Post Job Free

Resume

Sign in

Assistant Customer

Location:
Qibla, Kuwait City, Kuwait
Posted:
July 08, 2020

Contact this candidate

Resume:

* * * * *

*

ADDRESS FOR

CORRESPONDENCE:

*/***

Mealavandal street,

Veeracholan,

Virudhunagar dist,

Tamil Nadu,

India.

MOBILE NO: +965********

E-MAIL:

adee9y@r.postjobfree.com

PERSONAL PROFILE:

Date of Birth : 19.11.1992

Father : M.Ahamed Saleem

Mother : M.Ayisha Mariyam

Gender : Male

Nationality : Indian

Linguistic Abilities:

English

To Speak

To Read

To Write

Tamil

To Speak

To Read

To Write

Hindi

To Speak

Arabic

To Speak

NAME : A.MOHAMMED ASHIK

OBJECTIVE

To start a career in an esteemed organization, which would provide me with ample opportunities to prove; my skills there by bringing the best out of me that would aid the growth of the organization.

TECHNICAL EDUCATION QUALIFICATION: (Medium of Study – ENGLISH) SSLC Percentage

ASMA MATRICULATION SCHOOL, 70%

Veeracholan.

HSLC

KJEM HIGHER SECONDARY SCHOOL, 55%

Paramakudi.

B.E ( ECE.)

Mahath Amma institute of engineerging and technology, 65% Pudukkottai.

CERTIFICATION

Mastro-lee HVAC training certificate.

Certificate Of Participation In TENET TECHNETRONICS on AURDINO PLATFORM

Certificate on Participation Of one day Workshop on ENIITECH WORK EXPERIENCE

2 year Store Assistant as KGL Logistic in Kuwait. Technical Credits

WMS SOFTWARE

ERP

WS OFFICE.

2 P a g e

Field of Interest:

Document Controller

Accountant

System Administration

Strengths

Easily adjustable to any

environment.

A good team player with

positive attitude.

I am friendly and very

comfortable in work as a

group.

I am also a good motivator

work in a group.

Roles and Responsibilities:

Receiving the packing list and invoice documents from the customer side.

BEFORE OFFLOAD THE CONTAINER

•check and verify the container number

•check and verify the seal number from the container

•check physical condition on front of the container

•Find and check temperature monitor device of the container

•All records are taken then stored the system

.DURING RECEVINING

•check and verify the item number of products should be matched in packing list

•check the description of products

•check and verify the LOT NUMBER

•check and verify the expiry validate

•check Quantity of the products

•check Quality of the products

•check physical conditions of the cases then start receive processing

•LPN BIN number should be used on receiving the products easy to find and finally stored the material

•Temperature should be maintenance on everyday

• Damaged cases should be kept on separate storage’s

• After receiving all records send to customer including any issues. DELIVERY PROCESS

•Receive mail from customer requests

•Check items availability/status before replying to Customer request.

•Create Shipment in Wave Explorer, Run & Release Wave, Print Order Pick list and Delivery Note

•Cancellation of Released shipment can be done by Shipping Supervisors

•Do not release any damages without Customer's approval.

•Any items shipped out through a Manual Delivery Note or cross docked should received first in the system

and then shipped out from system by same date of the Manual Delivery

•Doing loading check the quantities,expiry and condition of products 2 P a g e

•After loading the material temperature monitor device should be kept on vehicle

•then properly locked and sealed

•All the reports should be properly checked before printing and send to customers.

PROJECT UNDERTAKEN:

TRAFFIC LIGHT CONTROLLER.

Integration software : Embedded C.

Hardware used : Microcontroller(AT89S52/AT89S51).

DECLARATION

I hereby declare that the above particulars given are true and faith to the best of my knowledge and belief.

REFERENCE:

Student of Mahath Amma institute of technology,

pudukkottai,

Place: Yours Sincerely,

Date: A.MOHAMMED ASHIK



Contact this candidate