobs.

Manages directly and provide engineering and technical supports to all the Mechanical work groups at site.

Plans the execution of all Mechanical related works and coordinates the Works to Electrical and civil groups.

Able to lead site personnel to execute and completion of job on time at Site.

Good in MS Office 2010(MS Word, MS Excel, MS PowerPoint). Amber capacitors Ltd.16 Link McLeod Road Lahore

Post : Mechanical Site Engineer (15-Sep-2013 to 10-Mar-2014) DUTIES AND RESPONSIBILITIES

Able to solve problems using both logic and creative/innovative Approaches.

Manages directly and provide engineering and technical supports to all the Mechanical work groups at site.

Strong in learning the new methodologies of mechanical Engineering.

Carrying out all Mechanical Works and equipment’s installation activities.

Pre-resolve any unexpected technical difficulties and other problems at site that may arise at any time.

Able to lead site personnel to execute and completion of job on time at Site.

Lathe machine installation.

Milling machine installation.

Drill machine installation.

Shaper machine installation.

CNC Operating (Computerized Numerical Control).

Sugar & Distillery Division Phalia (Pakistan)

Position : Mechanical site Supervisor (01-Aug-2012 to 15-Aug-2013) DUTIES AND RESPONSIBILITIES

Supervising workers, subcontractors and work activities.

Preparing and presenting site inductions, safety briefings and toolbox talks.

Assessing and managing safety hazards.

Ensuring appropriate site rules and welfare facilities are in place.

Carrying out regular inspections.

Helping project managers to plan the work programme.

Helping co-ordinate deliveries of materials, plant and equipment.

Completing records for site reports.

Attending site management meetings.

Carrying out regular inspections to ensure compliance with relevant legal requirements, processes and procedures.

Raising safety concerns at the appropriate level.

Resolving problems and implementing improvements.

Organising and overseeing external inspections, such as with a health and safety inspector.

Providing emergency first aid if required.

Mechanical Associate Engineering 2012

1

st Division

Azhar Muzaffar/ RESUME P a g e 7

Language

Diploma

Govt. Swedish Pakistani College of technology Gujrat (Pakistan) Board of Technical Education Lahore.

TEST BY HEC

Basic Italian Language

(Dovile International language Training Center Italy) 2013 Reference Reference shall be provided on Demand

I hereby certify that the above particulars furnished by me are true and accurate to the best of my knowledge. Originals Certificates will be forwarded upon request. Azhar Muzaffar/ RESUME P a g e 8

Azhar Muzaffar/ RESUME P a g e 9

Azhar Muzaffar/ RESUME P a g e 10

Azhar Muzaffar/ RESUME P a g e 11

Azhar Muzaffar/ RESUME P a g e 12

Azhar Muzaffar/ RESUME P a g e 13

Azhar Muzaffar/ RESUME P a g e 14

Azhar Muzaffar/ RESUME P a g e 15



Contact this candidate