RESUME
NAME: UCHECHUKWU CHIBUEZE NWUFOH
NAME OF PROPOSED POSITION: Electrical QA/QC Inspector
AGE : 33 YEARS
Total Experience: 7 YEARS
Sex : MALE
Nationality : NIGERIA
Contact No: 050*******
Email ADDRESS: ***********@*****.***
QUALIFICATION
ACADEMIC / EDUCATION QUALIFICATION
2012: Nnamdi Azikiwe University Awka, Anambra State, B.Sc. Electrical Electronics Technology
2006: Rhoda Heartfelt Secondary School, Akpajo Rivers State. Senior Secondary School Certificate Examination (SSCE)
2000: Igwebueze Nursery and Primary School First School Leaving Certificate (FSLC)
2014: Mandatory National Youth Service (NYSC)
2014: Basic Mandatory (STCW)
2015: Motorman
2016: International Ship and Port Facility Safety (ISPS)
2016: Certificate of Competence (COC)
2017: Gasos Trained and Certified ADCO JP/JO PTW 2017-2020
2017: TUV-NORD Trained, Task Risk Assessment (TRA) 2017
2017: Safety Zone and Consultancy Trained, Confined Space Awareness 2017 – 2020
2018: TUV-NORD –NEBOSH- Process Safety Management
2019: ISO 9001- LEAD AUDIT
2019: QA/QC MANAGEMENT
2020: GULF COAST CERTIFIED: HV/MV/LV Electrical Equipment Tester
2020: ALISON
Critical Facility and Critical Infrastructure
Critical facility power supply management
Introduction to basic electrical wiring system
Introduction to electrical drawing and test equipment
SUMMARY OF EXPERTIS
An industrious Electrical Electronics professional with more than 6(Six) years of experience in both Private and Multinational Oil and Gas, Petrochemical, Power and General Construction and Pipeline companies as supervisor /Job performer in Mobile network Telecommunication tower construction, pre-commissioning and commissioning and Maintenance Work activities
KEY PROJECTS & POSITIONS HELD
Position
Project
Period
ELECTRICAL/INSTRUMENT QC INSPECTOR (CPECC)
BAB INTERGRATED FACILITY PROJECT
(BIFPADNOC) CONTRACT NO16376.01
AUG 2018- FEB 2020
ELECTRCAL/INSTRUMENT QC INSPECTOR (CPECC)
MENDER FULL FIELD DEVELOPMENT
PHASE 1(ADCO) PROJECT NO P23001
MAY 2016 – JULY 2018
ELECTRICAL/INSTRUMENT JOB PERFORMER
MENDER FULL FIELD DEVELOPMENT PHASE 1(ADCO)
FEB 2014-2015
Supervisor.
NOSKY ENGINEERING SUPPLYS. Nvuigwe Power Transformer Installation. Rivers state
2013
3rd Engineer
FYMAK MARINE AND OIL SERVICES LIMITED. Lekki Lagos, Nigeria
2010 2012
EXPERIENCE:
sound knowledge in cable laying (underground and surface) FOC, High Voltage, medium, and low voltage cables and installation of instrument support stands.
Valuable experience on Transformer installation, Pre energising and Energising activities
Familiarised with circuit breakers, isolators, switch gears, earth switch and lighting transformers
Familiarised with generator transformers and heavy engine electronics
TEST KIT FAMILIARITY
AEL make AC high voltage test kit
HL/LT Megger
Micro ohm meter Scope & MOM600A
Primary injector testers
Heavy duty engine actuators
Electronic fuel pumps(heavy duty engines)
Cathode Ray Oscilloscope(C.R.O Monitors)
Earth Resistance Test
Residual current drive test kit RESPONSIBILITY
Operation, maintenance, testing and commissioning of HT/LT panels
Primary Injection testing and secondary injection testing for circuit breakers
Tested up to 12.5MVA TRANSFORMERS
Testing and commissioning of Bus bars, rising mains, earth pit
Managing over all involved in erection of instalments, testing, pre commissioning and maintenance of various electrical equipment’s
Testing and maintenance of Actuators
Execution of work as per drawings and also modification and condition of site
Attending review meeting and reporting daily work progress to authority in charge
Making relay settings using client specification
Planning schedules for subsequent jobs.
CHINA PETROLEUM ENGINEERING AND CONSTRUCTION COPERATION
Project: BAB INTEGRATED FACILITY PROJECT
CLIENT: ADNOC (Abu Dhabi National Oil Company)
DESIGNATION: Electrical / Instrument Inspector
Accountable for developing and obtaining approval for project quality document such as project quality plan, QCI procedures, inspection test plan (ITP) in accordance with project specification
Maintaining quality standards on site and correlating with contractor counterparts to resolve day to day issues.
Assessing quality documents of sub contractors and attending work coordination meetings on site
Leading inspection and test activities as per approved ITP’s in accordance with third party
Sustaining an updated calibration list of measuring instrument
Organizing site quality meetings in coordination with project manager or other relevant bodies
Conduct inspection on all electrical and instrumentation construction or installation activities
Enforcing quality management system as laid down by the cooperate QHSE Manager
Analyse information obtained from inspections and compare with applicable standards and codes
Inspection and testing of all underground Earthing network for motors, switchgears, steel structures of sub station.
Monitoring of high voltage, low voltage, control and instrument cables termination and IR/Continuity testing
Liaise with company Engineering and pre commissioning team together with vendors to check and sign off E&I completion dossiers and inspection test records.(ITR’s)
Prepare CAR’s or NCR’s found at site and ensure that they are fully rectified and satisfactory
Responsible for daily site surveillance and log book entry for site discrepancy
Conduct surveillance inspection and report if non conformance and violation of project standard is noticed
Daily site surveillance of electrical/ instrument works which are in progress and confirming if they are in accordance with clients specifications, details, and drawings
Ensure that all installations have been carried out in accordance to project specifications and standard
Ensure that safety rules and regulation of the project is upheld
CHINA PETROLEUM ENGINEERING CONSTRUCTION COPERATION
PROJECT NAME: Mender Field Development Phase 1
CLIENT: ADCO (Abu Dhabi Company of Onshore Oil Operation)
DESIGNATION: Electrical/Instrument QC Inspector
Responsibilities
Sound knowledge of International standard/Area classification
Ensure that documentations generated by sub contractors inspections, request for inspection checklist, and test surveillance meets the requirements of project quality plan
Scheduling and carrying field inspections as per approval ITPs. Final sign off of all QC checklist.
Site visitation to ensure that work is being carried out according to current revisions of drawings and specifications.
Inspection schedule coordination to AOL/owners engineers inspectors.
Verification of all materials, equipment’s and cables are in accordance with specifications/Ratings, installation procedure and shop drawings have been approved before the installation activities.
Preparation of method statement, ITP and testing procedure format as per ITP consisting of standard installation and testing procedure of project specification.
FIN/FIR receiving monitoring control.
Discussing construction quality inspection status and results, if requirements are been met.
Attending to AOLs comments and closing of issued SOR/CAR/PAR/NCR
Discussing priorities and non priorities scope and activities.
Monitoring of site in areas that involves the safety and protection of installed equipment’s/devices and other materials that are kept within construction area.
Ensure that all instruments and cable have been installed, tagged, aligned, and correctly wired in accordance with requirements of the approved drawing, manufacturer’s instruction and specifications.
Ensure the completion of all documentations reference testing, inspection, recording, and reporting.
Issuance of CAR/SOR/NCR to non conforming works and activities that are carried out on site.
Inspection work status report update and monitoring complete work against remaining work.
Ensure that test equipment required has been calibrated in accordance with the specification of the relevant standards and specification, also ensure that test is carried out with respect to safety procedures;
Reviewing the instrumentation scope of work, drawings and executing the construction and maintenance activity in line with project specification and standards.
Prepare request for inspection to clients and inspections of acceptance of installations and testing.
Coordinate quality procedures for construction department, project management and client inspectors and corrective actions for client inspection comment/punch list.
Preparation and checking of termination drawing, instrument loop schematic and wiring diagrams I/O list, cause and effect diagram, fire and gas detection drawings P&ID drawings logic diagrams.
Responsible for clearing the technical queries with consulting client engineer and design department.
Planning/scheduling information and Man hour estimates to complete the instrumentation scope works.
Coordinating with sub contractors for various construction and material issues
Coordinating with vendor/supplier on procurement of materials
Preparation of MAS (Material Approval Sheet).
Preparation of daily, weekly, monthly progress report.
Prepare the action list for weekly design and procurement meeting.
Prepare monthly progress report and progress presentation.
Planning and scheduling the 3 week program.
Coordinating with site supervisor to ensure that, installations, termination and testing of field U/G & A/G conduits, cable trays and tubing for instruments
Supervision of installation and termination and testing of MV SWGR, LV MCC and transformers installations.
Liaising with site supervisor on installation and calibration of instruments, such as, transmitters, pressure switches, level switches, control valves, temperature sensors, fire and gas detector, mass flow meters, radar tank gauging, motor operated valves (MOV).
Preparation and checking of hook up drawings for field instruments, instrument location and cable routing diagram, instrument duct/trench layouts, cable routing layout, control room layout and cable schedule.
Preparation of hand over document.
CHINA PETROLEUM ENGINEERING CONSTRUCTION COPERATION
PROJECT: MENDER FIELD DEVELOPMENT PHASE
DESIGNATION: ELECTRICAL / INSTRUMENT Supervisor
LOCATION: MENDER
CLIENT: ADCO (Abu Dhabi Company of Onshore Operation)
Responsibilities
Conducting tool box talk prior to start of work.
Enforcing strict adherence to laid down safety regulation
Attending TRA meetings
Ensure that all documents regarding permits are onsite and updated
Reminding workers of their individual responsibilities
Ensure that right tools are used to carry out specific activities
Link between workers and management and also management and clients
Ensure that all worker are working safe by providing right PPE for day to day activity
Ensure that materials are not wasted
Ensure that jobs are carried out according to specification from QC and engineers
Provide basic amenities on site
Ensure that each activity being carried out is in adherence to Method Statement and TRA
NOSKY ELECTRICAL ENGINEERING NIGERIA LIMITED
DESIGNATION: Site Supervisor
Location: Port Harcourt Rivers State
CLIENT: Obiokpor local Government
DURATION: Sept 2012 May 2013
Responsibilities:
Logistical involvement in procurement and transportation of Transformer from ware house to site location.
Supervision of Loading and offloading of transformer from warehouse to site location.
Inspection of concrete pad of base 8ft by 9ft and 10in thickness.
Acceptance test and damage inspection.
Oil leakage test through bushings, gaskets, or welded joints.
Supervision of transformer lifting operation, to ensure that it is lifted in a gentle manner during upward lifting
Ensuring that transformer height reaches required standard (IEC)
Supervision of Insulation resistance test (IR) using a 1000v megger unit.
Ensure that protective coatings on terminals are not tampered with to prevent oxidation of transformer terminals.
Ensure that washers are not installed between terminal lugs and bus bars to prevent over heating of connections.
Ensure that only UL lugs are used.
Ensure proper spacing of cables
Ensure that the required standard are followed for sound control.
Supervision of grounding process following NEC recommendations and also ensuring that neutral wires are also grounded as applicable.
Supervision of continuity test.
Pre Energizing of 3 phase electrical transformer line to ground and line to line voltages.
FYMAK MARINE AND OIL SERVICES NIGERIA LIMITED.
DESIGNATION: Third Engineer
LOCATION: Lagos Nigeria
CLIENT: Exxon Mobil
Responsibilities
Daily Pre starting and starting operation, daily routine checks, carrying out maintenance jobs
Draining of compressor tank.
Monitoring of air filter gauge to ascertain when it is due for change.
Monitoring heat exchanger gauge or meter.
Servicing of pneumatic pumps.
Monitoring oil pressure.
Monitoring gear oil pressure.
Monitoring water pressure.
Changing or servicing of jet solenoids.
Servicing of engine actuators.
Changing of vessel horn bottle.
Operating water hydrant from vessel bridge.
Fault findings with indicators in the bridge and rectifying them.
Monitoring gear box pressure
Servicing of air blowers (both ventilator and extractor)
General servicing of engines and auxiliaries
Maintenance of engine control module(ECM)
Maintenance of jet module control (JCM)
Rectification of JCM and ECM errors
Setting of spool valve with the aid of the JCM
Changing of auxiliary intercooler
Servicing of engine air starter or kick starter
Changing or replacement of lighting appliances
COMPUTER SKILLS:
• Microsoft Word, Outlook, Internet, etc.
PERSONAL SKILLS & ABILITIES:
Vibrant, optimistic and always open to new ideas. Adaptability and optimum dedication to work, ability to correlate with people diplomatically, and willingness to learn.