Post Job Free

Resume

Sign in

Senior Piping Mechanical Engineer

Location:
Fereej Ibn Dirhem, Qatar
Posted:
July 07, 2020

Contact this candidate

Resume:

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 1 of 14

YOHANES WAHYUDI

PERSONAL DATA

Date&Place of birth : 10 January 1974, Yogyakarta (Indonesia) Gender : Male

Marital Status : Married

Nationality : Indonesian

Passport no : A9255127

Current Address : Al Khor Community Villa B126 Street Number 26, Alkhor - Qatar Permanent Address : Perumahan Ciceri Permai

Jalan Tarumanegara 1 Blok C4 No.25 Sumur Pecung

Serang

LinkedIn ID : https://www.linkedin.com/in/ywahyudi/ QUALIFICATION:

SENIOR PIPING MECHANICAL ENGINEER

Education Background

Bachelor Degree of Mechanical Engineering

Gadjah Mada University, (UGM) Yogyakarta. Graduated on year 1998 Language Skill

Bahasa Indonesia, English

SUMMARY OF 20 YEARS PROFESSIONAL EXPERIENCE

1. Started career as Piping Engineer in year 2000. Involved in some project stages such as Conceptual/Pre-FEED study, Front End Engineering Design (FEED), and Detailed engineering design

(for EPCC & EPCIC) inclusive preparation of ITB (scope of work) & technical bid evaluation/clarification. Further execution of the first project covering Greenfield and Brownfield project type for oil & gas (offshore & onshore)..

2. Second phase of my experience is Senior Piping Stress Engineer to stewards the Piping stress engineering team to review the piping analysis reports, develop the piping stress design basis & perform study for piping vibration due to induced fatigue. 3. Start in 2009 joined with Qatargas for LNG Mega Train Project which exposed to multinational working environmental and multi disciplines interface. Experienced to work as Project Management Team (PMT) for LNG Mega Train Projects with job responsibility as follows: a) Participated in Transition Period/Handover of Mega Train Project/QG2 and QG 3&4 Facility to Asset Operation.

b) Review and approval the Contractor piping deliverables to ensure meeting the project’s requirement.

c) Project interfaces management/activity (e.g. interfaces coordination with other Disciplines, Operations team, Construction/Installation team).

4. Move to Project and Facility Engineering Support Department and post merger Qatargas and Rasgas become Static Engineering Department, this organization under Qatargas Operating Company, with job responsibility as follows:

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 2 of 14

YOHANES WAHYUDI

a) Provide Technical support from Engineering point of view for Piping issue to all Qatargas Assets include Offshore Facilities, Onshore LNG Trains Facilities, Laffan Refinery Asset and Ras Laffan Terminal Operations (RLTO) Asset.

b) Participating in Root Cause Failure Analysis (RCFA) c) Participating in FRA (Formal Risk Assessment) meeting and providing input regarding Safety issue from Piping point of view.

d) Preparing the Feasibility Reports thru MOC (Management of Change) to all QG assets. e) Post merger Qatargas and Rasgas, there is new system QGPMS (Qatargas Project Management System) related modification to the existing facilities, this include Gate 1 and Gate 2. Inside Gate 1 and 2 package there are deliverables documents that must generated from this phase such as Scope of Work, Project Execution Plan, Project Design Memorandum, Brownfield Toolkit verifications. 5. Having experience and knowledge to use international codes and standards Like ASME B31.1, B31.3, B31.4, B31.8, B16.5, B16.47, B16.9, B16.10, B16.34 etc, API 600, 602,594,598,5L,6D,6FA,609,520,521etc NACE MR 0175(ISO15156), and ASTM codes. 6. Computer literate skill for piping analyses and design software (Auto Pipe, Caesar Stress Analysis, 3D Naviswork and, AutoCAD).

7. Trained for HSE (H2S Breathing Apparatus, PTW, Defensive Driving, Risk Assessment Screening Level 2)

HIGHLIGHT OF VALUE CREATION ACHIEVEMENT

1. Piping modification related to Process Safety Incident Effort: In June 2010, there was Steam Header Incident in Train 4 QG2 working in 12 hours job, collaboration with Integrity team to review and assess the pipe Support condition and give recommendation on high priority basis. As a Engineering coordinator for modification on existing 44” Steam Header Pipe Support, working together with Contractor for rectify the damage. Result: Faster completion and Plant can running normal ahead schedule. 2. Cost and schedule optimization for replacing discharge line instrument air compressor Effort: Engineering contractor has designed new pipe routing based on their study, however the main issue is vibration, internal study had been conducted and the proposed solution is modify pipe support configuration

Result: Faster completion and cost can be lower than new pipe routing. 3. Cost optimization for the utility piping modification work. Effort: Validated the stress analysis model used for piping according to applicable code & standard. Result: Un-necessary modification on some piping that proposed by contractor are avoided since the existing supports are obtained able to withstand the design load. DETAIL OF PROFESSIONAL EXPERIENCE

QATARGAS (March 2009 – June 2020)

Position : Piping Engineer (March 2009 – March 2017), Senior Piping Engineer (April 2017 – June 2020), working under Project and Facility Engineering Support Department, and post merger Qatargas and Rasgas become Static Engineering Department Job Task :

a) Provide Technical support for Piping and Mechanical issue to all Qatargas Assets include Offshore

(Wellhead Platform and Processing) Facilities, Onshore LNG Trains Facilities, Laffan Refinery Asset and Ras Laffan Terminal Operations (RLTO) asset., Technical Support is solution from piping engineering to solve the problem related with Piping and Mechanical static issue, this request it can come from Inspection, Maintenance, Operation, Reliability, QA/QC and Other Discipline Engineering. The most common problem is Vibration, Material, Leakage, Piping Stress, Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 3 of 14

YOHANES WAHYUDI

Technical Bid Evaluation, etc during 11 years worked in QG handle more than 400 Technical Supports to all Assets in Qatargas.

b) Preparing the feasibility study reports thru MOCs (Management of Change) received from Operations & Maintenance and Inspection departments. This is Technical Request to provide Official modification report, Input from this report is Engineering recommendation with include Cost Estimation, Drawing and Documents modification as per QG Standard. Proposed modification can be done by Maintenance thru Work Order or by Project Department, during 11 years worked in QG handle more than 300 MOCs

c) Participating in Root Cause Failure Analysis (RCFA) meetings regarding any failures occurred in Piping and Mechanical Static in all assets. During that time handle more than 20 RCFA to All Assets

d) Participating in Formal Risk Assessment (FRA), attending formal risk assessments meeting and providing input from Piping point of view.

e) Post merger Qatargas and Rasgas, there is new system QGPMS (Qatargas Project Management System) related modification to the existing facilities, this include Gate 1 and Gate 2. Inside Gate 1 and 2 package there are deliverables documents that must generated from this phase such as Scope of Work, Project Execution Plan, Project Design Memorandum, Brownfield Toolkit verifications. PT. KBR INDONESIA (July 2005 – February 2009)

PROJECT : NORTH RANKINE OFFSHORE DEVELOPMENT PROJECT, Client Woodside Energy Ltd,

Position : Senior Piping Stress Engineer

Job task:

a) Perform piping stress analysis and miscellaneous item calculation using Caesar II. b) Check and evaluates loads on Mechanical Equipment Static and Rotating as per project specification requirements.

c) Prepare Stress Analysis report for specific material such as GRP and Copper Nickel Material d) Review detail engineering drawings and shop/fabrication drawings. e) Communicate direct discussion with engineering design’s third party to obtain the certification/assurance of engineering design result. PROJECT : PETROCHEMICAL PLANT, Client : Saudi Kayan Basic Industries (SABIC), Al Jubail, Saudi Arabia,

Project for Petrochemical Plant. This Plant will produce Ethylene, Propylene and Benzene with capacity 1350 KTA. The value of Project is $2.8 Billion. Position : Senior Piping Stress Engineer

Job task:

a) Perform piping stress analysis and miscellaneous item calculation using Caesar II. b) Check and evaluates loads on Mechanical Equipment Static and Rotating as per project specification requirements.

c) Review detail engineering drawings and shop/fabrication drawings d) Update Pipe Support on Piping Routing as per stress analysis results using PSUP software to give loading data to other discipline

e) Check of Piping Isometric for lines subject to Acoustic Induced Vibration and Flow Induced Vibration PROJECT : LNG TANGGUH PROJECT with consortium of KBR - JGC – Pertafenikki, Client

: BP Berau Ltd

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 4 of 14

YOHANES WAHYUDI

Project for LNG Plant from Grass Root Area to Modern Facility LNG Plant. The LNG Plant consists of 2 Train with Capacity 3.8 MTPA per Train. The value of Project is $1.8 Billion. Position : Senior Piping Stress Engineer

Job task:

a) Perform piping stress analysis and miscellaneous item calculation using Caesar II. b) Check and evaluates loads on Mechanical Equipment Static and Rotating as per project specification requirements.

c) Review detail engineering drawings and shop/fabrication drawings d) Update Pipe Support on Piping Routing as per stress analysis results using PSUP software to give loading data to other discipline

e) Check of Piping Isometric for lines subject to Acoustic Induced Vibration and Flow Induced Vibration PT. CABOT INDONESIA (May 2004 – February 2005)

Project: Feedstock Pipeline Project

New Feedstock Onshore Pipeline Project, this project is for pipeline transfer facilities including 20” pipeline 8 km from Cigading Port to Cilegon Plant, 2 booster twin screw pump, 1 Recovery Pond Pump, Tie In with existing pipeline, Feedstock Storage tanks modification, Pigging facilities, Utility facilities and Unloading facilities. Position : Project Engineer

a) Supporting Project Manager in the Engineering phase as well as Field Execution Works phase related to this project.

b) Review technical document from FEED phase until Detail Engineering phase include Basic Engineering Design, Project Execution Plan, Project Scope and HAZOP (Hazard Operability), SHE Management.

c) Review and Approval of engineering documents including calculation, drawing, specification, data sheet, Technical Bid Evaluation and Material Take Off for Engineering, Procurement and Construction.

d) As a Company Representative to monitor Contractor in order to reach high quality, safety and completion project accorded with contract project. PT. Transmega Eka Cipta Corp. (JV with PT. Sofresid Indonesia) (February 2003 – March 2004)

Project : Engineering Procurement & Construction (EPC) for Tunu Phase 9 EPSC 1, Client : Total Indonesia

Position as Piping Stress and Field Engineer

a) Prepare Pipe Stress Analysis Report using Caesar version 4.4. b) Check and evaluates loads on Pressure Vessel nozzle as per project specification requirements. c) Update Design Lay Out and Pipe Support design as per stress analysis results d) Performs site checking of piping system, type of pipe support that will be installed and location in conformance with project construction drawing requirement, design instruction and installation procedures.

PT. Tripatra Engineers & Constructors, Jakarta, Indonesia (January 2000 – January 2003) Project : Engineering, Procurement & Construction (EPC) for Several Project, like : South Jambi “B” Shallow Gas Project,, Engineering, Procurement & Construction (EPC) for Duri Steam Flood Project Area 11

Position as Piping Engineer

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 5 of 14

YOHANES WAHYUDI

Tripatra was awarded the detail engineering of several EPC project comprising of installation of new field production facility including the new receivers/manifolds, process trains, crude oil storage tanks, booster/export pumps, produced water treatment facility. a) Worked as a piping engineer involved in the preparation of piping specifications, datasheets for valves/piping special items, material requisitions & technical bid evaluations. b) Involved in the vendor documents reviews related to mechanical, instruments, package & piping vendors. Involved in meetings with vendors through telephonic meeting & direct face to face meetings at vendor facilities.

c) Involved preparation of plot plan & equipment layouts. Involved in checking of PDS model, isometrics & piping general arrangements extracted from PDS model. TRAINING EXPERIENCE

• Training Certificate from Exxonmobil, Oil and Gas Technology - November 2016

• Training Certificate from EquipGlobal Singapore, Pipe Stress Analysis for Floating Unit – April 2015

• Training Certificate G4 LNG (Gas Processing Technology) from Petroskills – December 2014

• Training Certificate Intergraph Webinar Stress Analysis – May 2011

• Training Certificate from Hayward Technology, Valve Technology – April 2011

• Training Certificate from Hayward Technology, Piping Pipeline Design Construction and Inspection – October 2010

• Training Certificate from Hayward Technology, Piping Vibration Analysis – September 2010

• Training Certificate from Coade, Piping Stress Analysis using Caesar 2 – May 2009 Please find next pages, work certificate from Qatargas and Training Certificates Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 6 of 14

YOHANES WAHYUDI

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 7 of 14

YOHANES WAHYUDI

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 8 of 14

YOHANES WAHYUDI

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 9 of 14

YOHANES WAHYUDI

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 10 of 14

YOHANES WAHYUDI

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 11 of 14

YOHANES WAHYUDI

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 12 of 14

YOHANES WAHYUDI

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 13 of 14

YOHANES WAHYUDI

Email: adedzn@r.postjobfree.com

Mobile phone: +974-********

Page 14 of 14

YOHANES WAHYUDI



Contact this candidate