Dil Bahadur
Thapa
Civil Engineer
Address:
Abu Dhabi, UAE
Phone:
E mail:
***********@*****.***
linkedin.com/in/dil-bahadur-
thapa-4a1a56152
Facebook.com/Dil Thapa
Date of Birth
28/12/1978
Passport No:
10016919 (Nepal)
Skills
MS Office. (MS Words, MS Excels,
MS Power Points, MS Project)
Auto Cad (2D)
Detailed/Layout Surveying (with
total station)
PROFILE
Detail-oriented Civil Engineer with experience and a zest for solving complex problems. A good team player and also capable of working independently with minimum supervision and committed to providing high quality service to every project with a focus on health, safety and environmental issues. WORK EXPERIENCE
Nov., 2019 to
April, 2020
Civil Engineer
Al Otbi General Contracting & General Maintenance Est. Al Ain – United Arab Emirates
Nature of Work:
Facility Management of and maintenance works of all aspects of the projects. Maintenance and renovation of buildings, roads, drainage, water supply pipelines, paint works and electrical works etc.
• Prepare weekly work progress reports, necessary Work Orders and material requisitions.
• Prepare change orders, submittals & shop drawings.
• Inspect the work done at site for the quality assurance of the work (For all Civil, Electrical and Plumbing works: Floor and Wall Tile, Carpentry, Aluminium and Steel, Paint, False Ceiling, Lights, Cable, Switch and Sockets, Water Supply Pipeline, Drainage line, Sanitary, Pumps etc. works).
• Carried out measurements, prepare drawings, estimation and supervision of construction and renovation works in different camps and prepare final bill of work complete for final payments.
July, 2018 to
Sept., 2019
Consultant Project Engineer (Civil)
ALTERNATIVE ENERGY PROMOTION CENTRE
Renewable Energy for Rural Livelihood
Khumaltar, Nepal
(Project: Tarakhola Small HydroPower Project 380KW) Nature of Work:
Plan, schedule, control and manage the construction activities of the project. Supervision of the penstock pipe works, powerhouse, switchyard and transmission and distribution of 11KV line.
• Conducted layout and supervision of civil and Hydro mechanical Works. Inspect and check the concrete work, stone masonry works, formworks, reinforcements, MS Steel penstock pipeline and bifurcation pipe. Inspect the welding works for the quality assurance of pipe joints. 2
Engineering/Project Management
skill.
Engineering Documentations.
Professional
Registration:
Regd. No: 5697 Civil “A”
Category Nepal Engineering
Council
TRAININGS &
CERTIFICATES:
Short Course in "Hydropower
Water Conduit Design", at
IHE Delft, the Netherlands
from 12 March 2018 to 23
March 2018.
Short term training on
“Electro- Mechanical Design
Engineers of Micro/Small
Hydropower” (August 29 –
12 September, 2009)
organized at Indian Institute
of Technology, Roorkee, India
sponsored by Alternate
Energy Promotion Centre,
Ministry of Environment,
Science and Technology.
Government of Nepal.
“Technical
Supervisor
Training on
Water Supply
and
Sanitation
Scheme
Design and
Supervision”
(30 Oct. to 8
Nov., 2007),
organized by
RWSSFDB
with the
assistance of
IDC, Pvt. Ltd.
• Conducted layout and supervise of the High Tension and Low-Tension Line work for the electricity supply to the community.
• Supervised and involved in layout of the turbine, Generator, Panel Boards and Powerhouse wiring work.
• Prepared the final bills for the work completed projects for the payments.
January, 2018
to July, 2018.
Construction Manager
DARAMKHOLA HYDRO ENERGY LTD
Kathmandu, Nepal
(Project: Daramkhola Hydroelectric Project 9.6MW)
Nature of Work:
Liaison with the contractor and the client, oversee the construction schedule and manage the construction
activities of the project.
• Liaised with company safety representatives to promote awareness and understanding of safety protocols.
• Inspected sites before and after construction projects.
• Prepared cost and inventory reports and maintained accurate records using company work order reporting system.
• Maintained daily communication with vendors to drive forward progress of project.
• Maintained safe work environment with zero accidents or lost work days.
• Maintained accurate records and prepared cost and inventory reports.
April, 2016 to
Oct., 2017.
Assistance Project Manager
FEWA CONSTRUCTION
Pokhara, Nepal
(Project: Middle Modi Hydropower Project 15.1MW)
Nature of Work:
Schedule and manage the construction activities of the project. Reporting and assisting the Project manager on daily work activities.
• Created agendas and communication materials for team meetings.
• Worked closely with team members to deliver project requirements, develop solutions and meet deadlines.
• Handled all delegated tasks.
• Planned and prepared daily work schedules and reports of construction activities.
• Supervision and quality control on all civil works such as ratio maintaining on concrete and plaster work, quality assurance on paint work, reinforcement work, carpentry work, framework and other related works.
3
May 8, 2015 to
April 30, 2015
Hydropower Engineer (Civil) (Short Term Contract)
RENETECH AB Org.
Nr. 556-***-****, SE-103 59 Stockholm Sweden
(Project: Rucanzgera Small Hydropower Project (1.6MW), Western Province, Rwanda)
Nature of Work:
Identification and selection of the location for the headworks area, penstock alignment, powerhouse and switchyard areas. Discharge measurement of the river for the design of the hydropower project.
• Created agendas and communication materials for team meetings.
• Conducted site selection work for Rucanzgera Small Hydropower Project (1.6MW), Western Province, Rwanda
• Carried out site selection of Headwork area (Intake, Weir, Approach canal, Desilting Basin), Penstock alignment and Power House area.
• Carried out discharge measurement by current meter.
• Assisted in geological and geographical survey.
• Carried out all data collection work for design and estimation works.
• Prepared site verification report.
April, 2013 to
April, 2016.
Resident Engineer.
SAYAPATRI HYDROPOWER PVT. LTD
Kathmandu, Nepal
(Project: Daramkhola “A” Hydroelectric Project 2.5MW) Nature of Work:
Schedule and manage the construction activities of the project. Reporting and assisting the Project manager on daily work activities.
• Responsibly conducted survey and prepared working drawings of diversion dam, water conveyance, desandar, forebay, penstock alignment, anchor blocks, powerhouse station, switchyard station and 33 KVA transmission line network.
• Prepared necessary correspondence, technical reports, contract documents and status reports.
• Performed a lead role in preparation of reports, specifications, plans, construction schedules and
inspections of construction site to monitor progress and ensure conformance to engineering plans, specifications and construction safety standards.
• Supervised and quality controlled on all civil works such as ratio maintaining on concrete and plaster work, quality assurance on paint work, reinforcement work, carpentry work, framework and other related works.
• Performed health and safety supervisory in the working site.
• Acted as project liaison with contractor, client and community.
4
July, 2010 to
Dec, 2012.
Civil Engineer
AL AIN OILFIELD SERVICES EST.
Abu Dhabi, U.A.E.
(Project:MW-LF-159-2010, CMW-11000-FM015, CMW-
11103-M001)
Nature of Work:
Schedule and manage the construction activities of the project. Reporting and assisting the Project manager on daily work activities.
• Performed health and safety supervisory in the working site.
• Prepared detail drawings, estimation and layout of new construction, renovations, and improvements to real property facilities, including utility systems.
• Prepared necessary correspondence, technical reports, contract documents, and status reports.
• Acted as project liaison with Army Corps of Engineers and other design agencies of Directorate of Military Works, Zayed Military City, Abu Dhabi, U. A. E.
• Carried out measurements; prepared drawings, estimation and supervision of construction and renovation works in different camps of U.A.E Armed Force, Zayed Military City, Abu Dhabi, U.A.E.
• Supervised and quality controlled on all civil works such as ratio maintaining on concrete and plaster work, quality assurance on paint work, reinforcement work, carpentry work, framework and other related works.
• Performed health and safety supervisory in the working site.
• Performed record keeping of all types of manpower and scheduling and distributing the manpower according to the work priority.
• Prepared final bills of executed works.
May, 2008 to
June, 2010.
Technical Director (Civil)
Dhaulagiri Civil, Electrical and Mechanical Engineering P. Ltd
Baglung, Nepal
(Project: Gadseri Gad MHP (50 KW), Doti, Ruma Khola MHP
(50 KW), Myagdi, for Kasa Gad MHP (100 KW), Acchham) Nature of Work:
Schedule and manage the construction activities of the project. Reporting and assisting the Project manager on daily work activities.
• Prepared Quotations received from REDPs and area centre of AEPC/ESAP for Micro Hydro Projects.
• Prepared site verification reports of MHP.
• Responsibly conducted design, estimation, Layout and supervision of civil structures and prepared final bills of the completed works of Micro Hydro Projects.
• Responsible for technical and safety management in the construction site.
5
• Carried out Survey, prepared drawings and estimation of Micro Hydro Projects of different remote places of Nepal ranging from 5 KW to 100 KW.
July 2000 - July
2002
Site In-charge (Overseer)
His Majesty’s Government
Rural Infrastructure Development Project
District Implementation Unit
Baglung, Nepal
(Project: Baglung-Burtibang Rural Road)
Nature of Work:
Surveying, supervising and preparing cost estimates and final payment bills of the project works. Assisting Project Manager and in report preparation and conducting meetings with the users’ group.
• Carried out feasibility study and detailed survey of Rural Roads labor-based environment friendly participatory approach.
• Assisted the Engineers in report preparations.
• Carried out the construction activities in selected project.
• Carried out gradual widening of road with construction of appropriate structure like Gabion wall, Dry stone masonry.
• Conducted orientation classes about EFR for DDC, VDC members and Users Committee members.
• Conducted field supervisor training, field orientation to users’ group, maintenance training to supervisors, saving & income generation training to beneficiaries.
• Prepared final Bills of road including community buildings. EDUCATION
2003 - 2007 Bachelor in Civil Engineering
Institute of Engineering, TU, Advanced Collage
of Engineering and Management, Kupondole,
Lalitpur. Nepal
1996 - 1999 Diploma in Civil Engineering
Institute of Engineering, TU, Western Region
Campus, Lamachaur, Pokhara. Nepal