ABDUL RAHEEM

**-**/**/*.

Secunderabad (Moula Ali)

Pin#:500040.

Cell:-+91-958*******/ 628*******

E-Mail: *************@*****.***

Career Objective

To work in a challenging environment where I can noticeably contribute for the organizational success and experience personal growth. Put cent percent efforts in the task I take and emerge as a winner.

SUMMARY

Project Engineering in Fire Fighting Srinklers system./ Deluge system/Fire Suppression System(Novec-1230 Clean Agent)/FM-200 Suppression system/Fire Water Pumps.(CLARK/DEUZE)/Fire Water Vertical/Horizontal Tanks (Fiber glass) Installations./Annual Maintenance For Fire Fighting Apparatus’s per NFPA strandeds.

Kitchen hood Wet Chemical Fire suppression system (Bukey/ANSUL/Pirana)

Monitoring Workshop Activity In Daily Progress Report As per Site Requriment For FABRICATION/WELDING/D.P.T/NDT/Hydraulics testing Works

Preparing Welding summary sheets as per the Project Requirement.

Preparing Quotations based on the site visit with client/Drawings.And Bill of quantity (B.O.Q) Preparing scheduling for the new projects And completing the projects with the time Frame of scheduling. If any flaws in the Drawing /Additional Site Requirement if Required Preparation of Additional change Order.

Working knowledge in AUTO-CAD and Numerical control Machine (N.C)

Willingness to learn.

Energetic and self-motivated.

Ability to work well in a team based environment.

Detail oriented with strong organizational and communication skills.

Great team player with ability to work.

Educational Qualification

Bachelor Degree in Mechanical Engineering – B-Tech from C.M.R College Of Engineering & Technology ( C.E.T) Affiliate To JNTU University, Hyderabad with 62.14%in the year 2009.

Diploma in Automobile Engineering – from S.G.M Polytechnic College with 67.37%in the year 2006.

All India Secondary School Examination – from Vidya Niketan High School with

65%in the year 2003

Technical Skills

Package : MS Office

Operating Skills : Windows Operating Systems

Typing : Medium

AutoCAD : Drafting and Designing

WORK EXPERIENCE

. Completed a apprentice training in HINDUSTAN AERONOTICAL LTD(AVIONIC DIVISION). At Hyderabad.(PLANNING DEPARTMENT).

VAT SON FOAMS (INDIA) PVT LTD. As a PRODUCTION ENGINEER (Manufacturing company) 1st jan 2009. To 2010.

1.SANDWICH PANEL Using For Clean And Dust Free Rooms.Application In Medical Insdustries Our Client is (Shanta Bio Tech.India Over.Ltd. in Hyderabad)

2.FOAM PANELS Using For Cold storages Rooms. Application in various Beverages company our major client is (Pepsico India Pvt.Ltd.company all over the india)

3.ROCKWOOL PANELS/FIRE RATED FM PANELS:Using For Sound Proof & Clean Rooms.Application In various Production Areas Our Major Client is Beverages Company (Pepsico India Pvt.Ltd.)

4.Manufracturing of a corrugated Roofing Profile sheets For new Construction of Sheds.

Completed a B-Tech Final Year project work in Tecumseh Product India Private Ltd. (manufacturing) In assemble section and study the major defects in compressor.

Working in AL-REZAIZA TRADE AND TECHNICAL SERVICES

EST.(DAMMAM) since April 2011 .Working as a Site project Engineer,& Quality Control. In Fire Fighting Sprinkler System 9-years 2-months experience as project engineer for fire protection system engineer and plant maintenance with “AL-REZAIZA TRAD.& TECH.SERVICES” In the field of design,supply,installation,testing & commissioning of fire fighting system and water supply system in the industrial complexes (SABIC-JUBAIL,PROCTER & GAMBLE (P&G),ARAB STEEL,ZAMIL PLASTIC IND.,ARNON PLASTIC IND.,)

DESIGNATION: Mechanical Project Engineer & Quality Control,

In Fire Fighting Sprinkler System. Deluge system,NOVAC 1230 Gass System.

Production Engineer In Vat son Foams (India) Pvt Ltd. (Manufacturing) Of Sandwich Panels. & Rock Wool Panel.

NATURE OF WORK

1.*Maintaining of machinery in periodic time to time (i.e.) numerical control machine (N.C)

2.Handling planning, scheduling, and dispatch of a materials

3.Solving the problems during production line

4.Check the quality and quantity of a product during production line

Supervising with worker and giving training to unskilled worker

5.Maintaining of stock in a factory

6.minimizing the wastage of material during the production

PRESENT RESPONSIBILITIES

1. Preparing site schedule & minutes of meeting

2. Completing the site as per schedule on time.

3. Preparing the daily progress reports & mark up on the drawings

4.Monitoring the Work Areas.And Solving the Problems During Executions/Fabrications As per the Strandeds.Codes.

5.Preparing Quotations And Materials Bill Of Quantity

MAJOR JOBS COMPLETED IN SAUDI ARABIA

1.Completed firefighting sprinkler system in D.C Phase –I ; D.C PHASE-II (PROCTER & GAMBLE)in 2011(Total number of sprinklers In D.C phase – I ;2500 ea.) and (Total number of sprinklers in D.C-phase II 2750 ea.) one of the largest kind of Fire Fighting system in the region.in 2011-2013

2..Completed fire fighting sprinkler system in (Zamil Plastic Industries,Alphla Plant) in march 2013 (Total numbers of sprinklers 550 ea).

3.completed fire fighting sprinklers system in (arnon plastic industries ltd.) (total number of sprinklers is 500 ea) in 2013

4. completed fire fighting sprinklers system in sab-tank SABIC jubail (total number of sprinklers 260 ea) At birth 28 urea handling Terminal. 2013

5.completed fire fighting sprinklers system (total numbers of sprinklers 550 ea) at procter & gamble industries ltd (P&G)expansion paking area.-2014

6.completed fire fighting sprinklers system (total numbers of sprinklers 700 ea ) Procter & gamble industries (P&G) expansion MZ warehouse & SA warehouse.-2014

7.completed fire fighting deluge nozzels and sprinklers system (total numbers of sprinklers 650 ea) in SABIC petrokemya project as a project engineer in april-5 2015

8.completed fire fighting sprinkler system in win-pack-phase-I and phase-II at Procter & gamble industries (P&G) total number of sprinklers installation qty=250ea.-aprl-2017

9. completed modification of sprinklers system in modern industries (P&G) ULF-plat form expansion / month of May-2017

10.Maintenance work on firefighting diesel pump German made (DEUTZ/ENGINE) at (P&G)-month of june-2017 as per NFPA standard.

11. Completed project fire water sprinkler system in Procter & gamble Dammam plant win pack-area / M.S.G dumping station / fire water diesel engine maintenance work./ MRA ware house modification of sprinkler system in the month of January -June -2018.

12. Completed project fire suppression system (NOVEC1230) in Admin Building Data Center room Procter & gamble Dammam plant in the month of August 2019

Previous Experience

1.Completed apprentice training in HINDUSTAN AERONOTICAL LTD (AVIONIC DIVISION). At Hyderabad.

2. Giving training to student and employee in AUTO- CAD DESINING

3. Two year Experience in VAT SON FOAMS (INDIA) PVT LTD. As a PRODUCTION ENGINEER (Manufacturing company) 1st July 2009. To 2011.

Professional STRENGTHS

Ability and desire to learn a new subject with in a short span of time.

Ability to work in shift basis

Ability to match the quality and quantity standards of the Organization.

Personal Profile

Full Name : M.A Raheem

Father’s Name : M.A Malik

Age & Date of Birth : 11th Nov 1985

Marital Status : married

Languages Known : English, Urdu, Hindi,

Hobbies : playing Cricket and Basket

Pass port : P7146685

DATE: (M.A Raheem)