Austin industrial *-**-**** through *-**-****
Worked at Cliffside steam station on smartgen project which consisted of bending and cutting,threading conduit. Mounting j-boxes, also panel boxes. Pulling cables to all boxes and sensors. Wiring control wire to cards inside i/o cabinet.
UNIMECH MECHANICAL SERVICES 10/30/12 through 8/20/13 worked at 3 different power plants with them doing smartgen project. Same work as Austin due to unimech losing there contract. Amec/kamtech 1/10/12 through 10/27/12 installed high voltage cable buss. 150 ft in the air throughout buildings to transformer. Built stress cones and tested. Installed conduit for motors. Checkout on plc,s .INSTALLED LIGHTING ON CONVEYOR SYSTEMS. WIRED MOTORS, E-STOPS, LIMIT SWITCHES, PE,S ALSO.
UNIMECH MECHANICAL SERVICES 10/30/12 through 8/20/13
JOEL PAUL WHITE
144 angel lane Lexington n.c 27295 423-***-****
Industrial / Commercial Electrician
High Energy – Goal Directed
CAREER PROFILE
Twenty plus years as an Electrician
Excellent attendance record and stable work history.
Self-motivated, with a work history of superior performance.
Strong commitment to producing top-quality work through attention to detail, thorough planning,
and sound knowledge of the operations.
Capable of maintaining positive professional relationships that lead to better planning and higher quality.
Extremely broad experience with all kinds of electrical tools and materials
Responsible, dependable, punctual; take pride in my work
PROFESSIONAL EXPERIENCE
CROWDER CONSTRUCTION Ladysmith, VA 02/08 – 05/08
Old Dominion Power Plant
Industrial / Electrician
·Plc checkout, high voltage, terminations
·Duct Bank
·Two simple cycle units
AMEC/KAMTECH Franklin, GA 10/06 – 01/08
Industrial / Electrician Foreman
·Duct bank, setting manholes, new construction
·Cable bus insulation
AMEC/KAMTECH Cleveland, TN 09/05 – 07/06
Industrial / Electrician
·Terminations, Plc cabinets, DCS cabinets, MCC’s
·Start up and checkout
·
CCC Group, Inc. Chandler, NC 05/05 – 08/05
San Antonio, TX
Industrial / Electrician
·Paper Mill
·Performed work at Jacob Holmes Plant
·High Voltage Cables
Davis Electrical Constructors, Inc. Vineland, NJ 07/04 – 03/05
Industrial / Electrician
·Worked on General Mills Food Processing Plant
Electrical Staffing Chattanooga, TN 01/04 – 06/04
Indiana
Industrial / Commercial Electrician
·UTC in Chattanooga, TN
·Dormitories
·Duct bank, high voltage
IMI New Jersey 04/03 – 07/03
Industrial / Electrician
·Food Processing Plant
·Plc checkout, high voltage, terminations
·Long Layoff
Kamtech Dumfries, VA 02/03 - 04/03
Industrial / Electrician
·Opossum Point Power Plant
·Plc checkout, high voltage, terminations
Gilbert Southern Charlottesville, VA 09/02 – 02/03
Industrial / Electrician
·Fluvanna Generating Plant
·–Plc checkout, high voltage, terminations
Triad Electrical & Controls, Inc. Nashville, TN 07/02 – 08/02
Baton Rouge, LA
Industrial / Electrician
DuPont project in Tennessee
NEPCO Gilabend, AZ 02/02 – 05/02
Industrial / Electrician
Enron Company bought out by SNC Lavelain Power Plant
Run conduit
Pulled wire
Davis International Kingsport, TN 09/01 – 11/01
Greeneville, SC
Industrial / Electrician
Weyerhaeuser paper mill project
Run conduit and pull wire
Eldeco Atlanta, GA 04/01 – 09/01
Industrial Electrical Foreman
Georgia World Congress Center
Run conduit, worked in duct bank, and pull wire
Gulf States Monroe, NC 01/00 – 04/01
Electrical Foreman
Fiber Optics Plant
Run conduit, pull wire, terminations, transformers, stress cones, building hook up
Superior Electric Graniteville, SC 03/99 – 01/01
Industrial Electrician
Bridgestone / Firestone Tire Plant
Plc checkout, control wiring
Eldeco Graniteville, SC 07/98 – 03/99
Industrial Electrician
Bridgestone / Firestone Tire Plant
Plc checkout, control wiring, hookup
Eldeco Columbia, SC 01/98 – 07/98
Commercial Electrician
State House
Lighting, control wiring, security systems
Herbert / Yeargin St. Matthews, SC 07/97 – 01/98
Industrial Electrician
Carolina Eastman – Kodak Plant
Conduit, control wiring
Gregory Electric Blythewood, SC 12/96 – 07/97
Industrial Electrician
Bose Plant
Koyo Bearings Plant (05/95 – 12/96)
Conduit, control wiring
REFERENCES
Michael Zickafoose
625 7th St.
Bristol, TN 37620
Darrel Hornsby
330 Blue Horse Circle
Elgin, SC
Tim Riner
Kingsport, TN
Bob Carter
Jonesborough, TN
JOEL PAUL WHITE
637 7TH Street, Bristol, Tennessee 37620 423-***-****
Dear Hiring Professional:
This letter is in the interest of exploring employment opportunities with your company. Because I believe that I have the abilities, work ethic, experience and motivation you are looking for in an employee, I have enclosed my most recent resume for your review and consideration.
As highlighted in my resume, I have been employed as an Industrial / Commercial Electrician. Throughout my employment history I have developed excellent interpersonal, organizational and communication skills. I work well in a team atmosphere, as well as on an individual basis. I am presently seeking a stable career position where my skills and experience will be utilized, but also will allow me to contribute to the success of a company. I am a hardworking individual who is motivated by the knowledge that my earnings are directly related to the time, energy and effort that I commit to my position.
Thank you for your interest, time and consideration. I look forward to hearing from you in the near future.
Sincerely,
Joel Paul White
Encl. resume