Post Job Free

Resume

Sign in

Engineer Plant

Location:
Wixom, MI
Posted:
July 10, 2020

Contact this candidate

Resume:

PROFESSIONAL BACKGROUND

Mr. Osvath has over ** years of experience in the field of electrical engineering. He has supported projects Electricallyincluding Controls, Mechanically as well as a facility in body, paint, and trim shops. He also has experience in multiple types of material handling systems as a Controls Engineer with project management responsibilities. Mr. Osvath has worked with plant and corporate engineers as well as engineers and project managers of tool vendors.

He holds project engineering experience, including bid pack development, project scheduling, pre-installation coordination, meeting and correspondences, debug, 20 hour runs, standby, and buy off, with experience working in all phases of the projects with all groups.

Groups include corporate engineers, cooperate safety, plant engineering, plant maintenance supervision, plant's skilled trades, contractor project management, skilled contractor trades, tool vendors, conveyor vendors, and general installation contractors.

He can work with teams and coordinate project activities.

Ford Motor Company - Dearborn, Michigan

Vehicle Operations Manufacturing Engineering (VOME) (Contract)

Conveyor Engineer – Final Assembly

11/2019 – 5/2020

My work at Ford Motor Company includes Conveyor project management for multiple projects in multiple locations through North American. Working closely with conveyor contractor, Controls Contractors, Plant Management, I add in the smooth installation of conveyor systems. To complete this, I must also work with suppliers and logistics companies to facilitate a successful flow of assembled components into the plant.

Fives Cinetic Inc.- Novi, Michigan

Commissioning Engineer (Contract)

8/2018 – 11/2019

I received two months of specialized training in Le Bignon, France. The training was for the support of Automated fluid fill equipment. In shop verify, test, correct issues, and redline drawings to reflect as-built conditions of automated fluid fill machines used in automotive assembly lines. Follow the equipment to installation sites to verify the final installation and proper operation.

Intouch Automation LLC- Wixom, Michigan

Program Manager (Contract)

1/2018 – 6/2018

Developed Access Database used to track project status and financials, including purchase orders, invoices, payments, and projected invoices used to forecast cash flow and timing for the coming months. Responsible for ordering the fabricated materials for projects through multiple vendors

Design Systems Inc.- Farmington Hills, Michigan

Project Engineer (Direct) Senior Project Engineer (Direct)

4/2014 – 4/2016 4/2016-12/2017

Federal Express Ground

Provided on-site punch list support. Generated detailed reports of Electrical and mechanical deficiency in conveyor and facility installations.

Assisted FedEx ground Engineering teams with start-up support provide detailed reports on the first use of new conveyor systems.

I reviewed electrical drawings, PLC logic, and HMI screens to verify that they adhered to the standards and specifications of FedEx Ground. Provided a report of all issues that do not meet the required specifications.

I have developed a Microsoft Access database used to track project tasks and person-hours. This tool was used by the entire team to provide the customer with the best service possible.

I developed and implemented a Quick-Base project tracker. This tool replaced the original database and provided the same functions as the database but add the many additional features to the team, including access through the internet and smartphones.

General Motors – Detroit / Hamtramck, Michigan

Worked with the installation contractor, General Motors, and tooling vendors to track and resolve issues with the installation of new tools for the assembly line.

Provide additional services including the tracking of changes to conveyor end of travels, Power bus connections, and Red tag Process.

Provide Installation support during the construction phase of the project.

General Motors – Wentzville, Mo

Worked with the DSI Process team to develop a plan to install a new Heavy Repair Booth. This project would include Conveyor rework, Power, and lighting requirements, Ventilation, and rework of an existing area.

General Motors – Toluca Mexico

Reviewed an existing Scope of work to identify possible Issues and deficiencies. Generated a report of items of concern for possible changes to the scope of work

Auto Park It

Developed System design for a System that controlled an automated parking structure that has a system controlled by three control panels multiple junction boxes as well as field devices related to these panels. The system included Shuttles, lifts, Laser measurement devices, Motorized conveyors, and wireless access points. The system would have the capability too automatically store 200 vehicles.

CKGP/PW and Associates Inc.- Troy, Michigan

Project Engineer (Direct)

8/2013 – 4/2014

GM Fort Wayne- Paint hospital Project

Project to rework a portion of the building to a paint repair area, including new walls that would provide an environmentally safe area to repair the final line truck before shipment. This project involved the demolition of existing structures, the relocation of electrical panels, and the installation of new electrical panels and ventilation systems.

GM Flint- MIS relocation Project

This project involved the relocation of and programming of an HMI panel that verified style information before entering the Primer booth in addition to the HMI modification updated a "Bingo Board."

GM Flint- Paint Booth Robot rework Project

Rework of multiple robot Cabling, Paint lines, and cat track.

CKGP/PW -Office Network and building rework

Rework and optimization of the CKGP office network, including labeling and documentation. Provided maintenance and support to make office repairs.

System Logistics - Grand Rapids, Michigan

Controls Engineer (Contract)

5/2013 – 7/2013

Swire Coke-Cola Project, Draper, Utah

I provided service to commission 16 Mini load ASRS units supporting Hardware, Software, and Power flex Motor Controllers. Worked closely with vendors and accounts payable to procure parts for the project and working with Allen Bradley to resolve warranty issues.

I added in the debugged of installation issues to bring the equipment to an operational state. Replaced multiple variable frequency drives due to damage was done during installation and other warranty issues. Ran all ASRS units for 20 hours each to provide break-in before final configuration.

Comtech, International, -Troy, Michigan

Project Engineer (Contract)

1/2013 – 3/2013

GM Powertrain, Spring Hill Tennessee

Configured Autosave Software for plant floor devices to do scheduled Uploads and compares. This included PLC's, HMI's, and P.C.s. This software would record the processer and verify if any changes were made. As modifications are identified, Autosave placed an updated copy on the server. Backup Copies on the server could be used for disaster recovery.

Inalfa Roof Systems- Warren Michigan

Manufacturing Engineer (Contract)

5/2012 – 12/2012

Inalfa Roof Systems provides stamping and assembly of sunroof modules for GM, Ford, Chrysler, Nissan, and BMW.

I Provided support for ultrasonic vibration welding, self-piercing riveting systems, and clinchers.

Performed maintenance and operations support on Bosch conveyor used for the assembly line.

I Provided Operators with proper work instructions, based on FMEA, control plans.

I Performed calibrations and repairs of sunroof audit machines that checked for voltage, current timing, and vibration analysis. I worked on ABB Robots and end effectors, making repairs, and performing preventive maintenance to eliminate downtime. Responsible for assuring that production has all the tools to perform their work.

Rebuilt four vacuum tables using new components saving thousands of dollars over new tables

Process Development Corporation- Caton Michigan

PLC- Manufacturing Engineer (Contract)

3/2009 – 12/2009

Dong Kwang S.A. DE C.V., Ramos Mexico

As a team member of team engineers, I provided pre-launch support of the GM 166 Program at D.K. Mexico, Dong Kwang S.A. DE C.V.

DK is a Supplier of injection molded parts and assemblies, including instrument panels, door panels, and floor consoles to General Motors.

I Designed, documented, and fabricated thermal verification equipment added to the headliner tool.

Made multiple control changes to console conveyor line that improved on the throughput of the system.

I Designed, fabricated, and installed assembly verification test equipment.

I Worked with an Industrial engineer to provide error proofing of console assembly operations.

I Provided support to vacuum form tools, injection molding, vibration welders, ovens, and material press tools.

Control Systems Integrators- Lansing, Michigan

Project / Controls Engineer (Contract)

3/2008 – 9/2008

Amylin Pharmaceuticals Project-West Chester, Ohio.

Contractor to Diamond Phoenix Corporation, Grand Rapids, MI.

Provided controls support of final buy-off- testing of AGV's, ASRS's, conveyors, and pallet exchangers.

Identified, labeled, and recorded all conveyor emergency stop devices. I Modified AutoCAD drawings to reflect as-built conditions. I Investigated and rectified controls operational issues and Identified and resolved installation issues.

Design Systems Inc.- Farmington Hills, Michigan

Project Engineer (Direct)

2/2000-12/2007

General Motors- Shreveport, LA

The developed electrical scope of work for two projects, followed by overseeing the installation of the electrical activity for each project.

USPS

Lead a team in the research of the currently used Tag blaster equipment. I Developed a process to gauge the operation of the Tag Blaster as well as designed and testes multiple methods to improve the operation of the machine. The results of the testing then presented in a report made to USPS management.

USPS Detroit P&DC- Process and Distribution Center

I defined contractor requirements for the demolishing of the old belt conveyor. Then the installation of new, including the rerouting of communication and fire alarm systems. Identified the elements of reworking remaining convey to renew and upgrade to today's standards.

Flexible Powertrain Facility: Anniston Army Depot Anniston, AL

I Identified the new tooling power and communication requirements per the RFP for a new facility.

2007 HB/HG Project: DaimlerChrysler Newark Assembly Plant

Provided Support for TCF, BIW, and Paint Shop Conveyor and tool installation verified work to corporate standards.

Involved in all phases of the project, including planning, installation, and debugging of equipment.

Health assessment Project: DaimlerChrysler Toledo Assembly Plant

Worked as part of a team to investigate the existing condition of TCF conveyors. I have created a report of all issues Identified. This report was used to help prevent future problems that could occur for the plant.

2005 N.D. Project: DaimlerChrysler Warren Truck Assembly Plant

Provided Support for TCF Conveyor and tool installation, verified work to corporate standards. Involved in all phases of the project, including planning, installation, and debugging of equipment.

Developed a relationship with Daimler Chrysler support personnel (AAME, AME, and plant), contractors, and tooling vendors and worked as a team to complete the project.

Reviewed electrical drawings to verify standards are met, followed up with the approval process.

Develop scopes of work for contractors to install assembly line tooling and conveyors.

I Coordinated electrical activity for conveyors and general installation contractors.

Tracking of required electrical changes for the project, I developed Access databases to aid monitoring.

2004 H.B. Project DaimlerChrysler Newark Assembly Plant

Provided Support for TCF and BIW Conveyor and tool installation, verified work to corporate standards.

Involved in all phases of the project, including planning, installation, and debugging of equipment.

2003 C.S. Project: DaimlerChrysler Windsor Assembly Plant

I Performed FIS verification on tools before shipping to the Windsor Assembly Plant.

Installed temporary workstations verified all fault messages, on final tool installation verified FIS installation on plant FIS workstation.

2002 D.R. Project: DaimlerChrysler Warren Truck Assembly Plant

Provided Supported for TCF Conveyor and tool installation validated work to corporate standards. Tracked and recorded changes to Data Highway communications cables.

I Coordinated electrical activity for conveyors and general installation contractors.

CTC Power study: DaimlerChrysler Tech Center

I Assisted in measuring power busloads and collecting load data on individual devices on each power bus.

Electronic Data Systems- Multiple Locations

Business Relations Analysis (Direct)

3/1990-11/1999

G.M. Power Train /Delphi Spring, Livonia Michigan

Responsible for over 100 Personal computers and infrastructure to support internal and external communications.

I facilitated the expansion of the network to a new area.

I developed and maintained an Access database of inventory of hardware, infrastructure ports, and records of activities for all hardware tasks.

Was a member of the COE Team (Consistent Office Environment)?

I was involved in installing and implementing a Novell network for the Powertrain facility. This site had over 300 Personal Computers and multiple servers. Concurrently responsible for the system of P.C.s at the Delphi Plant also in Livonia, MI, this site had over 100 Personal Computers.

General Motors- Buick City, Flint Michigan

As a Buick City Plant floor team member, I provided support and implemented changes for multiple Plant Floor systems, including Auto VIN Identification (AVI) - Allen Bradley RF tags, Graphic Pull System (GPS), Assembly Line Diagnostic Link (ALDL) and schedule systems.

I Supported the plant during the 2nd shift for the last year, in providing 2nd shift coverage required to handle Operations support in addition to plant floor systems.

I Coordinated skilled labor activities with Buick City's maintenance supervision through collecting requirements of other team members and passing this information along with other elements in weekly planning meetings.

Made many improvements to development equipment to aid in the Plant floor PLC simulators, including 2 Programmable Logic Controllers (PLC) along with other hardware, software, and communications cable. This simulator provided a valuable tool for the Plant Floor team to research changes to current logic and develop new code for new systems.

Material Management Group- Auburn Hills, Michigan

The Materials Management group is responsible for supplying Field Services with the necessary parts for the repair of computers.

My responsibilities as a team member included the testing and repair of PS/2, X.T., AT, AST, Apple, and EDS system components.

Other duties include the installation of software, managing databases, and inventory control.

Field Service Group- Troy, Michigan

The Field Services group was responsible for the hardware and software maintenance of Personal Computers.

This position required extensive interaction with multiple levels of customers.

I also completed several temporary duty assignments in Lansing and Spring Hill, TN.

EDUCATION

Oakland Community College, Farmington Hills Michigan 9/1992 – 1/1995

Michigan Firefighters Training Council

Fire Science, Firefighter I & II, Fire Officer 1, II, and III.

Wayne County Community College Michigan Taylor 9/1982 – 4/1985

Associate Degree in Computer Science and Data Processing

National Institute of Technology 9/1980 – 6/1982

Electronic Engineering Technology ( 2-year technical school certificate)

OTHER

Eagle Scout – Boy Scouts of America.

Active Scout Leader – Boy Scouts of America, Currently District Advancement Chairman

I am an active member of the VFW Auxiliary, VFW Post 2269, Wixom, Michigan.

Volunteer Firefighter 15 Years - City of Wixom, Retired.



Contact this candidate