Always looking for a skill enhancing opportunity in the field of HVAC - Power, Infrastructure, LNG / Oil and Gas projects and with a growth-oriented organization. Focus to gain quality experience in this sector, in order to achieve excellence in technical knowledge and management skills. With dedication and hard work, I want to see that my work always benefits the organization.
PROFESSIONAL SYNOPSIS:
Working as Senior Mechanical (HVAC) Engineer having 12 years of experience in FEED and detail design engineering and execution (construction and commissioning) in HVAC system required for Power, Oil & Gas (Onshore/ Offshore), Petrochemical complex and Refinery Projects. Worked as Senior HVAC Engineer with SNC Lavalin-Atkins, Sharjah. Earlier to this, worked with China Petroleum Engineering Co., Ltd, Dubai; AHI Carrier (O&G Projects), Sharjah; with Petrofac Engineering India Ltd, Mumbai; Lance Infratech Ltd (Power Projects), Gurgaon and. Victaulic India Pvt. Ltd.
ACADEMICS:
QUALIFICATION
B.E. Mechanical Engineering passed in 2008 with aggregate First Class.
Pillai`s Institute of Information Technology, Mumbai University.
Diploma in Mechanical Eng. Passed in 2005 with aggregate First Class.
Shri Datta Meghe Polytechnic, Maharashtra State Board of Technical Board, Nagpur.
CORE COMPETENCIES AND ACHIEVEMENTS
HVAC domain Exposure (Power,
Infrastructure & Oil and Gas projects)
Well versed and comfortable with Shell DEP 31.76.10.10 for HVAC for Onshore Plant Buildings, 37.76.10.10 for HVAC for Offshore Installation and 31-17-10-11 for Design of Offshore Temporary Refuge.
Well versed with Standard HVAC Design Practices and Specifications of different National Oil Companies like KOC (Kuwait), PDO (Oman), ORPIC (Oman), ADNOC Onshore and Offshore (Abu Dhabi), ENOC (Dubai), Gazprom (Russia), Novatek (Russia) and TCO (Kazakhstan).
HVAC system (DX / Chilled Water) designing for Power and O&G projects (Substations Buildings, GIS Buildings, Containerized Substation, Local Equipment Rooms (LER), Satellite Instrument Buildings, Admin. Buildings and Control Buildings) for Extreme Ambient (+55degC) projects in Middle East region.
HVAC system (Hot Water) Equipment design for LNG projects (Modular construction buildings). Specifically, for Sub Zero Ambient (-50degC) projects. Yamal LNG, North Russia. Process area HVAC equipment selection for Hazardous Area (ATEX II 2 G Exe/Exd IIB/IIC T3 IP66).
Brownfield Project: Liaise with operations team on all interface matters relating to upgrade of existing HVAC system. Adequacy check of existing HVAC system and preparing the scope of work and upgrading the HVAC system and ensure feasibility and compliance with company HVAC rules, guidelines and specifications.
Safe Haven/Toxic Gas Refuge Area/Shelter in Place: HVAC system designing for ADNOC offshore projects (Control Building/Airport Terminal Building) to make the existing building as Safe Haven/Toxic Gas Refuge with supply of clean breathing air for survival purpose for TGR duration.
Prepare and Review HVAC Calculations: HVAC Heat Load estimation using Carrier Hourly Analysis Programmed (HAP 5.11), Ventilation and Building Pressurization calculations and building air flow and distribution.
Prepare and Review ESP Calculation: Comfortable with ESP Calculation for air side and water side, also preparation of air side and water side schematic. Working knowledge of electrical and instrumentation architecture and wiring scheme.
Preliminary Sizing and Selection of the HVAC equipment: DX and Chilled water type HVAC equipment’s like Chiller, Chilled Water Pumps, AHU, ACCU, PAC Unit, Split Units, Battery/Kitchen/Toilet/Workshop/GIS rooms exhaust system, etc. and Chilled water piping and HVAC ducting accessories and Post Fire Ventilation system (FM200).
Preparing and Review of contractual documents: HVAC Scope of Work, Design Basic, Equipment Specification, Control Philosophy, Datasheet, Adequacy Report, FEED Verification report, etc. and advise the construction manager of any deficiency.
Prepare and Review HVAC Drawings: HVAC Schematic (Air side / Water side), P&ID as well as air side D&IDs, HVAC Ducting and Piping Plan, Section, Flow Balancing) Equipment MTO, Bulk MTO with respect to design and contract requirements in coordination of other disciplines (E&I, Civil & Piping). Accordingly, HVAC room / plant room sizing in coordination with all other disciplines.
HVAC Modeling and Model review Work: Providing technical inputs for modeling, Guide & Co-ordination with Designer and other disciplines, 3D modelling REVIT MEP, PDMS, SP3D, etc.
Vendor Evaluation: Vendor Offer review, Bid clarification and Technical Discussions, Bid evaluation, Equipment Data Sheet, GA Drawing, Inspection & Test Plan and Installation Operation & Maintenance Manual) related to the discipline and ensure its compliance with concept design and field engineering and site work during installation, commissioning, operation and maintenance.
Proposals and Business Development Support. Responsible to verify detailed MTOs (quantity take-off) from tender documentation. Co-ordinate & follow-up to ensuring post bid clarifications are addressed. Manhour and man power estimation for the proposals and providing the scope of work narrative to the project discipline for the proposal basis.
Working knowledge on BIM technologies, Revit, Auto PLANT Piping Design software, Auto CAD 2D & 3D.
Field/Site Engineering and Commissioning Activities:
-Monitor site activities to ensure quality of work is in compliance with approved shop drawing and Specification and get daily progress report from site supervisor (or) foreman and update to project Engineer (or) Manager.
-Site meeting and technical discussion with client/ vendor and clarifying the technical queries raised by the sub-contractors.
-HVAC system check as per vendor documentation and as built layouts and Attend the onsite client’s queries associated to HVAC construction activities.
-Work with the Commissioning Team in Pre-commissioning & Commissioning stages of all HVAC Equipment’s. Duct Leak Testing, Testing Adjusting & Balancing (TAB) of Air side and Hydronic Piping’s as per standard ASHRAE guidelines.
-Well familiar with the general HVAC installation completion procedures, start up and commissioning procedures and check points.
-Assist the Project Engineer during Preparation of Test Reports, as built drawings, Operation & Maintenance manual and handing over the project to client.
Other HVAC Engineering Activities
-Inputs to Electrical, Civil / Architectural for HVAC work and coordination
-Inter-discipline Co-ordination and technical inputs to another department
-Support project execution, site supervision and HVAC technical query resolution during construction and commissioning phase.
-Co-ordination with client and other engineering departments
SOFTWARE SKILL SET:
Carrier- HAP-5.11 (Hourly Analysis Program) and Elite (CHVAC Commercial HVAC Loads) for Heat Load Calculations.
McQuay Duct Sizer Software for Pressure drop calculation and Air Duct Sizing. McQuay Pipe Sizer Software for Pressure drop calculation and Water Pipe Sizing.
Proficient in Auto CAD 2D & 3D drawing software, Auto PLANT Piping Design software. 3D modeling in AutoCAD Revit MEP.
Familiar with 3D modeling in PDMS Modeling software for Piping, Ducting and Equipment Modeling.
Proficient with Model Review and Walkthrough and Clash Detection in Navisworks Reviewer and CAD-Duct Orbiter Software.
Proficient with Microsoft Office (Word, Excel, Power Point) and Adobe PDF Tools and Utilities.
CODES AND STANDARDS FAMILIER WITH:
SMACNA Standards
Carrier Handbook
ASHRAE Handbook and Guidelines.
SHELL DEP’s
ADNOC/PDO/KOC/ENOC/TCO/etc. Project Specifications (HVAC) PROFESSIONAL EXPERIENCE:
1)SNC-Lavalin Group - Atkins, UAE.
Senior HVAC Engineer,
From Oct 2019 to May 2020.
1.Project (Brownfield): FEED for Toxic Gas Refuge Project, Zirku Island, ADNOC Offshore.
-Scope involves HVAC System Design to make existing buildings compliant for Toxic Gas Refuge (TGR)/Safe Haven/Shelter in Place design compliant.
-The project scope is to prepare FEED design to make existing Control Building and Airport Terminal building TGR Compliant for Zirku Island, ADNOC Offshore.
2.Project (Brownfield): Extension to the existing Substation Annex Building at BuHasa Plant, ADNOC GP (Gas Processing).
-The project scope is to design the HVAC System for Extension to the Substation Annex Building due to Relocation of control equipment and other non-SF6 holding equipment.
-Extension to the Substation contained GIS Panels and other additional electrical panels and fulfill the indoor design conditions project requirement.
3.Project: Upgrade of Electrical Drive Systems of Gas Compressor, Habshan Complex, ADNOC GP (Gas Processing).
-The project scope is to design the HVAC System for the Blast Resistant VFD Building which contained new VFD Panels of compressor system and other additional electrical panels and fulfill the indoor design conditions project requirement.
4.Preparing Design Basics, Equipment Specification, Heat Load Calculation using Career HAP 5.11, HVAC D&ID and Clean air Supply P&ID for TGR areas, HVAC System Layouts and HVAC MTO.
5.Contractor’s Design Document and Vendor Document Review during the engineering stage to get all the required multi-disciplinary (Civil/Elect. /Inst) information to provide it to respective discipline.
6.Project (Brownfield): PMR for Conceptual Study for existing Substation Modification, Das Island, ADNOC Offshore.
-The project scope is to provide a conceptual study report to provide a feasible and cost-effective solution for an additional battery room in an existing Substation.
-Conceptual Study Report was provided in order to provide a solution technically and commercially suitable for the desired modification with minimum modification in the existing HVAC system.
2)China Petroleum Engineering Co., Ltd, Dubai – UAE
Senior HVAC Engineer,
From Jan 2018 till Oct 2019.
1.Project: BAB Integrated Facilities Project, ADNOC Onshore
-Project scope involves HVAC System Design and supply of HVAC Equipment for total 6 Buildings (Elect. & Inst. Equipment Buildings) and 45 Power Supply Skids (Containerized Switchgear room/LERs).
2.The project scope is to prepare the contractual deliverables as per the Company Specification so that the basic HVAC system requirement can be finalized.
3.Preparing MRs for HVAC Equipment. Technical Bid Evaluation and Vendor Offer Review and preparing Technical Bid Evaluation Report. Provide Technical recommendation to the procurement end for the vendor finalization.
4.Detailed Vendor Document Review during the engineering stage to get all the required multi-disciplinary (Civil/Elect. /Inst) information to provide it to respective discipline.
5.Site support and field engineering for construction activities by providing the required vendor drawings and contractual documents for construction progress. Also provide inputs to different disciplines with respect to building elements (building insulation, door sizes, cable routing, etc.).
6.Brownfield Scope: Adequacy check of HVAC system for existing Substation Buildings and preparing the design for upgrading the HVAC system to ensure compliance with company HVAC rules, guidelines and specifications.
7.Proposal Handled: HAIL & GHASHA Development Package-3, ADNOC Offshore.
-Project scope involves proposal of HVAC System for 220kV GIS building, Substation Building and Control Building.
-Manhour and man power estimation for the HVAC System scope.
3)AHI Carrier, Sharjah – UAE
Senior Engineer – Mechanical, O&G Projects Division,
From Aug 2015 till Dec 2017.
1.Project: Yamal LNG (Onshore)
2.Project scope involves HVAC System Design and supply of HVAC Equipment for Yamal LNG (Onshore & Offshore), North Russia project, a joint venture project designed and commissioned by consortium of Technip, JGC and Chiyoda.
3.Project highlights:
A.Fresh Air Intake Equipment: All Stainless-Steel Wind Shield & Weather Louver with external heat tracing and Shut off Damper with ExPolar heated Actuator.
B.Air Handling Unit: All Stainless-Steel Explosion-proof AHUs equipped with Filters, Hot Water Coil, Space Heaters and Fan. Entire AHU suitable for extreme minimum temperature operation at -50o.
C.Process Area Ventilation Fans: All Stainless-Steel Fans Explosion-proof and Fire safety requirements.
D.Drain piping Heat Tracing: Heat Tracing of equipment drain lines (indoor and outdoor) suitable for hazardous area to maintain +5 to 20deg. Also Heat tracing for duct elbow to take out condensate. Powered with essential power supply.
E.Preparing QCP for HVAC equipment, conducting FAT and preparing FAT report for the equipment and ensuring the reediness of the equipment to be dispatched to site after appropriate IRCs.
4.Field/Site Engineering Work (Yamal LNG, Sabetha, Russia):
A.Provide approved HVAC layout drawing, Co-ordination Drawing to site supervisor (or) Foreman and providing the team for ducting and piping approved material from warehouse to site and arrange required material to avoid progress delay.
B.Ensure availably of the equipment by coordinating with the site supervisor as required with the Equipment Release Note (ERN) and tracking the availability of the equipment and accessories for installation.
C.Coordinate with the client’s Field Engineer team for day-to-day site queries and technical queries associated to construction and resolve and close the punch points from client.
D.Coordinate with the Project Engineer during Preparation of final Test Reports, as built drawings, Operation & Maintenance manual and handing over the project to client.
E.Day-to-day management of the site, including module supervising and monitoring the site labor force and the work of any subcontractors. Preparing and checking the Lost and Damage / Site Damage Report.
4) Petrofac Engineering India Ltd, Mumbai,
Senior Design Engineer, Mechanical (HVAC), Engineering Division,
From July 2012 till Aug 2015.
1.Project: Gazprom NEFT Badra, Iraq
-Project scope involves HVAC System Design and supply of HVAC Equipment for total 6 Buildings (2 Elect. Substations & 3 Satellite Instrument Buildings)
2.Project: ORPIC Sohar Refinery Improvement Project, Oman.
-Project scope involves HVAC System Design and supply of HVAC Equipment for total 16 Buildings (5 Elect. Substations, 5 Instrument Buildings, Control Building, Fire Station, Guard House, 2 Operator Shelters and Maintenance Workshop).
3.The project scope is to prepare the contractual deliverables as per the Company Specification so that the basic HVAC system requirement can be finalized.
4.Preparing MRs for HVAC Equipment. Technical Bid Evaluation and Vendor Offer Review and preparing Technical Bid Evaluation Report. Provide Technical recommendation to the procurement end for the vendor finalization.
5.Detailed Vendor Document Review during the engineering stage to get all the required multi-disciplinary (Civil/Elect. /Inst) information to provide it to respective discipline.
6.Field/Site Engineering Work (Gazprom NEFT Badura, Iraq):
a.Ensuring that all materials used and work performed are as per specifications.
b.Review Contractor’s mechanical services material proposals against specified technical performance requirements and advise the Project Manager on the appropriateness of the proposals and client approval.
c.Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
d.HVAC construction, startup and commissioning activities. Work with the Commissioning Team on Duct Leak Test, Testing, Adjusting & Balancing (TAB) stages of the Air side.
5)Lanco Infratech Ltd, Gurgaon, New Delhi
Senior Engineer, Mechanical (HVAC), Engineering Division,
From April 2011 till July 2012.
1.Preparing Specifications, detail design and engineering for the Chilled Water HVAC, typically for 2x660MW Coal based Thermal Power Plants.
2.Designing of Chilled Water Air-conditioning system for different areas specially the control rooms through the plant and deciding the equipment capacity as per the requirement. Selecting the equipment (chiller, pump, cooling tower, AHU, pan humidifier, strip heater, etc.) capacity for the estimated design.
3.Preparing detailed Control Philosophy, Air flow Diagrams, Zone layouts, Schematic / P&ID for AC, Duct Design and Layout, Piping Design and Layout, Equipment Layouts, and coordination with the Mechanical, Electrical, C&I and Civil counter parts.
4.Designing of the Ventilation system for different areas mainly the Power House Building/ Control Building, CHP and AHP areas and various other pump houses throughout the plant and deciding the ventilation requirement. Selecting the equipment for all areas throughout the plant (Air Washer Units/Unit Air Filters/ Fan Filter Units/Supply and Exhaust Fans in all areas etc.) capacity for the estimated design.
6) Victaulic India Pvt. Ltd, Mumbai, as HVAC/Piping Designer
Piping Detailer (HVAC)
From Oct 2008 till April 2011
1.Worked with Bentley Auto PLANT Design, AutoCAD MEP, TSI CAD-Mech/CAD-Duct (Technical Sales International) & Revit MEP software for Piping of the MEP Scope (HVAC, Fire Protection and Overall Plumbing).
2.Project modeling for BIM (Building Information Model) Projects (3D & 4D) using different software with the available BEP. Detailed modeling of the Structure, Architecture, MEP and Ducting of the building in 3D. Proficient in using Autodesk Navisworks and below software’s for walkthroughs and clash detection.
3.Project modeling for Proposal Mode & Retrofit Project in Bentley Auto PLANT / TSI CAD-Mech / Revit MEP. Preparing GA Drawings, Pad and Equipment Layout and Piping Layout of the Piping system for construction purpose in Auto PLANT and TSI CAD-Mech.
4.Preparing Fabrication Drawings, Spool Sheets, Detailed Isometrics & Bill of Material and of the Piping system for the unique way of delivery of products called “Bag and Tag” method.
PERSONAL PROFILE:
Birth date: 23rd Oct, 1986.
Passport: Passport No. T0671884 Exp Dt. 09/12/2028.
VISA: Valid UAE Visa (Valid till November 2021).
Other License: UAE Driving License (Valid from April 2017 to April 2027).
Time for joining: 1 Month (Or less if required).
Languages: Can speak, read and write English, Hindi and Marathi.
Contact: Skype or mail or call. Skype id “abhinandan19862”.
Abhinandan Patil
30/06/2020
ABHINANDAN PATIL, B.E (Mechanical.), HVAC Design - Power,
Infrastructure and LNG / Oil and Gas projects.
Email - **********.******@*****.***
Permanent Address:
Chhadva Galaxy, Flat No-405, Plot No 2A,
Sector 18, Kamothe – 410209, Navi Mumbai, India.
Mobile: +91-955-***-**** (India).
UAE Residence Address:
Al Qasimia, Sharjah, UAE.
Mobile: +971-**-***-**** (UAE Number).
Valid UAE Driving License (Valid from April 2017 to April 2027).