Post Job Free

Resume

Sign in

Engineer Project

Location:
Coimbatore, Tamil Nadu, India
Posted:
July 07, 2020

Contact this candidate

Resume:

VENKAT RAMAN. S

Professional : Sr. Project / Planning Engineer

E-Mail: adeecl@r.postjobfree.com / adeecl@r.postjobfree.com Contact: +968-******** (Oman) / +91-770******* (India) NAME : Venkatraman S

DATE OF BIRTH : 29th Sep. 1984

NATIONALITY : Indian

QUALIFICATIONS : Bachelor of Engineering (Mechanical) from Annamalai University Chidambaram, Tamil Nadu (India) Passed out in May 2007 with 7.4/10 (OGPA) TRAINING /

TECHNICAL SKILLS

: Primavera P6 R8.2, MS project, & MS office.

ERP 7.2.1 (Oracle) & ERP SAP-01 Basics

STRENGTHS

AND

EXPERIENCE

: Total experience of 12.6 years.

Experience in FEED and EPC for upstream, onshore and refinery projects. Strong and effective leadership and coordination skills. Lead functional input to projects to ensure delivery is consistent and effective, meeting scope, time cost and quality requirements

Having strong report writing skills primavera p6 and MS office skills CAREER SUMMARY : Jul 2016 - Till date, Sr. Project Engineer, Sr. Planning Engineer; Arabian Industries Project LLC, (Client: Petroleum Development of Oman), Oman Jul 2013 - Dec 2015,Project Engineer & Planning Engineer; TOCO (Interserve),

(Client: Occidental of Oman), Oman

May 2011 - May 2013,Project Planning & Control Engineer; Special Technical Services & Tebodin LCC, (Client: Petroleum Development of Oman), Oman Sep 2008 - Apr 2011,Jr. Planning Engineer; M/s Galfar Engineering & Contracting Co. SAOG, (Client: Petroleum Development of Oman), Oman Aug 2007-Aug 2008, Jr. Planning Engineer; Sundaram Auto Components Ltd- Rubber Division (A group of TVS),India

SUMMARY OF

EXPERIENCE

: Preparation of ITT documents, coordination with various disciplines for their input and review.

Technical bid evaluation - identify people responsible for various activities within predetermined timelines, and a common understanding of the scope. Attend periodic progress review meetings with the project team and monitor progress of each activity, follow up, expediting etc. Compile response to clarifications and requests from contractors to the client and share client feedback in terms of scope, additional information etc. with the team and contractors.

Management of interface between different stake holders including arranging

/attending meetings, close out of interface agreements etc. Prepare project schedule and commissioning schedule. Prepare technical project execution plans, organization charts, job specific technical write ups, and response to technical qualifications to pre and post bid queries.

Review of project Schedule and cost estimates submitted along with bid by contractor

Follow-up with the cost estimators for vendor offers and obtain vendor responses for the technical clarifications raised. Ensure generation of all deliverables by Engineering Disciplines as per Bid requirement (BOQs, Technical Documents to be attached to Bid, costing for various equipment and bulks etc.). Shortlist and identify target vendors for various key equipment/ packages. Venkatraman S - Curriculum vitae Page 1/5

Venkatraman S Page 2/5

Prepare and compile a Risk Register wherein various risk elements of the project are listed and update the risk mitigation strategy for each risk element in consultation with Project Manager and discipline engineers In depth knowledge of SAP, ERP (Enterprise resource Planning), Schedule in Primavera and calculating the percentage progress with weighted value and factors of each activity

Write regular progress reports as required by the Site Manager Engineering activities like-

Review of P&IDs, piping and HSE layouts, etc.

Preparation of Project Procedures Plans etc.

Conversant with API and ASME std.

PHA, HAZOP, SIL Study and PHSER involvement and close-out activity DETAILS OF EXPERIENCE

JUL 2016 TO PRESENT : Company: Arabian Industries Project LLC AI Projects (AIP), the EPC project-Onshore, engineering, procurement, logistics and warehousing, fabrication, construction, and facilities commissioning. Worked as Sr. Project Engineer / Planning Engineer, Started as Sr. Planning Engineer and subsequently changed to Sr. Project Engineer. Project Experience

1. Mabrouk Gas Gathering and Conditioning Facility Construction, (PDO),Muscat, Oman - $ 51 Million

2. 10days project tie ins S/D in 2018

3. Construction services for Yibal Khuff Project (PDO), Muscat,Oman-$ 103 Million Major Responsibilities / Tasks

Bid evaluation, preparation of evaluation report, contractor’s evaluation matrix and ranking preparation.

Bid clarification meetings with bidders.

Participation in Interface Meetings

Prepare Interface Agreements

Compile documents for Interface Agreements

Engineering Document Control Register (EDCR) Material Procurement Tracking Register (MPTR) Construction

Performance management system MPMS

Value of Work Done (VOWD) Model and VOWD S- Curves. Participation in various project workshops like PHA, HAZOP, SIL, PHSER, design reviews, etc.

Deliverables review/approval and responding to technical queries from contractors.

Participation in different workshops like Design review, HAZOP, HAZID, ENVID, OHRA, Constructability review.

Participation in different workshops like WEFS, CSU Deliverables, CMS (Zenator), ITR MC-PC review.

Prepared System/Sub-system wise Pre-commissioning and Commissioning schedule Coordinating with Client and Contractor to ensure Client requirements are adequately fulfilled.

Coordinating between project discipline leads to support project-wide deliverables within the appropriate project schedule Capturing and communicating lessons learned for the project Ensuring constructability plans are in place and are being implemented. Coordination with construction works and engineering.

Venkatraman S Page 3/5

July 2013 to Dec 2015 : Company: TOCO-Interserve, Oman TOCO delivered Oman’s first pipeline, flow line, production station, tank farm and EPC of pipelines and construction of process plants Worked as Lead Planning Engineer / Project Engineer. Project Experience

1. Engineering Maintenance service contract (EMC) 3 Year awarded by OXY – $ 142 Million

2. 12” and 16” Oil Export pipeline and Various Flow line jobs 3. Safah and Wadi Latham 16” pipeline, Khamillah Stn, Enerflex Compressor project and ZAP Lock System - $ 21 Million

Major Responsibilities / Tasks

Assist in developing project schedule/ for biding strategy. Actively participate in the monthly project reviews, prepare action items list and follow up.

Review and finalize consultant/contractor plans.

Finalization of Project WBS, Weightages, and Baseline schedule for Original Scope of Works/additional scope which are received from client and get approval from client.

Maintains on records on progress manpower, equipment productivity utilization of contract variation and change orders

Perform project risk assessments on delays and disputes and determine possible range of completion dates for the project.

Establish realistic budget targets and monitor performance to ensure compliance. Analyzing all the Trend / Scope Change notices issuing by Client and giving the necessary Schedule impacts.

To carry out monthly budget performance review and variance analysis. Prepare monthly/quarterly/yearly progress reports.

Verifying the subcontractor invoice based on Invoice Procedure Preparing Base Line Schedule for New Projects and get approval from Client May 2011 to May 2013 : Company: Special Technical Services &Tebodin LCC, Oman STST, a Joint Venture between Special Technical Services LLC (STS) and Tebodin & Partner LLC has been awarded the Engineering and Maintenance Worked as Project Planning & Control Engineer

Project Experience

1. APO (Aquifers Pump off), MLM Remote manifold station, SNH Control upgrade system, demolition of GOGD/QAGS and integrity Jobs. 2. GG well testing and SNH Middle Graiff project and Brown Field jobs-SRL On-plot piping replacement

3. 48hrsSRL Integrated S/D is to maintain the Plant Integrity in May 2012 & March 2013 and 14days and 21days CPP Train-1 & Train-2 and BRK SD in April 2013 and Yearly Shutdown ALG/BHN/QALM

Major Responsibilities / Tasks

Analyzing and controlling of project cash flow, updating cash flow report and preparing S-curve & Histogram

Attending the Kick off Meetings for the new EPC Projects. Assisting EPC Planner for preparation of management reports / status report Venkatraman S Page 4/5

(ONE review report, Integrated Plan, project status & ERP reports) Analysing project resource requirement vs. actual and look ahead periodically for the clusters and highlighting to management.

Prepare JCR-Job Close out reports form ERP systems for the Stand alone engineering Jobs.

Generating monthly, weekly and daily reports, Preparing look ahead program for work and month

PDO’s 90D/14D plan and integrated activity plan to follow and communicate with team on time to complete the job.

SAP PR & PO creation, and follow with schedule to update SAP WBS Major & Minor SDs (ALG, GHN, OHL SD) activities Preparing Schedule, Resources

& equipment all requirements arrange on time.

Preparing L4 Plan, Risk mitigation, MS, Resources & equipment plan for SRL integrated SD follow up with milestone & IAP flag

Sep 2008 to Apr 2011 : Company: M/s Galfar Engineering & Contracting Co. SAOG, Oman Worked as Jr. Planning Engineer

Project Experience

1. EPCC-(Gas Sweetening unit),3rd Dehydration tank piping and structural, RMS - 11 and UFOQ RMS

2. Hydro Cyclone unit, RMS (Remote manifold station), New Gas Sweetening unit, 4th Fars Water injection and all type flow line.

Major Responsibilities / Tasks

Planning, Execution, monitoring & handling the project in new Gas Sweetening unit at Lakhwair (Oman)

Close follow up with Engineering, procurement & Construction and time to release project requirement.

Reporting and regular updating work activity progress of plans and schedule. Preparing L4 plan, Risk Matrix, Method Statement & resources list for Major SD

(duration 48hrs) at Lekhwair 2009

Coordinating to fulfill requirements and priorities of client and Shutdown execution team.

Timely follow-up / highlight with procurement team for enquiry and order placement.

Timely follow up all integrated issue and highlights to management. Preparing Schedule for the new manifold with gathering station and all off plot flow line jobs.

Progress tracking and corrective action to meet the target. AUG 2007 TO AUG

2008

: Company: Sundaram Auto Components Ltd-Rubber Division (A group of TVS), India, Worked as Jr. Planning Engineer

Major Responsibilities / Tasks

Work instruction and standards for production area has been produced. Progress monitoring and tracking the progress of production and preparation of production report.

Familiar and working experience on stages of projects through conceptual Quality.

Coordinating with all departments for effective running of production equipment.

Reporting the daily production and sales report to Management Venkatraman S Page 5/5

SAP -01 Basics/PS-05 organized by SAP Training UIS department at Shell-PDO Training Center. Job hazard analysis from Occupational Training Institute. H2S Awareness and Escape organized by OTI.

HSE tools & Skills and leadership organized by OTI. Date of birth : 29th September 1984

Gender : Male

Marital Status : Married

Languages Kwon : Tamil, English, Hindi & Arabic

Passport details : L7370170 (Expiry on 25th Feb 2024) Driving Lenience : Gulf (Oman) and India

Permanent Address : No.6B F1 Annaiparasakthinagar, NewLekshmipuram, Chennai, Tamil Nadu (India) I, hereby declare that all the information furnished above is true to my knowledge and I promise to work hard with sincerity and dedication in your esteem concern.

Location: Muscat, Oman Signature

Date: (Venkatraman. S)

Professional Training:

Personal Details:

Declaration:



Contact this candidate