Post Job Free

Resume

Sign in

Solar Power Plant - Project Manager

Location:
Patna, Bihar, India
Posted:
July 11, 2020

Contact this candidate

Resume:

PROFESSIONAL COMPETENCE

S.SARAVANAN

**/**, ******* **** ******,

L.R.PALAYAM,

PANRUTI-607 106, MOBILE NO: 095********

CUDDALORE DIST EMAIL ID : adeh7u@r.postjobfree.com EXPERIENCE:

13+ Year of Experience in Electrical field.

ACADEMIC CHRONICLE

QUALIFICATION

YEAR

INSTITUTION

PERCENTAGE

B.E (EEE)

2007

Krishnaswamy college of

Engg and Tech

Cuddalore Dist.

(Anna Universtiy)

66%

Diploma (EEE)

2004

Annai Velankkani

Polytechnic college,

Anguchettypalayam.

87%

OBJECTIVE:

To obtain a career opening in the field of Electrical in an organization that will enable me to contribute, learn and grow up the organization. PRESENT WORKING EXPERINCE:

HEAD QUARTER - M/s. L&T ECC DIVISION, PT&D - RENEWABLE ENERGY MOUNT POONAMALLEE ROAD,

MANAPAKKAM CHENNAI - 600089.

DESIGNATION - Construction Manager (M1B) - Project Manager

(Electrical)

WORKING PERIOD - 10 OCT 2011 to TILL DATE.

Key Responsibility:

a) Management activities:

Men management in all respect. And report monitoring.

To read & understand the contract requirement, Managing contracts and project, achieving client satisfaction in terms of delivery and technical requirements

To monitor the overall progress of projects & project cost against schedule and milestones reporting to management, as well as providing early warning of potential slippage

Finalizing, arranging and getting Design, Drawings, Vendors and other approvals from client

Client JMC, Handover to customer, Client invoicing and reconciliation of client billing and materials.

RFI declaration and target Achievement.

Liquidation of punch points.

Verifying vendors & contractors Bills.

Quality test and AT of newly commissioning utilities.

Continual improvement in quality management system.

Preparing project snag list.

IPD Budget preparation.

Budget follow up and Budget Tacking.

Co-ordinate for audits with client.

b) Planning :

Preparing planning chart as per client requirement.

Manpower and material planning

Electrical product finalization and updating the Completion status to Client.

Preparing MOM for review meeting (Weekly and Monthly).

Preparation of overall AC Package requirements as per Design. c) Execution:

A.C Side Erection & Installation and Co-ordination in Testing and Commissioning of Electrical.

Monitoring the Electrical works related to LV & HV systems for conformance with provisions of the contract documents and the procedures manuals.

Coordinating and supervising the pre-installation work of selected LV & HV activities and operations.

Project inspection, monitoring, QA/QC implementation in Power Projects.

Reviewing contractor’s LV/HV change order proposals and preparing recommendations.

Liaison with the necessary lead design consultants and sub consultants.

Assist with the inspection of completed works and monitoring the start-up, testing, commissioning and handover of the LV/HV works.

Review and evaluate projects technical submittals from construction contractors for relevant electrical engineering and construction activities

Reviewing, approving and processing all LV/HV technical submittals.

Executing the site electrical work like erection/installation of MCC/PCC/Transformer/HT Panels, Bus ducts, Cable trays, Battery charger, Battery bank, UPS.

Executing Cabling work and ensuring quality.

Effective planning, organizing, estimating, scheduling and monitoring of work activities

Ensuring Quality, Environment and Safety.

Equipment’s in AC side with client, Design modifications discussed with client and reported to Procurement and supply chain management, Statibilty of plant, Operation & Maintenance of all Electrical Equipment like 22KV Vacuum Circuit Breaker, Inverter Duty Transformer, Protection Relay, LT switchgears, Isolators, CT's and PT's etc. Client : South Bihar Power Distribution Co. LTD - DDG System in Bihar. Project Name : Rural Electrification Project through Solar PV Working Period : 12 OCT 2017 to Still Date.

Client : EMAMI POWER.

Project Name : 20MW Emami Solar PV Plant at Roorkee, Uttarkhand. Working Period : 04 DEC 2016 to 12 OCT 2017 .

Client : SUN EDISON SOLAR POWER INDIA PVT LTD.,

Project Name : 60MWp Solar PV Power Plant at Veerukudi, TamilNadu. Working Period : 27 DEC 2015 to 18 NOV 2016.

Client : SUN EDISON SOLAR POWER INDIA PVT LTD.,

Project Name : 12.6MWp Solar PV Power Plant at Thuraiyur, TamilNadu. Working Period : 26 JUNE 2015 to 26 DEC 2015.

Client : SUN EDISON SOLAR POWER INDIA PVT LTD.,

Project Name : 39MWp Solar PV Power Project at BAP, Rajasthan. Working Period : 20 NOV 2014 to 12 JUNE 2015.

Client : ESSEL MINING AND INDUSTRIES LTD.,

Project Name : 11MWp SOLAR PV PLANT AT WARANGAL DISTRIC, AP. Working Period : 28 AUG 2014 to 29 SEP 2014.

Client : RADHA SOAMI SATSANGA BEAS.,(RSSB)

Project Name : 7.5MWp Roof top Solar PV Plant at Beas, Amritsar - Punjab . Working Period : 15 MAR 2014 to 29 MAR 2014.

Client : DJM, LAHOTI, DCPL AND CGFSPL

Project Name : 17MW Composite Solar PV Power Project at Phalodi- Rajasthan. Working Period : 21 FEB 2013 to 10 MAR 2013.

Client : RELIANCE INFRASTRUCTURE PVT LTD.,

Project Name : 40MW Dahanu Solar PV Power Project at Dhursar Village, Pokharan- Rajasthan.

Working Period : 21 JAN 2012 to 31 MAR 2012.

Client : SUN EDISON SOLAR POWER INDIA PVT LTD.,

Project Name : 5MW Solar PV Power Plant Project at BAP, Phalodhi- Rajasthan Working Period : 30 NOV 2011 to 21 JAN 2012.

Client : SUN EDISON GREEN ENERGY INDIA LTD.,

Project Name : 1MW Solar PV Power Project at Sirohi, Rajasthan. Working Period : 27 OCT 2011 to 29 NOV 2011.

PAST WORKING EXPERIENCE:

DISCIPLINE:

Co-ordination in Testing and Commissioning of Electrical Equipment’s in AC side With client,

Co-ordinate with erection activities with client,

Co-ordination of SCADA implementation and commissioning,

Design modifications discussed with client and reported to procurement and supply chain Management.

Statibilty of plant.

Operation & Maintenance of all Electrical Equipment like 33KV Vacuum Circuit Breaker, Inverter Duty Transformer, Protection Relay, LT switchgears, LBS, Isolators, CT's and PT's etc.

SKILLS SET:

TESTING AND COMMISSIONING OF VARIOUS MAKE

Transformer, Generator and Motor Protection Relays, Differential Protection, overcurrent and Earth fault, over and under voltage Relays.

Control & Relay panels up to 220KV, switchgear panels up to 33KV.

Electrical switchgear like VCB, ACB and SF6 Breakers and Isolators.

Power transformers, Distribution transformers, Current transformers, potential transformers, capacitive voltage transformers and Calibration of Voltmeters, Ammeters and Energy Meters.

High Voltage Test for cables, Bus bars and Ducts. WORKED COMPANIES:

M/S.INEL POWER SYSTEM ENGINEERS(P) LTD,CHENNAI,TAMILNADU. Designation: Senior Engineer.

Working Period: 25 AUG 2009 to 28 SEP 2011

Technical skills:

1 Testing of Control and Relay panels ranging from 11 KV to 400 KV. 2 Testing and Programming of SIEMENS Numerical Relays. 3 Testing of SIEMENS & ABB relays using OMICRON UNIVERSE Test kit. 4 Co – ordination with M/S Siemens, Kalwa Works- Mumbai, for Quality Control

(QC) Testing of Control & Relay panels.

5 Co- ordination with Customers and Wittiness Testing of Control & Relay panels. Work Profile:

M/S Siemens, Kalwa Works- Mumbai - Factory testing of 110/132/220/400KV Control & Relay panels (Domestic & QATAR) and Quality Control (QC) Handling of Customers Inspection and Witness Testing of Control & Relay panels. Have tested (with Omicron 256 & 3 phase Automatic current injection kit) and programmed the following Numerical Relays.

Scheme Checks for Control & Relay Panels and HV Test for Control & Relay Panel wiring circuits

WORK INVOLVES:

Siemens Kalwa Works Factory Testing In Mumbai:

Involved as a Team leader in testing of all the panels like 11KV to 400KV control, relay and synchronizing panels at various clients some clients given below 1. Principle involvement in Testing of 132 KV UPPCL, Line Control & Relay Panels including Testing & Programming of SIEMENS Numerical Relays like Distance Relay. 2 .Principle involvement in Testing of 220 KV PGCIL, Feeder Control & Relay Panels including Testing & Programming of SIEMENS Numerical Relays like Distance Relay.. 3. Principle involvement in Testing of 220 KV APGENCO, Control & Relay Panels including Testing & Programming of SIEMENS Numerical Relays. 4. Principle involvement in Testing of 220/110/11 KV KPTCL, Transformer Control

& Relay Panel including Testing & Programming of SIEMENS Numerical Relays and AREVA Relays.

5. Principle involvement in Testing of 220/132 KV Biharshariff (BSEB), line Control

& Relay Panels including Testing & Programming of SIEMENS Numerical Relay, AREVA Relays and EASUN REYROLLE Relays.

6. Principle involvement in Testing of 400KV Adani Power LTD, line Relay Panels including Testing & Programming of SIEMENS Numerical Relays, ABB Relay, AREVA Electromechanical Relays.

7. Principle involvement in Testing of 400/220 KV TATA POWER, Tie Relay Panels including Testing & Programming of SIEMENS Numerical Relays and ABB Relays. 8. Principle involvement in Testing of 400/220 KV TATA POWER, Tie Relay Panels including

Testing & Programming of SIEMENS Numerical Relays and ABB Relay.

M/s. JAITECH PROJECT SERVICES, CHENNAI, TAMILNADU. Designation: Testing Engineer.

Working Period: 9 MAY 2008 to 25 JUN 2009 (1 Years) PROJECT DETAILS:

PROJECT -1

Projects participated:

(110/11 KV) S/S at BORL, BINA, MP.

Description :

Testing of Substation Equipment’s such as 20MVA Generator Transformer 33KV, 110 KV outdoor switchyard equipment’s, SF6 circuit Breaker, Isolators, CT, PT, And Surge Arrestor, 11 KV SIEMENS Make Indoor switchgears 11KV cables, C&R panel Transformer RTCC panel, protection Relays. Measuring Instruments and system scheme Checks.

PROJECT -2

Projects participated: Thermal power plants

1. 2 X 210 MW at Bakleshwar Thermal power

plant, West Bengal.Calcutta.

2. 2 x 25 MW power plant at Adithya cements Ltd, Rajasthan. Description:

Testing of Power Plant Electricals such as Generators, CT, PT, Bus Duct, NGR, GRP Panels, GCP panel, Synchronizing panel, ABB make Generator Protection Relays like REM 543, REM 545, and Restricted Earth fault Relays, synchronous check relay, Two stage Rotor Earth fault Relays etc., PLC Based synchronizing Scheme Checks & Loop checks, Commissioning Assistance for Generator OC and SC test Auxiliary Relays like 80F,96,94,25x,TCS,Master Trip relays.

M/S .ENMAS O&M SERVICES PVT LTD.,

Designation: Electrical Engineer.

Working Period: 5 SEP 2007 to 11 MAR 2008.

Projects participated:

BIOMASS POWER PLANT

Amrit Environmental tech., pvt ltd.,

AETPL, keshwna.

Rajasthan.

ARTICULATION:

ENGLISH, TAMIL(Read, Write, Speak)

HINDI (Speak)

I hereby declare that the details furnished above are authentic t o knowledge.

the best of my

(S.Saravanan)



Contact this candidate