Ray Bennett
Wichita, KS *****
****************@***********.***
Work Experience
MO1C composite structures mechanic
Spirit Aerosystems - Wichita, KS
Sheet Metal/Composite Assembly -
787 Boeing Dreamliner
• Worked in all areas and components of the 787 Dreamliner, including repairs, rework, squawks, and tags.
• Have met all certifications required to work on the 787 Dreamliner. Sheet Metal Assembly - Sr. Structures Mechanic
Lockheed Martin - Marietta, GA
2010 to 2012
C130
• Worked in most areas and components of the C130, including repairs, rework, squawks, and tags
• Worked in Shake - rework, modifications, squawks and quality rejections
• Build up and installation of floor board assembly of the C130
• Have been approved for government security clearance. Planetechs - Everett, WA
2010 to 2010
Sheet Metal/Composite Assembly -
787 Boeing Dreamliner
• Worked in all areas and components of the 787 Dreamliner, including repairs, rework, squawks, and tags.
• Have met all certifications required to work on the 787 Dreamliner. (a list of certifications attached) Drill out and installation of the forward cabin bulk head Cessna Aircraft Company - Wichita, KS
2000 to 2010
Wichita, KS
Sheet Metal Assembly - SOVEREIGN LINE
• Build up and installation of forward cabin seat tracks
• Drill out and installation of nose mate
• Build up of forward cabin as a whole including drill out and installation of: side skins, ski slopes, cabin top, all frames, and sections of actuator housing
• Drill out and installation of the forward cabin bulk head
• Drill out and build up of aft cabin bulk head
• Drill out and installation of nose hydraulic brackets
• Drill out and installation of intercostals, clips, and gussets
• Drill out and installation of all anchors in forward cabin
• Assisted on sealing and cleaning on center wing
• Assisted on drill out and installation of forward and aft cabin fuse mate
• Assisted on installation of forward cabin hydraulic lines
• Assisted in the bond shop and small parts
• Received several Leading Edge Awards
• EXCEL LINE
• Drill out and installation of forward and aft cabin fuse mate
• Build up and installation electrical shelf in tail cone
• Build up and installation of elevator pulley brackets
• Build up of forward cabin as a whole including drill out and installation of: side skins, ski slopes, cabin top, and all frames
• Build up and installation of side consoles
• Build up and installation of forward cabin seat tracks
• Drill out and installation of stringer 13 clips(all hilocks)
• Assisted with build up and installation of forward and aft cabin bulk head
• Assisted with aft cabin seat tracks
• Assisted with installation of plumbing lines throughout the plane
• Assisted with nose build up
• Received several Leading Edge Awards
Shop Steward
Cessna Aircraft Company - Wichita, KS
2001 to 2003
• Handled grievances between union members and company
• Worked with foreman regarding contract interpretations and issues
• Resolved conflicts within area between foreman and union members Education
Certificate of Aircraft Sheet Metal
Wichita Area Technical College - Wichita, KS
2000
Skills
• Mechanic
Certifications and Licenses
Valid Drivers License