PROJECT MANAGER - BUILDING & INFRASTRUCTURE (CIVIL)
JAFAR MUBARAK AMIR BIN HAREEZ
*******@*****.*** *******@*****.***
Page 2 of 14
JAFAR MUBARAK AMIR BIN HAREEZ
Nationality Yemen
Date / Place of Birth 18/04/1957, Jakarta, Indonesia Mobile & E-Mail +966-*********
E-Mail:*******@*****.***
Marital Status Married
Profession Civil Engineering
Job Target Executive Director, Project Manager (Building or infrastructure), Project Director (Building or
infrastructure),Project Manager Coordinator,
Senior Civil Engineer, Property Holder
Assistances Manager, Property development
Manager, Project coordinator, Construction
Manager, Purchasing Manager, External
Relations Manager, Facilities Maintenance
Manager (Civil Engineer),Maintenance
Manager (Civil Engineer), Cold-Formed Steel
Design Specialist and EST
Position in Group Project Manager / Privet Projects Director
(Western Area – KSA)
Years of Experience 30YEARS
Position Recommended Senior Management
KEY QUALIFICATIONS
Dedicated civil engineering professional with 30 years experience in the field of Infrastructure Planning and managing construction of many projects such as Roads, Underground Tunnel Projects, Culverts, High Rise Buildings, Resort and Community Development, Car park Building and Spread villas etc.
Having professional experience in the management of construction projects including planning, scheduling, coordinating, directing & organizing ensuring the job accomplishment within target of Cost, Time, Quality and safety in accordance with the project specifications, standards & regulations including solving problems, monitoring labour, equipment, materials, and Engineering Economics, Management science & Environmental Impact Analysis. . In addition familiar of versed in international standards such as AASHTO, ASTM, ISO, UBC, ACI, FIDIC (INTERNATIONAL FEDERATION OF CONSULTING ENGINEERING).and Saudi standards and work procedures.
Page 3 of 14
EDUCATION AND PROFESSIONAL STATUS
B.Sc Degree in Civil Engineering Colorado State University Pueblo Co. USA (1985)
Certified Minor Degree in Mathematics Colorado State University Pueblo Co. USA(1985)
Transcripts Columbia College, Columbia Mo. USA (1985)
Master Degree in Project Engineering Management USA (On Going) College Projects:
1. Road Design Project
The graduation project based on Road Design for PURECELL Blvd. on city of Pueblo Co. USA. The achievement was completion of Survey, Estimation & Outlining of the total cost to construct the road. 2. Preparation proposal set up a Develop city USA
Responsible for developing medium and long-range, infrastructure (water, sewer, drainage) planning for the City.
Developing water, sewer, drainage master plans to guide infrastructure development and growth of the City.
Process requests for compliance with Adequate Public Facilities Ordinance (APFO) and water / sewer allocation.
Provide assistance to citizens in the evaluation of drainage and flooding problems and resolve those for which the City is responsible.
Assisted in Development of design to provide water Distribution, water Supply, waste water and storm water drainage adequate light, air, open space, landscaping, and off-street parking and loading facilities project to develop newly Constructed city for residential, commercial, industrial, and public uses in the USA. Courses & Certificates:
Certificates in English as a Second Language
Colorado State University, Pueblo Colorado, USA 02 August 1985
Training for ISO9000 Al-Khorayfee Management Service, Jeddah, KSA1997
Training by NEDCON B.V of Netherlands
Technical Design of Steel Static structural Doetinchem, Netherlands 2000
STAAD Pro Software Application Dammam City KSA 2000
MathCAD Software Application & minor knowledge in AutoCAD Software Application
Participated in the PM Training course of S2C7-(PMBOK)-Project Human Resources Management Jeddah, KSA2
Participated in the PM Training course of PMP and CAPM PREP COURSE Jeddah, KSA2011
Page 4 of 14
EXPERIENCE RECORD
YEAR COMPANY / GROUP
25 September 2015 up-to-date MAPOUT PLUS CONSTRUCTION COMPANY
(Jeddah-KSA)
Positions held PROJECT MANAGER / PRIVET PROJECTS
DIRECTOR
Major Projects handled PRIVET PALACE – VILLA - COMMERCIAL BUILDINGS - MULTI STORIED BUILDINGS,
(LOCATION: WESTERN REGION)
Responsibilities & Achievements
Managing and leading the project team.
Recruiting project staff and consultants.
Managing coordination of the partners and working groups engaged in project work.
Developing and maintaining a detailed project plan.
Managing project deliverables in line with the project plan.
Recording and managing project issues and escalating where necessary.
Resolving cross-functional issues at project level.
Managing project scope and change control and escalating issues where necessary.
Monitoring project progress and performance
Providing status reports to the Project Sponsor.
Managing project training within the defined budget.
Liaison with, and updates on progress to, Project Steering Board/Senior Management.
Managing project evaluation and dissemination activities.
Managing consultancy input within the defined budget.
Final approval of the design specification.
Working closely with users to ensure the project meets business needs.
Definition and management of the User Acceptance Testing programme.
Identifying user training needs and devising and managing user training programmes YEAR COMPANY / GROUP
18 July 2012 to 18 September 2015 Saudi Arabian Parsons Ltd. (KSA) Positions held SENIOR INFRASTRUCTURE ENGINEER MOH
PROJECTS JEDDAH (KSA)
Major Projects handled PRINCE FAWAZ SITE PROJECTS JEDDAH (KSA) CONSIST OF 10,000 APARTMENTS
Responsibilities:
1. In charge of coordination to obtaining all necessary permits from relevant local authorities.
2. Produce and compile all the documents (“request letters, drawings, method statements etc) required by relevant local authorities.
3. Follow-up local authorities in charge of building permit and obtain final building permit. Page 5 of 14
4. Update permitting status and follow-chart on weekly basis. 5. Interact with design section for securing all the relevant information with regards to new design in some area.
6. Conduct discussion with various consultants with regards to their projects. 7. Solve technical issues arisen out of interface with third parties. 8. Collect, compile and update all data related to existing and future interface. 9. Verify that projects have obtained all necessary approvals; verify professional and contractor licensing.
Project engineering coordinators
Responsible for coordinating the clerical and administrative aspects of each engineering project in order to ensure smooth execution.
Prepare materials, purchase orders and invoices and forecast budgets to ensure financial conformation.
Schedule customers’ visits, record the minutes of the meetings and even monitor construction activities when required.
Presentations and explain proposals to customers and even negotiate terms with them.
Maintain liaison with engineers in order to develop engineering plans and manage submission schedules as appropriate.
Assist quality assurance teams to ensure the quality of each proposal submission and the end project in itself.
Coordinates structural details and design features within the project. Conducts meetings with designers and detailers as required.
Standardizes details to permit reproduction rather than redrawing and seeks other methods of reducing plan cost.
Works closely with governments and privet authorities to meet the specifications
Keeps continual contact with government and privet authorities. Achievements
No. Descriptions Authority Status
06_01 Approval of Internal Roads Network Design AMANA 06_02 Approval of Storm Drainage Network Design AMANA 06_03 Approval of Street Lighting Network Design AMANA 06_04 Approval of Street Landscape Design AMANA
06_05 Approval of Main Irrigation Network Design AMANA 06_06 Approval of Parks & Open Spaces Design AMANA 06_07 Approval of Traffic Impact Study AMANA
06_08 Approval of Site Boundaries (Survey) AMANA
06_09 Approval of Hydrology Report SGS
06_10 Approval of Storm Drainage Network Design JSDP 06_11 NOC from General Authority of Civil Aviation GACA 06_12 Approval of Potable Water Network Design NWC 06_13 Approval of Sewerage Network Design NWC
06_14 Approval of Sewerage Treatment Plant Design NWC 06_15 Approval of Electrical Demand Calculations SEC 06_16 Approval of Electrical Grid Substations Locations SEC 06_17 Approval of Electrical Network Design SEC
06_18 Approval of Potable Water Connection NWC
Legends
Approved
Under Discussion
Page 6 of 14
Rejected
Not Submitted
AMANA Municipality
SGS Saudi Geological Survey
GACA General Authority of Civil Aviation
MOWE Ministry of Water & Electricity
NWC National Water Company
SEC Saudi Electricity Company
MOT Ministry of Transport
ADA ARRIYADH DEVELOPMENT AUTHORITY
JSDP Jeddah Storm water Drainage Program
CD Civil Defence
MOH Ministry of Housing
YEAR COMPANY / GROUP
11May 2010 10 June 2012 MTMM ENGINEERING CONSULTANCY OFFICE JEDDAH (KSA)
Positions held MAINTENANCE AND OPERATION (CIVIL
ENGINEER) / Lead Engineering Utility Planning
Project Coordinators
Major Projects handled Municipality Tower (AMANA Tower) & ZAHRAT ALSETEEN Building.
Responsibilities:
Providing advice and assistance to the Director General, Engineering/Program Manager/Project Managers/ Construction Managers on design and engineering aspect of the projects including engineer’s estimates for the Jeddah Municipality. Main tasks and responsibilities are:
Managing the performance of the design consultants to contract scope, cost, schedule and the objectives of the projects.
Challenging the design consultants to maximize quality and value while minimizing the risk profile for the various projects and the overall projects.
Managing park-wide coordination of interfaces with the work of the design consultants.
Managing technical and constructability reviews of deliverables.
Providing assistance and advice in the preparation of project requirements and objectives and coordinates these across the projects.
Managing designer procurement, contract, and performance, ensuring designer’s responsibilities and scopes of service are clear, design deliverables are defined for each stage of work.
Ensuring designers are aware of, trained on and consistently using project processes and procedures, including, design standards & procedures, design system and tools.
Administering the following key project processes and manages all consultants for compliance. Document control, health and safety in design.
Leads Value Management and Engineering workshops, challenges design reviews quality, value and risk for the overall projects.
Engages and Leads the technical resources required to provide quality assurance on Page 7 of 14
the consultant’s deliverables, covering aspects such as completeness, cost, build ability, risk, health & safety, sustainability and specialist technical issues.
Manages the consultant to obtain detailed planning permission; third party and statutory approvals.
Prepare concept, preliminary and detailed design (if needed) with technical specification, research studies, for award purpose.
Review of detailed design, shop and as built drawings, calculations and engineering submittals for construct purposes from consultants/contractors.
Maintain a library of technical standard/specifications.
Facilitate partnering.
ACHIEVEMENTS
Preparation for Modification and new Contracts Projects.
Approve the monthly invoices issued by the Contractor.
Participate in Studies Preparing to improve the services provided in the AMANA
(JEDDAH-MUNICIPALITY) Projects.
Managing Operations & Maintenance and Construction Works Projects.
Issued Preventive Maintenance Schedule at start of month.
Translate the ideas into Applicable projects including BOQ, Drawings, Quotations, etc.
Prepared Daily, Weekly, Monthly Reports.
Prepared schedule for corrective maintenance in priority works.
Supervisor and Consultant of Maintenance and Operation for Municipality Buildings and tower.
Supervision and Consultant of Maintenance and Operation for Amana Building and tower.
Design review for Jeddah Municipality Projects
YEAR COMPANY / GROUP
2009 to 2010 DURAT SABA for road contracting and
Construction Company
Positions held WESTERN REGION MANAGER
Major Projects handled King Abdullah University of Science and Technology (KAUST), Princess NOURA Bint
ABDULRAHMAN University for Women,
and Saudi Oger Co. Ltd Camp
Responsibilities:
Advance study of civil construction drawings to estimate, schedule and plan the construction activities of the road, drainage and maintenance projects.
Manage the field staffs, tools and equipment and liaise with the consultant, the local government officials and other local stakeholders through regular meetings.
Develop and implement a cost / schedule control system, analyses the project performance with forecasting including the cost reports, budgeted activities and man- days quantities and discuss with project management about those issues.
Provide technical expertise for the construction procedures, environmental issues, site management, laboratory works, material procurement and hence the overall quality control
Quality control and assurance on site works in terms of materials, workmanship, safety and deadlines
Page 8 of 14
Monitor and manage the subcontractors, verify and recommend the subcontractor’s bill of quantities. Communicate and negotiate with suppliers to verify the specification and technical details of the construction materials
Daily inspection and monitoring of site activities
Track, collect and assemble the paper work required for hand over
Design and enforce appropriate health and safety measures. Achievements
Delivered the Project on time and within budget meeting the standard specified.
Prepared simplified working drawings for the complex geometrical structures.
Prepared works schedules and monitor the work progress.
Instructed and guided the subcontractors, site supervisors by both oral and written media and regularly updated the project management about the work progress and remedial measures, if any including the actual and potential variations in site works with special regard to cost, time and quality of works YEAR COMPANY / GROUP
1993 to 2009 ARCOMA, Arabian Commercial Agency Co. Ltd, Saudi Arabia
Positions held. CHIEF ENGINEER for DESIGNING Cold- Formed Steel Structure & CONSTRUCTION
CONSULTANT FOR VARIOUS PROJECTS
Major Projects handled.
1. Project:
ARCOMA Head Office, Multi Storied (G+2 basement+10) Buildings, (Location: Old Makkah Road, Jeddah)
Client: ARCOMA, Arabian Commercial Agency Co. Ltd, Saudi Arabia Supervision and planning, scheduling, organizing and controlling of ongoing multi storied G+10 Buildings as well as two floors car parking basement, including commercial Building, residential Building the design also include internal infrastructure including utilities, drainage, Electrical, telephone lines, fresh water, waste water, landscaping (old Makkah Road).
2. Project:
a. Structural Design of Ware House - Yanbu Petrochemical Complex (YANPET), Royal Commission Yanbu
b. Structural Design of Warehouse – IBN HAYYAN Petrochemical Co., Royal Commission Yanbu.
c. Structural Design of Ware House – Abdul Aziz Airport Jeddah, Saudi Airlines Co. Client: ARCOMA, Arabian Commercial Agency Co. Ltd, Saudi Arabia Structural Engineering Static Design Manager for various company projects, calculations Design of structures such as:
a. Supervision Prefabrication and Shop drawing for steel construction project. b. Supervision Design and fabrication standards Drawings. c. Working on structural details drawing, section, and elevation with American, European, and local standards.
d. Supervision Weld design with varies steel thickness, detail Drawings. e. Supervision Designing girders, assembling & trusses sections Page 9 of 14
3. Project:
Development of Multi Storied (G+04) Buildings, (Location: Madinah Al Sinayah, Jeddah)
Client: ARCOMA, Arabian Commercial Agency Co. Ltd, Saudi Arabia Supervision and planning, scheduling, organizing and controlling with integration and Completion of G+04 Buildings, for company labors the design include fire alert alarm System, the design also include internal infrastructure including utilities, drainage, Electrical, telephone lines, fresh water, waste water, landscaping (Jeddah Manufacturer Area)
4. Project:
Project: Development of 5 Luxury Residential Villas (Location: Al Jamia Dist., Jeddah)
Client: ARCOMA, Arabian Commercial Agency Co. Ltd, Saudi Arabia Supervision for the Design of a Classical luxury 5 VILLAS as well as car parking basement for Shk.S.Bajamal at Al-Jamma’a Districted Jeddah the design Proposal consists of two floors with a basement, Soil Mechanic test by SACFOC is the first stage to start the design and constructions of the villas. The designs of the complexes include fire alarm system, internal infrastructure including utilities, drainage, Electrical, telephone lines, fresh water, waste water, landscaping and swimming pool.
Responsibilities & Achievements.
Plan, direct, coordinate, integrate and budget activities concerned with the construction and maintenance of structures, facilities, and systems in particular multi- storied (G+10) as well as two floors car parking basement, (G+04) commercial & residential buildings.
Participate in the conceptual development of a construction project.
Conducting the inspections of workmanship, materials used in the construction works on behalf of Jeddah municipality in compliance with international standards for all relevant RCC structures, stability of form works and scaffolding and arrangement of steel of epoxy coated conforming to ASTM-615, Grade 60.
Following up the project and related sites & sections of multi-storied to ensure that all assigned works are carried out as per priority, schedule, standards, technical specifications with departmental regulations as per consultant office drawings and survey works.
Keen observation on goal and objectives of multi-storied (G+10), establishing schedules and methods for construction inspections, implementation of policies and procedures.
Read and translate civil infrastructure drawing, design, specification, codes and regulations including laboratory and field test and report of construction materials as well as reviewing manufacturer certificate for approval of their product/materials including installation techniques and site workmanship standards along with monitoring day-to-day operations of inspection staff and assisting in the efficient planning, scheduling, prioritizing and implementation of site inspection and testing procedure.
Conducting bid clarification & kick-off meetings with contractors and Supervision and coordination with multiple contractors.
Managed budgets, cash flow, and accounting processes and submitted justifications for required construction tools & equipment including check & control of project spending and disbursement.
Reviewing and certification of payment certificates, quantity survey of works, analysis of claims, cost estimate, evaluation of new units rates, variation, reconciliation of Page 10 of 14
BOQs,
Carrying out responsibility of management aspects and project progress function by reviewing the plans, specification and contracts awarded to contractors, allocation of staff in different sections and assisting in the interpretation of project plans to perform assigned activities accordingly.
Preparation of Weekly and Monthly reports to top management on physical and financial progress of works.
Ensure maintenance of daily records of all site activities, including information on labor and plant, and any non-compliant materials or workmanship and checking payment certificate and test reports.
Identify problematic design issues and make recommendations that support engineering procedure as well as ensure the construction schedule is maintained.
Responsible for management of site team including personnel matters, staff training and development. Liaise with the Senior Construction Manager / Project Manager of Construction as appropriate.
Controlling the Ready mix concrete pouring (mass concreting). YEAR COMPANY / GROUP
1989 To 1993 ABDUL LATIF JAMEEL CO. LTD, SAUDI
ARABIA (Real Estate & Investment
Division, Jeddah, Makkah & Madinah Al-
Munawarra)
Positions held Owner Consultant Engineer & Adviser Major Projects Handled
Project Name: Development of Mixed Use Residential Project Owner: Abdul Latif Jameel Co. Ltd, Jeddah
o The size of lots and blocks and other areas for residential, commercial, and public uses. The designed to provide adequate light, air, open space, landscaping, and off-street parking and loading facilities. o The arrangements of lots and blocks and the street system designed to protect and to make the most advantageous use of topography and natural physical features.
o internal street construction
o provide a well structured road network based on a clear hierarchy of roads that provides a safe and efficient transport network that respects the character of Abdul Latif Jameel Co. Ltd residential properties
o internal infrastructure including utilities, drainage, Electrical, telephone lines, fresh water, waste water, landscaping
o Open Spaces and Reserves accessible for future residents, in addition reserves space for praying area (Mosque) and school if need it. o Interior Road Construction Bituminous, Consist of Sub grade thickness-250 mm, GSB thickness-250 mm, WMM thicknes-250 mm, DBM-100 mm, B.C. thickness- 50 mm.
Page 11 of 14
Project Name: Development of Residential Complex Owner: Abdul Latif Jameel Co. Ltd, Jeddah
o Managed infrastructure design and utility planning of a completely new mixed use project of 26 luxury classical town houses. Extensive liaison with developer and local authorities for establishing designs related to internal road network, Water storage, treatment & supply (WTS), Sewerage, waste water management. Scheme cost SAR 250 million.
o Supervision for the Designing of a Classical 26 town house the Proposal consists of one floors + mezzanine...
o The designs of each Classical town house include fire alert alarm system, internal infrastructures including utilities, drainage, Electrical, telephone lines, fresh water, waste water, landscaping and swimming pool. o Along with garden fences, and front Facades used a Concrete masonry units with stucco
Project Name: Development of Mixed Use Projects (Near to Alharam area in Makkah Al-Mukarrama, and Al-Madinah Al-Munawarra)
Owner: Abdul Latif Jameel Co. Ltd, Jeddah
o Engineering Assistants for ARHEUR D. LITTLE INTERNATIONAL INC., focusing to devolve Abdul Latif Jameel Co. Ltd properties and provides a valuable resource the company truly oversee and prepare to construct high rise apartments and hotels up to 15-floors as well as 03-floors car parking basement .
o The design stage base internal infrastructures including utilities (Structural, Hydraulic, Electrical, Fire Services, Acoustic, Environmental, landscaping and Water Irrigation) along with as following
Preparation Tender document
Negotiation and supervision consultants and contractors
Procurement of all professionals and contractors
Interior design, space planning and product assimilation
Development applications and associated planning submissions
Preparation of all strata documentation including plans, management arrangements, and budgets
Selection of finishes and specifications to meet the demand
The construction schedule set up in three phases. Responsibilities / Achievements:
Plan, direct, coordinate, integrate and budget activities concerned with the construction and maintenance of structures, facilities, and systems in particular Building.
Participate in the conceptual development of a construction project and oversee its organization, scheduling, and implementation.
Conducting the inspections of workmanship, materials used in the construction works on behalf of Turner Constructions in compliance with international standards for all relevant RCC structures.
Following up the project and related sites & sections to ensure that all assigned works are carried out as per priority, schedule, standards, and technical specifications.
Keen observation on goal and objectives of Building project, establishing schedules and methods for construction inspections, implementation of policies and procedures.
Read and translate civil infrastructure drawing, design, specification, codes and regulations including laboratory and field test and report of construction materials as well as reviewing manufacturer certificate for approval of their product/materials Page 12 of 14
including installation techniques and site workmanship standards along with monitoring day-to-day operations of inspection staff and assisting in the efficient planning, scheduling, prioritizing and implementation of site inspection and testing procedure.
Conducting bid clarification & kick-off meetings with contractors and Supervision and coordination with multiple contractors.
Managed budgets, cash flow, and accounting processes and submitted justifications for required construction tools & equipment including check & control of project spending and disbursement.
reviewing and certification of payment certificates, quantity survey of works, analysis of claims, cost estimate, evaluation of new units rates, variation, reconciliation of BOQs,
Carrying out responsibility of management aspects and project progress function by reviewing the plans, specification and contracts awarded to contractors, allocation of staff in different sections and assisting in the interpretation of project plans to perform assigned activities accordingly.
Preparation of Weekly and Monthly reports to senior management on physical and financial progress of works.
Ensure maintenance of daily records of all site activities, including information on labor and plant, and any non-compliant materials or workmanship and checking payment certificate and test reports.
Identify problematic design issues and make recommendations that support engineering procedure as well as ensure the construction schedule is maintained.
Responsible for management of site team including personnel matters, staff training and development. Liaise with the Senior Construction Manager / Project Manager of Construction as appropriate.
Inspection of deep foundations, pile foundations, steel cages of pile and steel arrangements of structure. Controlling the Ready mix concrete pouring (mass concreting).
YEAR COMPANY / GROUP
1987 To 1989 ATO, Arabian Construction Co. Ltd.
(Jeddah & Makkah, Saudi Arabia)
Positions held Site Engineer & Assistant Project Manager Major Projects Handled
1. Construction of 10, 6 & 4 floors Apartments for different clients in Makkah Saudi Arabia.
Supervision and planning, scheduling, organizing and controlling with integration and completion of 10, 6 & 4 floors Apartments, the design include fire alert alarm system, the design also include internal infrastructure including utilities, drainage, Electrical, telephone lines, fresh water, waist water, landscaping (Makkah Area) 2. Construction of High rise 13 floors HIGH RISE Hotel with 2Floors car parking basement in Makkah Saudi Arabia.
Supervision and planning, scheduling, organizing and controlling with integration and completion of 13 floors Hotel with 2Floors car parking basement the design include fire alert alarm system, the design also include internal infrastructure including utilities, drainage, Electrical, telephone lines, fresh water, waist water, landscaping (Makkah Area) Page 13 of 14
3. Construction of Palace for Shk, Al-Subae, Makkah, Saudi Arabia. Supervision for the Designing and construct of a Classical Palace the Proposal consists of three floors + mezzanine...
The designs of the Palace include fire alert alarm system; internal infrastructures including utilities, drainage, Electrical, telephone lines, fresh water, waist water, landscaping and swimming pool, and front Facades used Concrete masonry units with stucco.
Responsibilities / Achievements:
Review of detailed design, shop and as built drawings, calculations and engineering submittals for construct purpose from Consultants/Contractors.
Prepare concept, preliminary and detailed design (if needed) with technical specification, research studies, for award purpose.
Leads Value Management and Engineering workshops, challenging designs reviews quality, value and risk for the overall projects.
Ensuring designers are aware of, trained on and consistently using project processes & procedures, including design standards & procedures, design system and tools.
Ensuring designers are aware of, trained on and consistently using project processes & procedures, including design standards & procedures, design system and tools.
Managing technical and constructability reviews of deliverables. YEAR COMPANY / GROUP
1985 To 1987 Alay General Contracting, Jeddah, Saudi Arabia
Positions held: Site Engineer
Major Projects handled:
1. Completion No.2 Complexes Villas for Shk. Al-Attar, Jeddah, Saudi Arabia Site Engineer for No.2 Complexes VILLES the Proposal consists of two floors the designs of the complexes include fire alert alarm system, internal infrastructure including utilities, drainage, Electrical, telephone lines, fresh water, waist water, landscaping and swimming pool.
2. Completion of 6 floors apartment for Shk. Baglafe, Jeddah, Saudi Arabia. Site Engineer for 6 floors apartment the Proposal consists of two floors the designs of the apartment include fire alert alarm system, internal infrastructure