ALFREDO C. REGALADO

EMAIL: adeh99@r.postjobfree.com

CONTACT No.: 059******* or 055*******

ADDRESS: Das-Acro, Lutopan, Toledo City, Cebu, Philippines

DRIVER LICENSE: 241-***-**** K.S.A. Valid until 11/03/2022

ARAMCO Approval: QC Plumbing Inspector with SAP No. 80002930

QC Mechanical Inspector

SAP NO.: 80002930

PASSPORT NO.: EC7434435 valid until 18 April 2021

POSITION DESIRED: Mechanical QC Inspector

OBJECTIVE

To join an organization where I can apply my knowledge and work experience at the maximum, which I have gained from my reputable companies EPCM (Engineering, Procurement and Construction Management) and to contribute to the growth and fulfillment of the company.

CAREER SUMMARY

With a total of 11 years in Aramco various projects like: Oil and Gas project, Olefins Plant, Gas and Oil Separation Plant, Gas Plant, Housing Project and Final Site Development. Experience as QA/QC Mechanical Inspector, QC Plumbing inspector, QC Piping inspector, Superintendent Piping, Piping Engineer & Supervisor piping. Have experience in Plumbing, Fire Protection, RTR, Piping. Familiar both on QA/QC documentation, RFI initiation & inspection, Installation work, Testing, Pre-commissioning until Commissioning work.

Have knowledge on materials submittal, Quality document review, Test pack package preparation, NDT work, line checking, issue punch list, Hydro testing, Pneumatic Testing, Gravity test, Flow Test and Service Test, Drinking water disinfection, lay-up activity work, air blowing, steam blowing, water flushing, Re-instatement work, bolt torqueing work, leak test work until commissioning work.

Computer literacy (word, excel, power point), Navis work, AUTOCAD, Adobe acrobat.

Preparation and Implementation of Project Quality Plan and ensure coverage are in compliance with Saudi Aramco Contract Schedule Q, SAMSS, SAES, SAEP and other relevant standard and best practices.

SUMMARY OF QUALIFICATION, TRAINING & CERTIFICATES

Aramco Approved QC Mechanical Inspector assigned in Final Site Development – Dammam ll Al Hussam, Dammam 34223.

Aramco Approved QC Plumbing Inspector with SAP no. 80002930 assigned in EDRC Package -6, Dhahran.

SCE (SAUDI COUNCIL OF ENGINEERS), MEMBERSHIP NO.: 300718, Mechanical Engineering.

CERTIFICATION, AUTHENTICATION AND VERIFICATION that ALFREDO C. REGALADO a graduate of Cebu Institute of Technology with course of Bachelor of Science in Mechanical Engineering, graduated on 23rd March, 1996.

Certificate of Recognition for completion for the first batch of Residential Houses under PACKAGE 6 with zero Time Lost Incident (BI-1—01382), Community & Public Projects Department-DHAHRAN COMMUNITY EXPANSION PROJECTS DIVISION INCREMENT II.

Daelim Supervisor of the week-Safe work given 20th November 2015 at SADARA site Construction, Jubail, Kingdom of Saudi Arabia.

Complete 70 training hours for AUTOCAD for Professional – Level 1 & 2 held on July 9-19, 2013 at CRESCENT TECHNOLOGIES Manila, Philippines.

Complete 30 training hours for COMPUTER – AIDED DESIGN OF HVAC (Heating, ventilating and air-conditioning system) at CRESCENT TECHNOLOGIES Manila, Philippines.

MS OFFICE (WORD, EXCEL, POWER POINT) taken at OWWA-MANILA from May 27-31, 2013.

DIGITAL MEDIA ARTS (ADOBE PHOTOSHOP) taken at OWWA-MANILA from June 3-6, 2013.

RasGas Letter of Appreciation February 2009.The RasGas Expansion 2 Onshore Project who successfully completed this project.

Complete in-house seminar/workshop on AWARENESS INWELDING TECHNOLOGY in Saudi Arabia on March 14, 2007.

Seminar/workshop on BASIC WELDING INSPECTION AND QUALITY CONTROL including field trip conducted by Mr. Nel Carado from June23, 1997 to July 5, 1997.Total of 40 hours training time at GEC conference room San Fernando, Cebu, Philippines.

RECORD OF EXCELLENCE – Petro Rabigh -JGC-CCC, RABIGH OLEFIN PLANTS PROJECT for the joint effort and remarkable milestone of 20,000,000-man hours without LTI given 11th Nov. 2006.

Attended SUPERVISOR’S HSE RESPONSIBILITY conducted at JGC-CCC Fabrication shop, Rabigh, Kingdom of Saudi Arabia on 21 June, 2007.

Attended HAZARD RECOGNITION/IDENTIFICATION TRAINING conducted at JGC-CCC fabrication shop, Rabigh, Kingdom of Saudi Arabia on 08 August 2007.

Completed the 2 – hours SUPERVISOR’SHSE RESPONSIBILITY conducted at JGC-CCC fabrication shop, Rabigh, Kingdom of Saudi Arabia on 19 August 2007.

Certificate of Recognition for the completion of fifty percent Construction progress, and the remarkable achievement of 12 million-man hours without LTI given July 2007 at Olefin Plant project.

Complete the 2-hours course in FIRST AID AND CPR AWARENESS on July 9, 2007 at the JGC-CCC room, Rabigh, K.S.A.

Completed the SCAFFOLD TRAINING SEMINAR conducted at JGC TRAINING ROOM, Petro Rabigh, Olefin Plant Project on July 3, 2007 at JGC-HSE TRAINING room, Rabigh, K.S.A.

Complete the In-house/workshop on AWARENESS IN WELDING TECHNOLOGY presented by Georgios Asimakopoulos in Saudi Arabia on March 14, 2007.

Certificate of Achievement at PETRONAS MNLG TIGA PROJECT in working 20,000,000-man hours without LTI. Achieved in Bintulu, Sarawak, Malaysia on 28 January 2002.

EMPLOYMENT SUMMARY

FROM TO POSITION COMPANY COUNTRY

MAR. 26, 2019 - MAY 30, 2020 QC MECHANICAL INSPECTOR AL-SHALAWI SAUDI

JUL. 23, 2016 - MAR. 21, 2019 QC PLUMBING INSPECTOR AZMEEL SAUDI

AUG.7, 2013 - JAN. 6,2016 SUPERVISOR PIPING DAELIM SAUDI

DEC. 9, 2010 - MAY 4, 2013 SUPERVISOR PIPING ROTARY SAUDI

SEPT.15, 2009 - SEPT.16, 2010 ENGINEER PIPING SUNGCHANG SAUDI

APR.25, 2008 - JUNE 1, 2009 SUPERINTENDENT PIPING DODSAL QATAR

JAN.20, 2007 - JAN. 17, 2008 ENGINEER PIPING CCC SAUDI

OCT.4, 2003 - JUL.1, 2006 QA/QC PIPING INSPECTOR CCC OMAN

JAN.4, 2001 - NOV.20, 2002 QA/QC PIPING INSPECTOR DOTANAH MALAYSIA

NOV.11, 1998 - NOV.17, 2000 FOREMAN PIPING DAELIM TAIWAN

PERSONAL BACKGROUND

Nationality: Filipino

Sex: Male

Height: 5’6”

Weight: 85 kg.

Date of birth: April 10, 1974

Place of birth: Lutopan, Toledo, Cebu, Philippines

EDUCATION

SCHOOL: CEBU INSTITUTE OF TECHNOLOGY

DEGREE: BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING

DATE: JUNE 6, 1991 - MARCH 23, 1996

EMPLOYMENT HISTORY

COMPANY: AL SHALAWI INT’L CO. TRADING & CONTRACTING

COUNTRY: P.O. BOX 2853 AL KHOBAR 31952, K.S.A.

POSITION: QC MECHANICAL INSPECTOR

PERIOD: MARCH 26, 2019 - PRESENT (1 YR. + 2 mos.)

PROJECT NAME: FINAL SITE DEVELOPMENT – DAMMAM ll, AL HUSSAM 34223

JOB DESCRIPTION:

Review Scope of work, Contract Specifications, Municipality Standards, MEWA Standards (Ministry of Environment, Water & Agriculture), IFC drawing, Shop drawing and method statement to ensure full compliance of the mechanical works.

Handle all Mechanical scope; underground water line use HDPE pipe; sewer line use UPVC pipe class 5, Storm line use GRP pipe; Irrigation line, PVC & CPVC pipe for plumbing work; GLS Tanks (Glass – lined bolted tanks) for Irrigation line; Carbon steel pipe epoxy coated – Irrigation line connected tanks; HVAC work and plumbing sanitary fixtures.

Work include submittal of material approval.

Monitors various work activities in site.

Do material receiving inspection.

Prepare RFI and site inspection together with PMC (Project Management Consultant) and SAPMT.

Prepare test package for Hydro test.

Prepare RFI and inspection on hydro testing work.

Prepare INCR, push construction team to close it.

Attend Aramco weekly meeting on Progress, Quality, Safety, Procurement and Planning meeting.

Prepare punch list and send to construction team for punched clearing.

Complete the testing and commissioning tasks at project as per Contract Specification.

Attend punch list issue by MEWA and until closing.

Responsible for the Inspections and Final Documentations prior to handling over of the client.

Prepare NMR packages until hand over to client.

Responsible for the making of the final turn over packages.

COMPANY: AZMEEL CONTRACTING COMPANY

COUNTRY: P.O. BOX 11662, AL Jubail, 31961, K.S.A.

POSITION: QC PLUMBING INSPECTOR with SAP no. 80002930

PERIOD: JULY 23, 2016 - MAR. 21,2019 (2 YRS. + 8 mos.)

PROJECT NAME: EXPAND DHARAN RESIDENTIAL COMMUNITY PACKAGE - 6

JOB DESCRIPTION:

Review approved construction drawings, specifications and method statement to ensure full compliance of the mechanical works are implemented and carried at site.

Knowledge on ARAMCO STANDARDS like: SAES, SCHEDULE Q, PROJECT SPECIFICATION, PQP, SATIP-SAIC-SATR, SAIP, SAMSS, SAEP, PQP (Project Quality Plan) and other international codes and standards.

Knowledge on UPC (Uniform Plumbing code), NFPA 13,13D,14,10,24 (National Fire Protection association), SAES-S-010, SAES-S-020, SAES-S-030, SAES-S-040, SAES-S-050, SAES-S-060, SAES-S-070, SAES-B-017.

Monitors various work activities in site about Plumbing, Firefighting & RTR and material receiving inspection.

Familiar on Plumbing, Firefighting & RTR materials use like: CPVC, PVC, UPVC, galvanized pipe and etc.

Familiar on Material receiving inspection attachment like: P.O., delivery note, RTA (Request for Technical Approval), Certificate of test report, certificate of inspection & MTC (material test certificate), NMR & product catalog.

Make inspection on plumbing materials use, check material traceability.

Verify its compliance to the company policies and procedures.

Interact with the project team in Quality requirements

Targeting the approval and acceptance for all inspection and testing required from consultant or third party.

Knowledge on Test package Flow and attachment, like: SAIC-L-2017, SATR-A-2008, SAIC-A-2009, SAIC-A-2011, SAIC-A-2013, SAIC-A-2015 & SATR-A-2001.

Review of the hydro-test packages and witnessing the hydro-test.

Familiar on raising RFI in QMIS (Quality Management Information System), replying LBE (log book entry) in the system, LBE category: STANDARDS VIOLATION, NO-VIOLATION-PROACTIVE NOTIFICATION, NO-VIOLATION-GENERAL COMMENTS.

Conduct work site inspection (RFI) and ensure quality of work meets contract standards.

Preparing non - conformance reports (NCR) and verification of corrective actions.

Complete the testing and commissioning tasks at project(s) as per project progress.

Monitor & Control all documentation and inspection on site: submission of RFI, MIR, NCR, and Site Memos.

Prepare progress updates for daily & weekly reports for installations and testing of Plumbing and Fire Fighting services.

Knowledge for punch list preparation, monitor Contractor and punched clearing.

Responsible for the Inspections and Final Documentations prior to handling over of the client.

Attend Weekly meeting with all QC colleague and QC manager.

Handle all activities in Plumbing from installation of Inside villa drainage (DWV, RW-DW water line, plumbing fixtures, firefighting line& sprinklers, Infra sewer line, infra raw and fire water line, irrigation line.

Handle all testing: hydro testing of RW-DW line, Gravity test of drainage line, hydro test of firefighting and irrigation line.

Responsible for the making of the final turn over packages.

COMPANY: DAELIM SAUDI ARABIA CO. LTD.

COUNTRY: P.O. BOX 10162 Jubail Industrial City - 31961, K.S.A.

POSITION: PIPING SUPERVISOR

PERIOD: AUGUST 7, 2013 - JANUARY 6, 2016 (2 YRS. & 5 MOS.)

PROJECT NAME: SADARA ISOCYANATES PROJECT (DOW- ARAMCO)

JOB DESCRIPTION:

Review all approved method statement, procedures, standards, reference codes & quality related documents as required in the project.

Handle UG underground piping in SADARA project scope. Material use RTR for fire water line, RTR for drainage line and PVC pipe for potable water line.

Well familiar on work activity from excavation, sand bedding, pipe laying, and joint fit-up by adhesive or joint lamination, and solvent cement for PVC.

Handle hydro testing work & gravity test.

Installation of PIV, Fire monitor (water/foam), hydrant, and fire hose reel, fire cabinet, deluge valve assembly, standpipe with hose cabinet, water spray nozzle.

Handle reinstatement work, water flushing and commissioning work.

Handle Above ground piping, pipe support installation, valves, control valves.

Punch clearing prior hydro testing or pneumatic testing.

Monitor NDT prior test.

Closing all “A” punch issue by QC team prior testing.

Handle hydro testing & pneumatic testing

Prepare work plan and scheduling. Prepare 2 week look ahead submitted to construction manager. These work plans also email to sub-contractor because this to be follow.

Site surveillance, monitoring of activities on daily, weekly and monthly schedule.

Conduct twice weekly meeting with sub-contractor. Discuss about the schedule plan, manpower, equipment, and any related problem with regards to the activity.

Check Isometric drawings forwarded to fabrication teams and subcontractor and correct the discrepancy prior to fabrication to minimize additional cost in change orders and resolve problems found to speed up fabrication.

Review work method of statement (Fabrication, site installation and Hydro testing) of sub-contractor which already approved by the client DOW/SADARA.

Check field piping installation for correctness and resolve site problems encountered to speed up installation.

Monitor the quality variation activities and site notice report and coordinating with contractors, consultants and client to sign off all the variation.

Implementation of safe working practices in fabrication shop and site.

Raise Technical Query (TQ) if encounter work discrepancy.

COMPANY: ROTARY ARABIA CO. LTD.

COUNTRY: P.O. BOX 10162 Jubail Industrial City - 31961, K.S.A.

POSITION: PIPING SUPERVISOR

PERIOD: DEC. 9, 2010 - MAY 4, 2013 (2 YRS. & 5 MOS.)

PROJECT NAME: SATORP (SAUDI ARAMCO TOTAL REFINERY PROJECT

JOB DESCRIPTION:

Handle UG piping in SATORP project scope. Material use RTR for fire water line and PVC pipe for potable water line. Work familiar from excavation, sand bedding, pipe laying, and joint fit-up by adhesive or lamination, solvent cement for PVC and curing. Then proceed to hydro testing work, water flushing and reinstatement work. Installation of PIV, Fire monitor (water/foam), hydrant, and fire hose reel, fire cabinet, deluge valve assembly, standpipe with hose cabinet, water spray nozzle. Reinstatement work, water flushing and commissioning work.

COMPANY: SUNGCHANG & AL-SHAIKH CONTRACTING.CO.LTD.

COUNTRY: P.O.BOX 20706, AL-KHOBAR 31952, K.S.A.

POSITION: PIPING ENGINEER

PERIOD: SEPT.15, 2009 - SEPT. 16, 2010 (1 YR.)

PROJECT NAME: MANIFA GAS PLANT PROJECT

JOB DESCRIPTION:

Direct contact to the construction manager and conduct discussions regarding the scope of works, specifications and limitations in actual work at site.

Review and apply the work approved by the owner and supervise correctly as per the specifications and standard.

Response the order from the construction manager regarding any modifications and changes orders approved by the owner and discuss to the higher authorities for cost adjustment and approval.

Solve site problems encountered and engineering issues.

Response the order from the construction manager regarding any modifications and changes order approved by the client and discuss to the higher authorities for cost adjustment and approval.

Control and strict implementation of plans and specifications in the actual works.

Attend daily progress meeting with the Project Manager and Construction Manager. Discuss regarding the development of the project as well as the status if they meet the proper scheduling and safety standards.

Meeting the people in authorities regarding the scoop of works, materials, specifications, duration of project.

Coordinates with client representative, inspector, area manager and materials department.

Responsible also for any back job and change order in the site and discuss to the construction manager for any cost adjustment

COMPANY: DODSAL ENG’G AND CONSTRUCTION PTE.LTD.

COUNTRY: P.O.BOX NO. 60813, DOHA, STATE OF QATAR

POSITION: PIPING SUPERINTENDENT

PERIOD: APRIL 25, 2008 - JUNE 1, 2009 (1 YR. & 2 MOS.)

PROJECT NAME: RASGAS ONSHORE EXP. PROJ, - II & AKG2 (TRAIN 6&7)

JOB DESCRIPTION:

Prepare work planning and scheduling.

Solve site problem and engineering issue encountered to speed up the work.

Raise TQ (technical query) if encounter work discrepancy.

Review and apply the work approved by the client and supervise correctly as per the specifications and standard.

Responsible for scheduling of works and distribution of manpower in the particular activity and estimate the materials and equipment needed.

Response the order from the construction manager regarding any modifications and changes order approved by the client and discuss to the higher authorities for cost adjustment and approval.

Control and strict implementation of plans and specifications in the actual works.

Attend daily progress meeting with the Project Manager and Construction Manager. Discuss regarding the development of the project as well as the status if they meet the proper scheduling and safety standards.

Meeting the people in authorities regarding the scoop of works, materials, specifications, duration of project.

Coordinates with client representative, inspector, area manager and materials department.

Responsible also for any back job and change order in the site and discuss to the construction manager for any cost adjustment.

COMPANY: CONSOLIDATED CONTRACTOR COMPANY

COUNTRY: P.O.BOX 31750 – AL KHOBAR 31952, K.S.A

POSITION: PIPING ENGINEER

PERIOD: JAN. 20, 2007 – JAN. 17, 2008 (1 YR.)

PROJECT NAME: RABIGH OLEFIN PLANT PROJECT

JOB DESCRIPTION:

Reviews of all drawing plans, technical specifications, piping arrangement, isometric, work procedure and method statement.

Prepare manpower and equipment recourse.

Coordination and securing of proper permitting and other necessary documents especially during the start of construction works.

Ensures compliance of the requirements of the drawings and specification. Observe in detail all the works in progress.

Checks the materials and workmanship. Report and coordinate with the client and designer on any deviation or seemed contrary to the plans and specifications as it indicates against any accepted engineering standards. Interest of the client in terms of quality, economy and time would be foremost.

Prepare purchase requisition slip of needed materials and materials delivery on site.

Coordinate with the supplier regarding requirements of the projects and verifies order as per specification.

Prepare pipe cutting list, materials take-off and progress accomplishment reports.

Implements the safety construction program for conformance with regulatory laws and project guidelines.

COMPANY: CONSOLIDATED CONTRACTOR COMPANY

COUNTRY: P.O.BOX: 614 MUSCAT, POSTAL CODE: 113, SULTANATE OF OMAN

POSITION: QA/QC PIPING INSPECTOR

PERIOD: OCT.04, 2003 - JULY 01, 2006 (2 YRS. & 8 MOS.)

PROJECT NAME: SOHAR REFINERY PROJECT

JOB DESCRIPTION:

Perform inspection above ground and underground piping activity.

Responsible for the quality control inspection in accordance to the approve PQP (Project Quality Plan).

COMPANY: DOTANAH ENG’G AND CONTRACTING SDN.BHD.

COUNTRY: P.O. BOX 2734, 97012 BINTULU, SARAWAK, MALAYSIA

POSITION: QA/QC PIPING INSPECTOR

PERIOD: JAN.04, 2001 – NOV. 20, 2002 (1 YR. & 11MOS.)

PROJECT NAME: MNLG TIGA PLANT PROJECT

JOB DESCRIPTION:

Prepare RFI. Perform inspection above ground and underground piping activity.

Perform inspection of pipelines as well as monitoring the work flow in accordance with JGC & KBR specification procedure and standard.

Responsible for the quality control inspection in accordance to the approve PQP (Project Quality Plan).

Conduct inspection activities in the project through the implementation of project quality plan, ITP & method statement.

Perform checking drawing as per IFC drawing and applicable standards.

Inspection of material deliveries in lay down as per MIR (material inspection request).

Responsible in checking mechanical piping installation such as checking of pipe spools, pipe support, spring support, hanger, guide, pipe shoes, gaskets fixing, and bolt tightening, installation of valves, checking of flow direction of every valve.

Conduct 100 % visual inspection of spools fit-up, verification on orientation, correct marked up and identification.

Verify construction drawing base on the latest revision.

Conduct line checking on all piping ready for hydro test.

Review as built drawing and coordinate to the client for all hold point inspection required RFI.

Witnessing of activities like UT, PT, RT, & MPI. Witnessing PWHT and hardness test.

Visual inspection and dimensional inspection prior installation of spools.

Conduct witness inspection on pipe internal cleaning by air cleaning.

Reviewing test package attachment for Aramco submission for PID approval.

Witnessing hydro static testing of pipeline system or valves testing.

Responsible making sure the instrument equipment uses for testing such as manifold, pressure gauge, relief valve is calibrated with tag sticker/label with valid date of expiration.

Check that all instrumentation is disconnected or have been remove as mention in the test package to avoid damage.

Check the test limit as mention in the test package.

Checking or reviewing test package isometric as against P & ID drawing.

Checking fitting materials specification against line specification.

Check that branch reinforcement is in accordance with specification.

Check or confirm pipe support are installed and complete as specification.

Check that correct gaskets, bolts are fitted in the mechanical flange.

Confirm vent and drain are correct installed.

Checking the proper orientation of spectacle blind or spade and blind.

Witnessing of bolt torquing, but checking as well the calibration certificate of torque wrench must valid in date.

Reviewing test package and closure of punch items prior testing.

Monitoring daily RTR piping assembly and installation works and verifying compliance to client specification.

Check the lamination thickness and length as per required recipe from manufacturer.

Checking and verifying the curing time must be correct as per manufacturer.

Initiate RFI for hardness inspection by doing barcol hardness test on the laminated joint.

COMPANY: DAELIM INDUSTRIAL CO.LTD.

COUNTRY: TAIWAN

POSITION: FOREMAN PIPING (ERECTION)

PERIOD: NOV.11, 1998 – NOV. 17, 2000 (2 YRS.)

PROJECT NAME: FORMOSA REFINERY PROJECT

JOB DESCRIPTION:

Gather the isometric drawing, general piping arrangement drawing and plot plan of the area assign.

Collect all the needed tools like pipe clamp, angle grinder, wrap around, square, level and etc.

Handle work from fabrication of spools, erection of spools, pipe support, valve, and etc. all mechanical parts.

Handle hydro testing work until pre-commissioning work.

CHARACTER REFERENCES:

1.Shafeeq Abdul Kareem Al Thowaimer E-mail: adeh99@r.postjobfree.com

QA Manager Mobile: 059*******

2.Engr. Elmer Narciso Dulay E-mail: adeh99@r.postjobfree.com

QC Manager Mobile: 057*******

3.Engr. Philiph A. George E-mail: adeh99@r.postjobfree.com

PID EDRC Package -6 Mobile: 055*******

4.Engr. Hussam Husseini Email: adeh99@r.postjobfree.com

PMT EDRC Package-6 Mobile: 050*******

5.Engr. Alex Ibale Mobile: 050*******

Al Shalawi QA Manager

I HEREBY CERTIFY THAT THE ABOVE INFORMATION ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEFS.

Alfredo Regalado

Applicant

Mobile: +966-*********) • E-mail Add: adeh99@r.postjobfree.com



Contact this candidate