TYLER LANDRY
***** *** **. ********** **, ****** · 337-***-****
**************@*****.*** · linkedin.com/in/TylerLandrNSE Extremely ambitious business professional leveraging strong leadership and communication skills to see projects through to their completion with great outcomes.
EDUCATION
PMP – (TESTING)
PROJECT MANAGEMENT INSTITUTE PMI
MBA – PROJECT MANAGEMENT
LOUISIANA STATE UNIVERSITY - SHREVEPORT
B.S. – MANAGEMENT
MCNEESE STATE UNIVERSITY- LAKE CHARLES, LOUISIANA
GREEN BELT SIX SIGMA
IASSC
PRIMAVERA P6 – INTRO TO P6
TURNER INDUSTRIES
CSST
NCCER
EXPERIENCE
JANUARY 2020-PRESENT
PLANNER
TURNER INDUSTRIES - SWS
DOW PLAQUEMINE
• Conducted work scope validation as well as potential timetable and cost.
• Created material take-offs, orders, and staging.
• Communicated fabrication priorities with production request from client (DOW).
• Conducted new scope walk downs and assisted with sketching.
• Designed piping systems to complete turnaround system requirements. SEPTEMBER 2019-JANUARY 2020
QUALITY CONTROL LEAD COORDINATOR
TURNER INDUSTRIES
SASOL MEGA PROJECT LCCP
• Supervising inspection operations of two new ethylene units.
• Given responsibility to track unit construction progress and communicate with superintendents to close out systems.
• Ensuring priorities are inline, and deadlines are met.
• Closing gaps on RFI, CSI, and engineering issues which are system associated.
• Ensuring dossier compliance for turnover books.
2
MAY 2019-SEPTEMBER 2019
PROJECT CONTROLS MANAGER
EXCEL CONTRACTORS
• Resource planning. Ensuring all materials are planned for, ordered, and onsite as necessary.
• Created estimates for additional work scope as well as new contracts.
• Managed relationships with clients, vendors, as well as field personnel in operations.
• Ensured operations was working within budget, and not experiencing excessive cost.
• Proposing solutions to cost burdens. Driving increased margins.
• Quarterbacking a more profitable company through operations excellence, less waste, and a better client relationship.
FEBURARY 2019-MAY 2019
TESTING/TURNOVER COORDINATOR
APTIM
• Designed hydro-testing packages.
• Established timetable to finish full systems turnover on schedule.
• Effectively communicated with inspectors to coordinate system mechanical check offs.
• Established on-going goals for project package completion, as well as system turnover status.
APRIL 2017-FEBURARY 2019
FIELD ENGINEER
TURNER INDUSTRIES
• Work hand in hand with supervision to generate RFI’s, & CSI’s in accordance with work.
• Direct liaison with Fluor engineering upon discovery of engineering issues.
• Represent site QC in “War Room” meetings with client/owner representatives for the project.
• Report analytics directly to Sr. Project Management on project status. FEBURARY 2016-APRIL2017
SYSTEMS TURNOVER
TURNER INDUSTRIES
• Design timetable for package generation, and hydro testing plan.
• Track progress to ensure timely completion with schedule.
• Monitor cost impacts affecting schedule and client expectations.
• Utilized advanced Microsoft Excel capabilities to ensure all engineered drawings of the 250,000+ were accounted for and properly inspected according to site standards. FEBURARY 2016-APRIL 2017
ACCOUNT MANAGER
DMC – DIVERSIFIED MATERIALS & CONSULTING
• Maintained ongoing relationships with existing accounts while pursuing new business opportunities.
• Exceeded quarterly goals consistently set forward by upper management. 3
• Displayed ability to counter opposition with value and drive account growth. DECEMBER 2015-FEB 2016
HSE OUTAGE COORDINATOR
CHENIERE LNG – TRAIN 1
• Helped establish critical path methods to mitigate unnecessary steps with rework.
• Established foundation for possible hazard with controlled mitigation strategy.
• Delivered safety briefing prior to critical vessel entry and line break. NOVEMBER 2014-DECEMBER 2015
HSE COORDINATOR
PERFORMANCE CONTRACTORS – WESTLAKE CHEMICAL LLC
• Conducted incident investigations. Generated onsite safety as well as company safety reports.
• Created steps and procedures to mitigate risk where applicable, while assisting site manager of safety in developing proactive safety practices.
• Constructed all new hire orientations, onsite training classes, as well as training matrices with expiring training certificate dates.
• Oversaw field activity site wide.
June 2009- July 2013
PROJECT MANAGER
LARRY LANDRY CARPENTRY
• Coordinate internal resources and third parties/vendors for the flawless execution of projects.
• Ensure that all projects are delivered on-time, within scope and within budget.
• Assist in the definition of project scope and objectives, involving all relevant stakeholders and ensuring technical feasibility.
• Ensure resource availability and allocation.
• Develop a detailed project plan to monitor and track progress.
• Manage changes to the project scope, project schedule and project costs using appropriate verification techniques.
• Measure project performance using appropriate tools and techniques.
• Report and escalate to management as needed.