RESUME
PERSONAL DETAIL
Name Siddesh Sunil Devlekar
Date Of Birth 06/11/1993
Address ***, **- ****, *** ****, Navghar road, Bhayander East, Thane-401105
Contact No. +91-845*******
Email-Id ********.*****@*****.***
Sex Male
Nationality Indian
Religion Hindu
Material Status Single
Educational Qualification H.S.C. Passed
Diploma in electronic technology
Objective
To obtain a position that will allow me to utilize my technical skills, experience and willingness to learn in making an organization successful. PERSONAL DOCUMENT
Documents No Issued date Validity Issued at
PASSPORT S 3751228 21/09/2018 20/09/2028 MUMBAI
INDOS 18AL7426 26/09/2018 - MUMBAI
COURSES
Course Certificate No Issued Date Issued At
PST MMTI/BSST/475/2018 20/10/2018 MUMBAI
PSSR MMTI/BSST/475/2018 20/10/2018 MUMBAI
FPFF MMTI/BSST/475/2018 20/10/2018 MUMBAI
EFA MMTI/BSST/475/2018 20/10/2018 MUMBAI
STSDSD MMTI/STSDSD/6715/2018 23/01/2018 MUMBAI
Experience
GALLAXY IEC INDIA PVT LTD (THE EARTH CENTER) As a Trainee Electrical Engineer from May to October.
ADANI WILMAR OIL PROJECT; In Surat -Hazira for 6th month. PROJECT; Three Substations, refinery, warehouse.
Substation –ABB; LT planes & HT planes
2.5kV to 3kV three phase transformers.
300 to 2.5mm LT & HT cables.
ABB three phase VFD (variable frequency drive) 0.25kw to 55kw. Also Profibus & Profinet is an industrial Ethernet cables.
Ladder type cable tray 80mm to 400mm and SS (stainless steel) cable tie.
Safety rules and regulations.
Main disputation board like MPDP (Main Power disputation panels) and LSDP
(Light substation disputation panels) supplies to junction box and also 2.5kV to 3kV range.
Tools and equipment’s.
My role-
Connections, terminations, testing and electrical bulk panel’s minor and major equipment’s.
Management reporting, management updating for project developing by suitable tracking tools and materials.
Monitoring substation by cable schedule and arranging work to the worker and supervising the substation area.
VFD connection, termination Ethernet adapter module and installations. Refinery –three phase Motors
0.2kW to 55kW motors.
Star to delta connection and direct connection to also type of pumps, agitators and vibratators.
Motor testing after termination for 72hrs as per Adani wilmar client requirement. My role-
To connect and terminate of motors with the help of my works and arrange proper tools and equipment’s which required motors. Also arrange permit for workers in refinery in hot work or height wok. Also following safety rules and regulation.
Giving instruction about safety work and giving guides about safety rules and also supervising the work.
Electrical junction box termination which connected to main substation . HUET MMTI/HUET/416/2018 24/11/2018 MUMBAI
CLFC CONTROL LOOP
FOUNDATION COURCE
04/01/2019 MUMBAI
Achievement
L&T corporate technology & engineering academy in industrial training.
THE EARTH TRAINNING CENTER.
DECLARATION
I do hereby declare that the above information is true to the best of my knowledge. Signature
(Siddesh Sunil Devlekar)
Date: