Ognjen Sucur
Instrumentation And Control Specialist
Address: ***** ********* ******* ***, ************, Louisiana, 70769
Phone: 713-***-****
E-mail ********@*******.***
LinkedIn https://www.linkedin.com/in/ognjen-sucur-270941ab
Industrial Instrumentation & Controls Technician
Maintenance/Turnaround Professional
Dedicated Instrumentation Technician with 12+ years of experience of calibration, install and repair of instrumentation. Disciplined and hardworking team player with proven history of fast and detail-oriented work.
Experience includes troubleshooting, diagnostics and service on diverse instrumentation. Able to configure components for optimal performance. Talented repairer with an organized and systematic approach.
Skills
Strong written and verbal communication skills
Excellent
Dependable and reliable
Excellent
Safety knowledge
Excellent
Strong team player
Excellent
Documentation
Excellent
Calibration
Excellent
Testing and troubleshooting
Excellent
Work History
2019-08 - 2019-12
I&C Specialist
Stronghold, Cheyenne, Wyoming
Complete site Shutdown, Turnaround and Startup
Removed old and damaged instruments
Calibrated new and old instrumentation before installation or while in service
Completed tear-down of existing structures and prepared for new construction
Maintained positive relationships with all customers
Installed, aligned, and tested new equipment
2019-04 - 2019-06
I&C Specialist
Emerson, Memphis, Tennessee
Log in the Valero network, to get P&ID's, Location Drawings and Specification Sheets to print out in the office
Review documentation and location before heading out to the field
Inspect, Verify and Calibrate all AMS Instrumentation with a Fluke 754 according to specification sheet
Download and save all instrumentation specifications to the Fluke 754
Upload all data connecting Fluke 754 to computer that is connected on Valero's Network
Document Pass or Fail after upload
2019-01 - 2019-03
I&C Specialist
Marathon Oil, Malabo, Africa, Equatorial Guinea
Use P&ID's, Location Drawing and Specification Sheets
Disconnected GE Bently Nevada
Reconnected GE Bently Nevada
Verify all GE Bently Nevada connections for proper communication, calibration inside the DCS as well as inside the control room
Four GE Frame 5 Turbines turnaround
2018-01
I&E Technician
Turner Industries
Use P&ID's, Location Drawing and Specification Sheets
Log in network for updated Specification Sheets, P&ID and Location Drawings to print out in the office
Responsible for installation, calibration and testing of all instrumentation
2017-01
Marathon, I&C Commissioning & Startup Technician
Texas City, Texas
Use P&ID's, Location Drawing and Specification Sheets
Check and Inspect all Instrumentation and Controls after installation
Verify Calibration and specifications
Go inside operations building to plan all job tasks and to properly verify functionality and specifications of all instrumentation/controls
2016-06 - 2016-10
Commissioning & Startup Technician
CF Industries, Sioux City, Iowa
Build P&ID's, Location Drawing and Specification Sheets using the computer. For the new addition to the plant. Everything done according to CF Industries specifications.
Log in CF Industries network, update all new data.
Print all documentation for the specific instrument or loop at the commissioning office
Build a folder with all printed documentation and specifications for the particular instrument or loop at the commissioning office
Communicate with CF Industries personnel on which folders are finished
Check and Inspect all Instrumentation and Controls after installation
Verify Calibration and specifications
Check vibration transducers & RTD thermocouples for proper installation and connections on steam turbine generators (G.E 7Fa)
Test functionality of all controls, trips, fails of turbine
Sign off paperwork that everything is tested and ready
2016-01 - 2016-05
Commissioning & Startup Technician
CVR Entergy, Coffeyville, Kansas
Use P&ID's, Location Drawing and Specification Sheets
Responsible for location, tagging, pulling instruments from the field
Calibrating all instrumentation removed from the field in our calibration office
Returning and loop-checking all instruments pulled while in contact with operations, including some on the spot calibrations as needed
2015-08 - 2015-11
Lead I/C Commissioning Engineer
Calumet, San Antonio, Texas
Use P&ID's, Location Drawing and Specification Sheets
Expansion project with all Fieldbus instrumentation
Log in the Fieldbus control computer to function check connections and communication with specific instruments
Responsible for all connections of fieldbus leading to the brick and instrumentation
Checking all specifications downloaded into the instrument
Function checking all work done
2015-05 - 2015-07
I&C Commissioning & Startup Technician
LEPA Power Plant, Morgan City, LA
LEPA Power Plant Start Up and Commissioning
Performed pre-commissioning inspections of instrumentation systems to insure client specifications are met prior to system acceptance from construction on GE LM6000 Gas Turbine Generator and the Siemens Steam Turbine Generator
Maintenance and commissioning in systems such as potable water, High pressure and low pressure systems, boiler feed water, Chemical Feed, Fuel Gas, Steam Turbine generator, Cold Circulating water, waste water
2015-03 - 2015-05
Maintenance Technician
Shell, NORCO, LA
Full plant maintenance while Shell was on strike
Responsible for functionality of all work done and communicating with the main I&C Supervisor of Shell
2014-10 - 2015-01
Instrument Technician
Valero, Chalmette
Responsible for installation, calibration and testing of all instrumentation during turnaround
2014-08 - 2014-09
Instrument Technician
Green Diesel, LA
Testing all instrumentation damaged from fire for functionality and calibration, pulling damaged instruments and getting calibration data for new installs in our calibration office
Replacing/calibrating all damaged instruments
Verifying loop wiring and all points to the house with operations
2014-07 - 2014-08
I&C Commissioning Engineer
Placid Refining, Port Allen, LA
Checking wiring and calibrations installed by technicians
2014-04 - 2014-06
Instrumentation Technician
Dow Chemical, St.Charles, LA
Responsible for full maintenance in Olefins 1 & 2
Worked side by side two Dow Chemical employees
2014-01 - 2014-03
DCS Technician
Methanex, Geismar, LA
Checking all DCS cabinets and functionality
Checking PLC programing
Checking PLC Modules/Cards
2013-09 - 2013-12
Maintenance Technician
Precision Engineering, Corpus Christi, Texas
Maintenance of all instruments in correlation to every furnace within the whole site
Responsible for support in utilities area that included steam turbines generators and gas turbine generators (G.E
6b and 7Fa)
2013-05 - 2013-09
Turnaround & Maintenance Technician
Dow, LA
Responsible for tagging, pulling and location of instrumentation before cleaning
Returning instrumentation, calibration and loop-checking all instruments pulled
Daily maintenance PM's
Weekly Ph Calibrations site wide
2012-04 - 2012-07
Maintenance Technician
DuPont, LaPlace, LA [Plant assist]
Responsible for full maintenance in all units working side by side DuPont employees., Maintenance & PM's of all instruments and control devices
Maintenance & PM's on furnaces within the whole site
Maintenance & PM's on turbines
2011-03 - 2011-07
Shell
Turner Industries Group LLC, NORCO, LA
Site wide Maintenance Technician
Conducted troubleshooting procedures and root cause analysis to determine causes of problems
Kept shop area and equipment clean, organized and maintained
Responded to problems with processing and production equipment and completed timely repairs
Used information in technical diagrams, schematics and manuals to understand operations and make successful repairs
Supported technicians in equipment maintenance and repair
2010-11 - 2011-03
Instrument Technician
Valero, NORCO, LA
Responsible for installation, calibration and testing of all instrumentation for turnaround
2010-01 - 2010-07
Maintenance Technician
Valero, Memphis, TN
Responsible for plant wide maintenance working side by side with Valero employees
Meet every day with instrumentation group for all work orders to be assigned
Daily PM's
Weekly gas detector checks and maintenance
2009-07 - 2010-01
Instrument Technician
Dow Chemical, Plaquemine, LA
Maintain, repair & replace site-wide gas detectors
PM's on site-wide Ph systems
2009-01 - 2009-05
I&E Technician
Marathon, Garyville, LA
Tested fire eye's and vibration switches
Allen Bradley Control Logix PLC
Education
2006-09 - 2008-06
Associates: Instrumentation & Control Systems
ITI Technical College - Baton Rouge, LA
2001-08 - 2005-05
High School Diploma
Redemptorist High School - Baton Rouge, LA