Experience in Brief
Total 07 Years 07 Month
Experience of Civil Drafting
works in building construction
of Highways, Bridges, Roads,
Pipe Culverts, drainages,
sewerage, Irrigation, water
supply, Infrastructure,
Earthwork, and all Services.
Nationality Indian
Religion Hindu
Marital Status Married
Visa Status Employment.(Transferable)
Languages English, Arabic & Hindi.
Education
Qualification
Higher Senior Secondary School (12th)
Board of Secondary Education, Rajasthan
Technical
Education
One Year Drafting Diploma in AutoCAD.
One Year NCVT Certificate in AutoCAD.
One Year Designing Diploma in 3d Max.
One Year Diploma in Micro Soft Office.
MicroSoft Win 98,XP & Win 7
MicroSoft Office
Internet Proficiency
: +971 (0-56-232-****
Career Objectives
To become a competent professional and to utilize the constructive energy and creative vision to aggressively and responsibly handle the present and future needs of an Organization through dedication and commitment to the profession of Engineering.
Personal Skills
Strong verbal and written communication skills,
punctuality, organization and coordination oriented, strong work ethic. Motivated and very team oriented. CAD Software.
AutoCAD
Prolink (SOKKIA)
Micro Soft Office
Page 2 of 8
EMPLOYMENT HISTORY
Date Nov 2012 to Oct 2014
Project’s Scope of works:
Construction of roads &Parking and
providing all Infrastructure
Networks such as Water network,
Firefighting Network & its Pumping
station, SWD network, Street light
network, Etisalat Network & LV
Network. Lying of 1200mmØ Rising
main and related Pumping station.
Construction of 105no of
Showrooms for cars and all
structural, civil, and complete works
of the showrooms.
Cost of Projects is AED 220 million.
Employer
Consultant
Client
Position
Project
Darwish Engineering Emirates.
Government of Sharjah.
Roads & Transport Authority.
Draughtsman
Contract No. R627
Auto Zone in Al Ruqaah Al Hamra
Phase 1 – Stage 1
Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of areas for quantity.
Making as Built Drawings.
Downloading Survey Data from Total
Station.
Calculate earth work quantities by
crossections and surface
comparison method.
Where require, calculate quantity
using Auto CAD.
Date Oct 2013 to June 2014
Project’s Scope of works:
Infrastructure of Road Works With
all Services, drainage system, Water
network, Street light network,
Etisalat Network, Fencing and
construction of two Roundabouts.
Cost of Project is AED 18 million.
Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of areas for quantity.
Making as Built Drawings.
Downloading Survey Data from Total
Station.
Calculate earth work quantities by
cross sections and surface
comparison method.
Where require, calculate quantity
using Auto CAD.
Employer
Consultant
Client
Position
Project
Darwish Engineering Emirates
Government of Sharjah.
Roads & Transport Authority.
Draughtsman
CONTRACT NO: R822
VO.2: PALACE ACCESS ROAD
IMPROVEMENTS
Page 3 of 8
Date July 2013 to Oct 2013
Project’s Scope of works:
Construction of 3 K.M. dual
carriageway with Street light
network, Etisalat, Water, Gas
and future services.
Cost of Project is AED 12 million
Employer
Consultant
Client
Darwish Engineering Emirates
Ministry of Public Works.
Position Draughtsman. Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of areas for quantity.
Making Crossection for Earthwork
Quantity.
Making As Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD.
Project
IMPROVEMENTS AND UPGRADING
OF THE ROAD BETWEEN AL
TAWEEN ROUNDABOUT –SHEIKH
MOHAMMED BIN ZAYED ROAD
PART 1 SECTION 1
2013/97/341***-****/ ط
Date Jan 2014 to Sep 2014
Project’s Scope of works:
Infrastructure Project with dual
Carriageway laying of all Services.
laying of 2000mmØ SWD line and
rising main.
Cost of Project is AED 45 million.
Employer
Consultant
Client
Position
Project
Darwish Engineering Emirates
Government of Sharjah.
Roads & Transport Authority.
Draughtsman
CONTRACT NO: R822
MAIN ROADS AND EXTERNAL
WORKS FOR AL QASIMIA
UNIVERSITY
Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of areas for quantity.
Making as Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD
Page 4 of 8
Date August 2014 to Oct 2014
Project’s Scope of works:
Construction of 4.5 K.M. dual
carriageway with Street light
network, Water Network, Gas,
Firefighting, Electrical, Etisalat,
Drainage and future ducts.
Construction of Gas Culverts.
Cost of Project is AED 15 million
Employer
Consultant
Client
Darwish Engineering Emirates
Government of Sharjah.
Roads & Transport Authority.
Position Draughtsman. Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of areas for quantity.
Making Cross section for Earthwork
Quantity.
Making As Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD.
Project
CONTRACT NO: R812
ACCESS ROADS TOSTP AND TDF
AT AL SAJA’A INDUSTRIAL AREA
Date Nov 2014 to March 2016
Project’s Scope of works:
Infrastructure Project with laying
of Lics, Manholes, SWD line and
400mmØ rising main.
Cost of Project is AED 12 million.
Employer
Consultant
Supervision
Position
Project
Darwish Engineering Emirates
SHARJAH MUNICIPALITY
DRAINAGE DEPARTMENT
Draughtsman
FOUL SEWER NETWORK
FOR FOUR HOTEL
IN AL RIFA, SHARJAH
Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making as Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD
Page 5 of 8
Date November 2014 to April 2015
Project’s Scope of works:
Construction of 3.75 K.M.
450mmØIrrigation line with
washout, Air valve, butter fly
valve, Flow meter valve and
Non return valve chamber.
Cost of Project is AED 4 million.
Employer
Consultant
Client
Darwish Engineering Emirates
WILBUR SMITH ASSOCIATES, INC.
Government of Ajman
Municipality & planning
Department.
Position Draughtsman. Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making As Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD.
Project
CONSTRUCTION OF IRRIGATION
LINE PHASE 2 AT SHEIKH
MOHAMMED BIN ZAYED ROAD
Date Feb 2015 to April 2015
Project’s Scope of works:
Infrastructure Project with laying
of twin od 225mmØ hdpe foul
drainage rising main.
Cost of Project is AED 5.5 million.
Employer
Consultant
Client
Position
Project
Darwish Engineering Emirates
Government of Sharjah.
Roads & Transport Authority
Draughtsman
CONTRACT NO: R700-259
AL JUBAIL MARKET
SEWAGE LIFTING STATION
Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making as Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD
Page 6 of 8
Date April 2016 to March 2017
Project’s Scope of works:
Construction of 7.1 K.M.
Water GRP line with washout,
Air valve, butter fly valve,
and fire hydranr chamber.
Cost of Project is AED 5 million.
Employer
Client
Darwish Engineering Emirates
Sharjah Electricity
& Water Authority
Position Draughtsman. Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making As Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD.
Project
LAYING OF WATER NETWORK
IN NOAF AREA SHJ-KALBA ROAD
Date June 2016 to Dec 2016
Project’s Scope of works:
Infrastructure Project with laying
Of Lics, Manholes, SWD lines,
Washout, Air valve chamber,
500&700mmØ Rising main and
related 2 Pumping station.
Cost of Project is AED 60 million.
Employer
Client
Position
Project
Darwish Engineering Emirates
Ajman Sewerage Private
Company Ltd.
Draughtsman
AJMAN SEWERAGE NETWORK
JURF INDUSTRIAL ZONE 1 & 3
Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making as Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD
Page 7 of 8
Date January 2017 to 15 April 2019
Project’s Scope of works:
Construction of laying of
11.75 K.M. 1400mmØ Rising Main,
Isolation Valve chamber, Washout,
Air valve, Flow Meter chamber,
5 NDRC & PUMPING STATION.
Cost of Project is AED 181 million
Employer
Consultant
Client
Darwish Engineering Emirates
Government of Sharjah.
Directorate of Public Work .
Position Draughtsman. Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making As Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD.
Project
CONTRACT NO: 301-504
EPS6 AND TSE LINE
FROM 5TH INDUSTRIAL AREA
MAIN STP TO SEA - SHARJAH
Date 15 March 2019 to Till Date
Project’s Scope of works:
Construction of laying of
900mmØ, 800mmØ, 500mmØ,
400mmØ GRP pipe & 315mmØ,
250mmØ, 200mmØ, 160mmØ
upvc pipe laying for sewerage networks.
Infrastructure Project with laying
of Lics, Manholes, SWD line,
250mmØ HDPE Rising Main,
Air valve, valve chamber,
& LIFTING STATION.
Cost of Project is AED 85 million
Employer
Consultant
Client
Darwish Engineering Emirates
Government of Sharjah.
Directorate of Public Work .
Position Draughtsman. Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making As Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD.
Project
CONTRACT NO: 301-530
SEWAGE WORKS
AT AL RAMTHA AND
AL QUOZ -SHARJAH
Page 8 of 8
Date 01 January 2020 to Till Date
Project’s Scope of works:
Construction of laying of
21.00 K.M. 800mmØ Carbon
Steel Transmission line,
Isolation Valve chamber,
Washout & Air valve Chamber.
Cost of Project is AED 110 million
Employer
Client
Darwish Engineering Emirates
Sharjah Electricity &
Water Authority
Position Draughtsman. Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making As Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD.
Project
HAMDAH TO BEDIYAH & D800
CARBON STEEL MAIN
TRANSMISSION PIPE
LINE ZONE 3, SHARJAH
Date 10 February 2020 to Till Date
Project’s Scope of works:
Construction of laying of
3.00 K.M. 630mmØ Rising Main,
Dishcharge chamber, Washout,
Air valve Chamber & 2 NDRC.
Cost of Project is AED 65 million
Employer
Consultant
Client
Darwish Engineering Emirates
Government of Sharjah.
Departement of Public Work .
Position Draughtsman. Prime Responsibilities:
Making Shop Drawings.
Making Drawings for Services as per
NOC’s.
To Give Data to Surveyors.
Calculation of lengths for quantity.
Making As Built Drawings.
Downloading survey data from total
stations.
Where require, calculate quantity
using Auto CAD.
Project
CONTRACT NO: 301-815
GROUND WATER DRAINAGE
IN THE PARKING AREA IN AL
QASMIA UNIVERSITY