ADDRESS FOR
CORRESPONDENCE:
Mealavandal street,
Veeracholan,
Virudhunagar dist,
Tamil Nadu,
India.
MOBILE NO: +965********
E-MAIL:
****************@*****.***
PERSONAL PROFILE:
Date of Birth : 19.11.1992
Father : M.Ahamed Saleem
Mother : M.Ayisha Mariyam
Gender : Male
Nationality : Indian
Linguistic Abilities:
English
To Speak
To Read
To Write
Tamil
To Speak
To Read
To Write
Hindi
To Speak
Arabic
To Speak
NAME : A.MOHAMMED ASHIK
OBJECTIVE
To start a career in an esteemed organization, which would provide me with ample opportunities to prove; my skills there by bringing the best out of me that would aid the growth of the organization.
TECHNICAL EDUCATION QUALIFICATION: (Medium of Study – ENGLISH) SSLC Percentage
ASMA MATRICULATION SCHOOL, 70%
Veeracholan.
HSLC
KJEM HIGHER SECONDARY SCHOOL, 55%
Paramakudi.
B.E ( ECE.)
Mahath Amma institute of engineerging and technology, 65% Pudukkottai.
CERTIFICATION
Mastro-lee HVAC training certificate.
Certificate Of Participation In TENET TECHNETRONICS on AURDINO PLATFORM
Certificate on Participation Of one day Workshop on ENIITECH WORK EXPERIENCE
2 year Store Assistant as KGL Logistic in Kuwait. Technical Credits
WMS SOFTWARE
ERP
WS OFFICE.
2 P a g e
Field of Interest:
Document Controller
Accountant
System Administration
Strengths
Easily adjustable to any
environment.
A good team player with
positive attitude.
I am friendly and very
comfortable in work as a
group.
I am also a good motivator
work in a group.
Roles and Responsibilities:
Receiving the packing list and invoice documents from the customer side.
BEFORE OFFLOAD THE CONTAINER
•check and verify the container number
•check and verify the seal number from the container
•check physical condition on front of the container
•Find and check temperature monitor device of the container
•All records are taken then stored the system
.DURING RECEVINING
•check and verify the item number of products should be matched in packing list
•check the description of products
•check and verify the LOT NUMBER
•check and verify the expiry validate
•check Quantity of the products
•check Quality of the products
•check physical conditions of the cases then start receive processing
•LPN BIN number should be used on receiving the products easy to find and finally stored the material
•Temperature should be maintenance on everyday
• Damaged cases should be kept on separate storage’s
• After receiving all records send to customer including any issues. DELIVERY PROCESS
•Receive mail from customer requests
•Check items availability/status before replying to Customer request.
•Create Shipment in Wave Explorer, Run & Release Wave, Print Order Pick list and Delivery Note
•Cancellation of Released shipment can be done by Shipping Supervisors
•Do not release any damages without Customer's approval.
•Any items shipped out through a Manual Delivery Note or cross docked should received first in the system
and then shipped out from system by same date of the Manual Delivery
•Doing loading check the quantities,expiry and condition of products 2 P a g e
•After loading the material temperature monitor device should be kept on vehicle
•then properly locked and sealed
•All the reports should be properly checked before printing and send to customers.
PROJECT UNDERTAKEN:
TRAFFIC LIGHT CONTROLLER.
Integration software : Embedded C.
Hardware used : Microcontroller(AT89S52/AT89S51).
DECLARATION
I hereby declare that the above particulars given are true and faith to the best of my knowledge and belief.
REFERENCE:
Student of Mahath Amma institute of technology,
pudukkottai,
Place: Yours Sincerely,
Date: A.MOHAMMED ASHIK