Post Job Free
Sign in

Piping, Vessel, RBI, Welding, NACE, NDE Inspector

Location:
Port of Spain, Trinidad and Tobago
Posted:
July 10, 2020

Contact this candidate

Resume:

Abdul Kadir Ali

# * *** ******, ******* ******,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

Ref : Multi-Disciplined Inspector - API 510 / 570 / 580, AWS CWI, NACE CIP Level I & II, NACE Basic Corrosion, NDT - ASNT (MT, PT, UT) Level II, Mech. Diploma.

Summary

I am writing to apply for the position of a Multi-Disciplined Inspector as I am certain that my qualifications and inspection experience are a perfect combination for this position. I possess certifications in AWS Certified Welding Inspector and NACE CIP level II & Basic Corrosion. I also possess Asset Integrity related certifications such as API 510 Pressure Vessel Inspector, API 570 Piping Inspector and API 580 Risk Based Inspector. To complement this, I also possess training and certification in failure analysis from Shell M285-Diagnosis of Engineering Failures, Non- Destructive Testing certifications in accordance with ASNT-SNT- TC-1A Level II: MT/PT/UT and I have graduated with a Mechanical Engineering Technician’s Diploma in 2016. I am also currently perusing API 653 and schedule to take the examinations in the near future.

I have been employed within the Oil Refining and Construction Industry as a Plant Inspector, Quality Control Inspector and NDT Inspector for the past twelve (12) years. I was employed at Trinidad Inspection Services for 6 years as a NDT / Pressure Vessel / Piping Inspector and The Petroleum company of Trinidad and Tobago (PETROTRIN) for 6 years as a NDT & Plant Inspector. Thereafter I worked with Massy Wood at Atlantic LNG on the Liquid Thermal Oxidation Project as a QA/QC inspector. I have also worked on various projects as a Welding, Vessel and Piping inspector for companies such as Methanex, LNG, Air Liquide, Mitsubishi Heavy Industries, CGCL and IPSL Downstream - Melamine, UAN, UREA and Utilities plants on contractual basis.

My position holds me accountable for various Inspections Practices, reporting, and recommending solutions. I am also responsible for Maintenance Activities such as Coordination and

+AREAS OF EXPERTISE

Piping Inspector

In-service Piping Inspection

Turn-Around Inspection

Plant-Piping Inspection

Offsite Piping Inspection

Process piping Construction

Piping Repair Inspections

Piping Modification Inspections

Piping coating Inspection

Piping Insulation inspection

Internal inspections-large bore

Borescope Inspection-small bore

Identifying CUI

Identifying Dead-Legs

Compose Reports and

Recommendations

Pressure Vessel Inspector

External Vessel Inspection

Internal Vessel Inspection

PRV Inspection

Vessel Repair Inspection

Vessel Coating Inspection

Vessel insulation Inspection

Vessel Liner inspection

Compose Reports and

Recommendations

Risk Based Inspection

Risk Ranking Failures

Probability x consequence

inspection type approach

Certify Welding Inspector

Inspection of Welds

Qualify Welding Procedures

Qualify Welders

Review WPS

Review PQR

Review WPQ

Welding Audits

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

execution of Inspections such as Piping, Vessels, Coating, Insulation, Welding, Lifting, NDTs and conduct Audits such as Witnessing contractor Inspections and Review of Procedure Qualification Records (PQR) & Welding Procedure Specifications

(WPS). I am familiar with working with contractors in developing Inspection and Test Plan (ITPs), Quality Control Plans (QCPs), work procedures and job safety risk assessment. I have worked with Inspection Engineers and an Inspection team in creating recommendations and the implementation and execution of corrective actions to address work request created. A crucial part of my job is to conduct visual inspections, quality checks, review NDT results and recommend practical and timely solutions Additionally, I have experience with working API codes and standards and company Engineering Standards. Coordinating with planning and the Health and Safety department are also within my portfolio. This experience will prove to be an asset to your company since I possess key knowledge and experience required for this position.

I have attained various safety training such as Permit to Work, Confined Space, Job Hazard Analysis, Fire training, National Safety Council NSC-CPR First Aid and NSC-Automated External Defibrillator training. I have a keen interest in the Oil and Gas industry and certain to integrate into any environment. I welcome the opportunity in meeting with you to confer how my experience and knowledge can add to your company’s benefit. If you have any further questions please contact me by phone at 388-7418 / 345-6087 or by e-mail ***********@****.***. I have enclosed my resume for your review and I look forward to hearing from you.

+AREAS OF EXPERTISE

NDT inspections

Magnetic particle inspection

Visible / Fluorescent

Penetrant Testing

Visible / Fluorescent

Ultrasonic Testing

Thickness Gauging

Ultrasonic Testing Flaw

Detection

Hardness Testing

Copper Sulphate Testing

MFL Testing

Vacuum Box Testing

Positive Material Identification

X-Ray Florescence

Compose NDT Reports

Generate Non-conformances

NACE Basic Corrosion

Blasting Surface Preparation

Epoxy Coating

Polyethylene Coatings

Holiday Detection -

Direct current/Pulse

Wet sponge

Drawings

Pipeline Isometric Drawings

AutoCAD

Quality Assurance/ Quality Control

Coating Audits

NDE Audits

Establish Hold Points

Radiography Co-ordination

Weld Map

Develop and Populate (QCP)

Quality Control Plans

Compose welder History

Maintain Quality documents

Generate Final Completion

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

Highlights

Pressure Vessel inspection

Process Piping Inspection

Coating Inspection

NDT :

Magnetic Particle Inspection

Penetrant Testing

Ultrasonic Thickness Gauging

Hardness Testing

Holiday Detection

Ultrasonic Flaw Detection

Robotic Crawler Thickness inspection

Developing Scope of works for maintenance activities.

Quality Control / Quality Assurance

Conduct site visits related to Maintenance activities

Develop and Approve an Inspection Test Plan and Quality Control Plan for maintenance activities

Coordination of maintenance works in a safe and timely manner

Preventative Maintenance / Corrective Maintenance.

Review Non-Destructive Testing procedures and maintain records.

Coordinate Welding activities and provide technical support.

Reviewing Welding Procedures / Welder Certificates.

Reviewing contractor Inspection Reports / Documents.

Technical Reporting.

Material Test Report reviews and Positive Material Identification (PMI) checks

Coating / Insulation QAQC.

Generating / reviewing / updating inspection test plans.

Coordination and execution of Inspection and Maintenance activities

Create Material Take Off for execution work.

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

Certifications

Mechanical Engineering Technician’s Diploma

Level 2 Diploma in Engineering – Maintenance Technology Certificate # 600/0881/7

American Welding Society (AWS):

AWS Certified Welding Inspector: Inspection, Quality Assurance / Quality Control, Welders tests, Welding Procedure, Heat treatment and NDE of Welds and Materials. Certificate # 15094071

National Association of Corrosion Engineers (NACE): CIP Level I: Technical and practical fundamentals of coating inspection work. Conduct basic coating inspections using Non Destructive techniques and instrumentation. CIP Level II: Advanced inspection techniques and specialized application methods for both steel and non-steel substrates, including concrete using both non-destructive and destructive techniques. Surface preparation, coating types, inspection criteria, lab testing, and failure modes for various coatings, including specialized coatings and linings. Basic Corrosion: Corrosion and the methods by which it can be identified, monitored, and controlled.

Certificate # 339081

American Petroleum Institute (API):

API 570 Piping Inspector

In-service Inspection, Rating, Repair, and Alteration of Piping Systems Certificate # 50183

API 510 Pressure Vessel Inspector

In-Service Inspection, Rating, Repair, and Alteration Certificate # 44382

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

API 580 Risk Based Inspection:

Inspection strategy basis Probability and Consequence of Failure Certificate # 56800

Shell M285:

Diagnosis of Engineering Failures: Root cause analysis strategy. Non-Destructive Testing Certifications:

SNT-TC-1A LEVEL II: Magnetic Particle Inspection

SNT-TC-1A LEVEL II: Penetrant Testing

SNT-TC-1A LEVEL II: Ultrasonic Flaw Detection

CINDE: Ultrasonic Thickness Gauging

Eddyfi Technologies:

Ultrasonic Thickness Robotic Crawler Operator Training Certificate # 2359.02.19

Additional Training and Requirements

Working on heights Training

Permit to Work Training and Job Hazard Analysis

NSC First Aid and Fire Training

Excavation Safety Training

Lifting Safety

Confined Space Training

Bore-scope Operator Training

Ultra-Pipe Corrosion Monitoring Training and Auto Cad Tropical Basic Offshore Safety & Emergency Training (TBOSEIT) General Industry Health and Safety Training

PLEA Training

UKOOA Medical expiry – 23/11/2020

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

Profile

A team player whose goals are to excel and contribute significantly in the Oil and Gas sector and to work hard in achieving professional growth and meeting employer’s expectations. NAME: Abdul Kadir Ali

ADDRESS: 8 Rex Street, Charles Street, Gasparillo. AGE: 31 years

CONTACT #: (Cell) 388-7418 / 345-6087

E-MAIL: ***********@****.***

DATE OF BIRTH: 01st June 1988

MARITAL STATUS: Married.

CURRENT EMPLOYER: Professional Inspection Services Limited. PREVIOUS EMPLOYERS : Caribbean Petrochemical Inspection Services Limited

: Massy Wood –LNG

: Professional Inspection Service Limited

: In-Corr-Tech Limited

: Petroleum Company of Trinidad and Tobago

: Trinidad Inspection Services Limited

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

EDUCATION:

Mechanical Engineering Technician Diploma

Completed at the Automation Technology College, Chaguanas, Trinidad Currently pursuing

API 653

Professional Experience

CARIBBEAN PETROCHEMICAL INSPECTION SERVICES

- AUM Downstream TAR

- Pressure Vessel Inspection

- Process Piping Inspection

- As-found inspection

- Coordinate NDE works

- Hydrotest

- Cleanliness Inspection

- Box-up inspection

- Generate final reports

MASSY WOOD

May 2019-Sectember 2019

• QA/QC inspector

• Piping inspection

• Pressure vessel inspection

• Welding inspection

• Coordinate NDE works

• Hydrotest

• Civil works Inspection

• Bag house Inspection - Installation of main structure

• Compiling final dossiers and packages

• Peer review of final packages

• Torque Verifications

• Flange Management

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

PROFESSIONAL INSPECTION SERVICES LIMITED-

February 2019-May 2019

• Methanex Titan TAR

• Pressure Vessel Inspection

• Welding Inspection

• NDT Inspection

• Ultrasonic tank crawler inspection

INCORRTECH LIMITED – (Contract) November 2018-Feburary 2019 PROJECT: MITSUBISHI HEAVY INDUSTRIES

• Construction Inspections

• Process piping Inspections

• Pressure Vessel Inspections

• Quality Control

• NDT Co-ordination

• Inspection of structural members and supports

• Welding inspection

• Review fabrication drawings

• Coordinate construction works and establishes inspection hold points

• Inspection of tanks

• Coating Inspection

• Cleanliness Inspection

• Box-up inspection

• Torque Verifications

• Alignment checks

• Elevation checks

• Contractor co-ordination

• Refractory inspections

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

PETROTRIN-August 2013 – 2018

POINTE-A-PIERRE REFINERY

Ultrasonic Thickness Measurements, Penetrant, and Magnetic Particle Inspections

Ultrasonic Weld Inspections (Ultrasonic Shear-wave)

Inspection of plant process piping

Inspection of process offsite piping

Inspection of Sea-lines

Inspection of pressure vessels

Lifting equipment inspection

Inspection of structural members and supports

Welding inspection

Review fabrication drawings

Inspection of loading hoses

Coordinate welders test

QA/QC activities

Leak log reports

Vacuum Box Testing on Tank Bottoms

Material verification using Alloy Analysers and reviewed Material Test Certificates

Physical testing on materials and welds (Hardness, Hammer test, Dimensional, and Visual)

Holiday Testing on wrapped piping

Painting substrate inspections, Surface Profile and Paint Thickness Measurements

Contracted Non-destructive Testing Technicians supervised and directed

NDT Results reviewed for accuracy and alternative proving inspections executed

Test Reports generated for all above Inspections/Testing and records updated

Drawn Free-hand piping isometrics on new piping and modifications

Compiled Piping Packages with access and de-insulation information

Signed-off Quality Control Forms (for stage inspections) and executed Quality Control Plans

Inspection tools and equipment in working order and calibrated Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

PROJECTS during my tenure at Petrotrin:

4VDU 2014 TA – NDT/ Piping Inspection

8CDU 2014TA – NDT/ Piping Inspection

2VBU 2014 TA – NDT/ Piping Inspection

2Unifiner 2014 TA – NDT/ Piping Inspection

1HTU 2015 TA – NDT Inspection

2HTU 2016 OUTAGE - NDT Inspection

4VDU 2017 OUTAGE -NDT Inspection

SRU 2017 OUTAGE -NDT Inspection

GIRBOTOL OUTAGE – NDT/ Piping inspection

LPG OUTAGE -NDT Inspection

FCCU Fractionator column Temperature monitoring Programme -NDT Inspection 2HTU Reactor Temperature monitoring Programme -NDT Inspection CCR NHT Piping UT monitoring -NDT Inspection

Isom NHT piping monitoring -NDT Inspection

Tankage UT programme -NDT Inspection

OFFSITE PIPING UT Programme – NDT/Piping Inspection SEALINE UT programme – NDT/Piping Inspection

Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

TRINIDAD INSPECTION SERVICES LTD - February 2007-August 2013:

API 510 Pressure vessel Inspection

API 570 Process piping Inspection

Developing Inspection frequencies

Developing Inspection plans

Compiling work list

Compiling Inspection reports and results

Contracted Non-destructive Testing Technicians supervised and directed

NDT Results reviewed for accuracy and alternative proving inspections executed

Test Reports generated for all above Inspections/Testing and records updated

Executed piping UT-thickness data entry in to Ultra-pipe Software

Drawn Free-hand piping isometrics on new piping and modifications

Allocating CML points

Reviewing UT data and writing reports

Ultrasonic Thickness Measurements, Penetrant, and Magnetic Particle Inspections

Ultrasonic Weld Inspections (Ultrasonic Shear-wave)

Magnetic Flux Leakage and Vacuum Box Testing on Tank Bottoms

Material verification using Alloy Analysers and reviewed Material Test Certificates

Physical testing on materials and welds (Hardness, Ferrite Content, Dimensional, and Visual)

Thermographic Inspections on Hot Equipment

Holiday Testing on wrapped piping

Painting substrate inspections, Surface Profile and Paint Thickness Measurements

Compiled Piping Packages with access and de-insulation information

Signed-off Quality Control Forms (for stage inspections) and executed Quality Control Plans

Inspection tools and equipment in working order and calibrated Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

PROJECTS during my tenure at Trinidad Inspection Services Limited: Methanex: 2007 – NDT Inspector, QA/QC Services

Weldfab Ltd: 2007-2008 - NDT Inspector

Trinweld Ltd: 2007-2012 - NDT Inspector, QA/QC Services Kennicon Ltd: 2012 - NU IRON -Welding Inspector, QAQC Services PPGPL: 2012 July-September- Plant Inspector Services, QA/QC Services AUM (Up Stream & Downstream): 2012 February-June Plant Inspector Services Methanol (M1 – M5):2007-2010 Shutdowns- NDT Inspector NGC: NDT Inspector/ Vessel Inspector

NU-IRON: 2012 & 2013- Welding Inspector, QAQC Services Mittal Steel: 2007 -QA/QC Services

CNC: 2009-2010- NDT Inspector

Well Services: 2010-2013-Rig 110, 152, 50, 101- NDT Inspector, QA/QC Services Tofco:-2007-2010- NDT Inspector, QA/QC Services

CBI-2009-2011 FCCU UPGRADE: NDT Inspector, QA/QC Services AESL: (PETROTRIN) 2012 September-December- Welding Inspector, QAQC Services Samsung Engineering (PETROTRIN):2011-2012- NDT Inspector, QA/QC Services JGCL (PETROTRIN):2011-2012- NDT Inspector, QA/QC Services YARA: NDT Inspector, QA/QC Services, Ultrasonic Robotic Crawler Abdul Kadir Ali

# 8 Rex street, Charles street,

Gasparillo, Trinidad, WI.

Home) 345-6087, (Cell) 388-7418,

***********@****.***

Reference

Nicolas Komal

QA/QC inspector

Massy Wood LNG

359-3119

Kumar Narine

Inspection Engineer

Atlantic LNG

770-8406

Hayden Chin Wing

Plant Inspector,

Mentor IMC LNG

735-6649

Mikail Khan

Reliability Engineer,

Wally Parsons

681-9178

End of Resume



Contact this candidate