CURRICULUM
Name: SUDITU DAN
Date of Birth: **.02.1982
Qualifications: Electrotechnical Engineer
Present Position: Engineering Manager
Department:
Company: OMV PETROM
Place of Work: Ploiesti, Romania
Contact: email- *********@*****.*** tel: 072******* Professional Experiences
From To Position Company
1.11.2006 1.11.2012 Automation and Instrumentation Engineer Snamprogetti Romania SRL
From To Position Company
1.11.2012 1.10.2018 I&C Lead Engineer GE Power /ALSTOM From To Position Company
1.12.2018 present Engineering Manager OMV PERTOM
PROFESSIONAL CURRICULUM
Period: from . 2018 present
Job/Role: Coke drums replacement - Engineering Manager Company: OMV Department:
Country/Location: Brazi / Site
Main activities, responsibilities and brief description of Company/work environment:
Implements consistent working processes, to ensure design integrity and standardisation
Entitles contractor to elaborate results for the technical design, provides OMV specific input
Approves the results of technical design, which will be provided by the contractor
Specify and implement the detailed operating/maintenance requirements in close cooperation with operations- and maintenance representative
Decision over necessary standard deviations together with EA and group experts
Co-ordination of the assigned specialist areas
Fulfil project targets in respect to functionality
Active coordination between project team, operation, maintenance and contractor (e.g. engineer partner etc.)
Ensure integrity of data in the Basic Engineering Design Documentation (BEDD) is standardized and communicated to all stakeholders
Ensure the compliance with all relevant European and local engineering legislation
Provide guidance for standardization of equipment, procedures and policies advantageous for the project
Take the lead in ensuring technical design integrity for all projects
Be process interface and perform gap management for all technical issues
Ensure that interfaces between projects are addressed and resolved
Leading the overall process of engineering preparation
Ensure commissioning and start-up procedure is addressed starting with SELECT phase
Approve all engineering control documents such as plot plans, P&ID's, electrical single line diagrams, control panel drawings, building layout drawings, equipment and subcontract specifications (only for major equipments and contracts), bid summary recommendations etc.
Ensure timely performance of HAZOP and safety reviews and incorporation of recommendations
Coordination of offsite facilities & utilities and ensure the requirements are defined for each unit and implemented in time
Ensure contribution of the discipline engineers to the elaboration of cost estimates in accordance with international standards throughout the whole project PROFESSIONAL CURRICULUM
Period: from . APR/2016 2018
Job/Role: CAN KOMUR WFGD Project - I&C Lead Engineer Company: GE Power Department: I&C
Country/Location: Romania / Italy / Site
Main activities, responsibilities and brief description of Company/work environment: Coordinating all activities for Electrical and I&C departments: Selection of instruments and valves, preparing all ELE and I&C documents (i/o list,alarm list, cable list, hook-ups, instruments location drawings, load list,process funtional description, data sheets,technical tabulation, follow up for all instruments, valves, gas analysers, motors and mechanical packages.
PROFESSIONAL CURRICULUM
Period: from . JUN/2015 APR/2016
Job/Role: CRIOVA WFGD Project - DCS and Instrumentation Site supervisor Company: GE Power /ALSTOM Department: I&C
Country/Location: Romania / Craiova site
Main activities, responsibilities and brief description of Company/work environment: Main duties
Performing all assigned routine duties for I&C requirements such as Installation /Maintenance of the different types of field installed instruments such as transmitters for (Flow, Level, Pressure and Temp) and make necessary adjusting and maintenance for different types of pneumatic and motorized valves.
Operate DCS control console to coordinate and regulate process variables and to direct flow rates of various process and utility streams according to prescribed schedules. Set controls to adjust process variables, such as flows, temperatures and pressures.
scheduling and coordinating work to tight deadlines
ensuring that equipment works to its specification
creating and carrying out test procedures
investigating problems, diagnosing/repairing faults
troubleshooting
liaising with installation/project engineers
supervising engineering and technical staff
writing reports and documentation
providing technical support
ensuring safe working conditions
training maintenance and operative staff where appropriate PROFESSIONAL CURRICULUM
Period: from . NOV/2012 JUN/2015
Job/Role: CRIOVA WFGD Project/ I&C Lead Enginner
Company: GE Power / ALSTOM Department: I&C
Country/Location: Romania / Bucharest
Main activities, responsibilities and brief description of Company/work environment: Main duties
Be familiar with the RfQ/contract related to I&C discipline
Plan and co-ordinate the activities within the framework that has been given to the discipline
Ensure the technical monitoring of suppliers/subcontractors
Ensure that the contract's specifications are implemented in the discipline
Manage discipline meetings to resolve specific problems within the discipline
Be the interface to other disciplines to ensure structured and correct flow of information
Find potential risks and propose a mitigation plan
Be responsible for the documentation to the Operating and Maintenance Manual for I&C discipline, is delivered
Ensure all deliverables are made according to schedule or agreements.
Ensure the processes are followed and all deliverables are made in time
Define work packages and/or split of work between engineers
Check the output from the the team, including externals
Resource planning, scheduling, progress and cost control relating to his/her discipline
That progress and the work on document and/or equipment production is in accordance with the progress plan and the quality requirements
Ensure that cost remains within the allocated budget for the discipline. If deviation occurs an action plan shall be developed.
Report engineering changes and the impact of forecasted engineering hours to be communicated to Project Engineer
Manage checking of technical documents and drawings with reference to the part of the Master Document List (MDL) belonging to the discipline
Ensure that the deliverables are documented and archived properly
Reporting hours worked and/or the progress of allocated activities in accordance with the contract
Technical evaluations of change orders
Make recommendations concerning the choice of supplier and solution within I&C discipline
Participate in purchasing negotiations and work with Purchasing and Project Manager to establish the appropriate basis for the order/contract, together with responsible engineer Period: from . JUN/2009 NOV/2012
Job/Role: Est SANNAZZARO Project/ Instrument Engineer / Discipline Leader Company: Snamprogetti Romania Department: SMAUT
Country/Location: Romania / Bucharest
Main activities, responsibilities and brief description of Company/work environment:
- Preparing data sheets for instruments using Intergraph INtools software, checking and approving vendor’s offers; for instruments such as: local indicators, electronic transmitters, Thermoelements and Thermowells,Temperature Gauge, Orifice Plates and Restrictions Orifice,Level Gauge.
- Cable Route Layouts
- Electronic and Fieldbus Instruments Layout
- Cable Lists
- Wiring
From December 2010 my role was Discipline Leader on mono disciplinary activities for this project,assuring the communication/interface with Milan Office, coordinating the team, checking the documents, preparing reports,planning.
Period: from . FEB/2009 to JUN/2009
Job/Role: ENGRO Project-FAT Factory Acceptance Test / Instrument Engineer Company: Snamprogetti Romania Department: SMAUT
Country/Location: Italy / Monza
Main activities, responsibilities and brief description of Company/work environment: Taking part in the FAT activities of DCS and ESD system on vendor premises (Honeywell) Assist the modbus communication tests between DCS and other packages Checking the various instrument information to be up-loaded in the system (instrument ranges, alarms, etc.)
Update the I/O signal database
Prepare the control loop’s typical
Period: from . MAY/2008 to FEB/2009
Job/Role: Khurais Project Saudi Arabia / Instrument Engineer – Discipline Leader Company: Snamprogetti Romania Department: SMAUT
Country/Location: Italy / San Donato Milanese / Romania / Bucharest Main activities, responsibilities and brief description of Company/work environment: Assuring the communication with Milan Office, coordinating the team, checking the documents, preparing reports.
Verification and update of INtools Database,cross-checking with P&ID in order to have all the information for the Instrument Loop Diagram and Instrument Segment Diagram generation activity. Instrument wiring connections using INtools SmartPlant Instrumentation, version 7.0. Instrument Loop Diagram and Instrument Segment Diagram generation using INtools SmartPlant Instrumentation, version 7.0.
Period: from . JAN/08 to MAY/08
Job/Role: Khursaniyah Project Saudi Arabia / Instrument Engineer Company: Snamprogetti Romania Department: SMAUT
Country/Location: Italy / San Donato Milanese / Romania / Bucharest Main activities, responsibilities and brief description of Company/work environment: Italy:
Instrument wiring connections generation using INtools SmartPlant Instrumentation, version 7.0 for Mitsubishi Gas Turbine package
The main activities was to understend the new typicals in order to be able to continue this job in Romania Romania:
Assuring the communication with Milan Office, coordinating the team, checking the documents, preparing reports.
Instrument wiring connections generation using INtools SmartPlant Instrumentation, version 7.0 for Mitsubishi Gas Turbine package
Instrument Loop Diagram generation using INtools SmartPlant Instrumentation, version 7.0. Period: From OCT/2007 to DEC/2007
Job/Role: Taranto Plus Project/ Instrument Engineer Company: Snamprogetti Romania Department: SMAUT
Country/Location: Italy / San Donato Milanese
Main activities, responsibilities and brief description of Company/work environment: The first phase of the activity consisted in participation and support giving in the development of the General specifications for the control systems like DCS, ESD and FGS. The above mentioned specifications were elaborated in accordance with contractual requirements considering all the aspects involved in the development of the project. In the second phase, defined to be the detailed design of the project, the activity consist in verification of the documentation elaborated by others and integration of all the comments. In particular, the specific documents under my supervision were “DCS Control Narrative”, “F&G Logic Diagram”, “ESD Logic Diagram” and “Cause & Effect Matrix”. For this part of work, I was involved in technical meetings with Process department, package vendor and with the external company in charge with the preparation of these documents. Period: From JUN/2007 to OCT/2007
Job/Role: Khursaniyah Project Saudi Arabia / Instrument Engineer Company: Snamprogetti Romania Department: SMAUT
Country/Location: Romania / Bucharest
Main activities, responsibilities and brief description of Company/work environment: Assuring the communication with Milan Office, coordinating the team, checking the documents, preparing reports.
Instrument wiring connections generation using INtools SmartPlant Instrumentation, version 7.0. Instrument Loop Diagram and Instrument Segment Diagram generation using INtools SmartPlant Instrumentation, version 7.0.
Period: From MAR/2007 to JUN/2007
Job/Role: Khursaniyah Project Saudi Arabia / Instrument Engineer Company: Snamprogetti Romania Department: SMAUT
Country/Location: Italy / San Donato Milanese
Main activities, responsibilities and brief description of Company/work environment: Verification and update of INtools Database,cross-checking with P&ID in order to have all the information for the Instrument Loop Diagram and Instrument Segment Diagram generation activity.
Instrument wiring connections generation using INtools SmartPlant Instrumentation, version 7.0. Instrument Loop Diagram and Instrument Segment Diagram generation using INtools SmartPlant Instrumentation, version 7.0. This was an activity developed for the first time using INtools software.
Period: From DEC/2006 to MAR/2007
Job/Role: Orlen PTA and Singapore Parallel Train– Bidding engineering activities / Instrument Engineer
Company: Snamprogetti Romania Department: SMAUT-R
Country/Location: Romania / Bucharest
Main activities, responsibilities and brief description of Company/work environment: Instrument Index, P&ID and data-sheets cross-checking and up-date activities ( including realising of special materials instruments list).
EMH estimate and Bill of Quantities preparation, installation and site assistance costs estimate
(“Artore” and “Costi /Euro” files), main cable routing and JB location studies (estimation of cable trays and multicables lengths).
Estimation of the number of signals managed by control systems like DCS, ESD, F&G, MMS
(Systems I/O List, including realising of I/O Typicals). Period: From NOV/2006 to JAN/2007
Job/Role: Samir Upgrade Project / Instrument Engineer Company: Snamprogetti Romania Department: SMAUT-R
Country/Location: Romania / Bucharest
Main activities, responsibilities and brief description of Company/work environment: PDS 3D Modelling activities working with PD_SHELL software: junction boxes, off-line instrumentation modelling, interferences checking. Instrument hook-ups (primary, pneumatic, electrical, air distribution pots) verification and update. Preparation of documents as “Fire and Gas Detectors Location”, “Electronic Instrument and Junction Box Location”, using MicroStation version J software. LANGUAGES KNOWLEDGE
Language: Romanian Level: Mother Tongue
English Level: Functional
Section C
TRAINING
Title of the course: 2006 Training for junior designers School: Snamprogetti Romania S.R.L.
Period and
Location:
17.07.2006 – 27.10.2006, Bucharest
Title of the course: PDS 3D Equipment Modelling
School: Snamprogetti Romania S.R.L.
Period and
location:
December 2006, Bucharest
Title of the course: “Introduction to Project Management” School: ENI Corporate University
Period and
location:
26.05.2008 – 29.05.2008, Hotel Caro,Bucharest
Title of the course: “Advanced Problem Solving”
School: ENI Corporate University
Period and
location:
17.09.2008 – 18.09.2008, Hotel Caro,Bucharest
Title of the course: “Basic Communication”
School: ENI Corporate University
Period and
location:
23.02.2010 – 24.02.2010, Hotel Caro,Bucharest
Title of the course: “Being a specialist and a manager” School: ENI Corporate University
Period and
location:
25.03.2010 – 26.03.2010, Hotel Caro,Bucharest
Title of the course: “Introduction to COMOS”
School: ALSTOM
Period and
location:
01.11.2012 – 07.11.2012, Italy
Others: MTA, SAP,SPI, Technical traninings in Control valves, Nuclear Measurements, Project Management..