CURRICULUM VITAE
Personal Information:
Name:
IYAPAH, Sagadeven
Date of Birth: 23rd
January 1979
Nationality: Mauritian
Qualification: B-Eng. (Hons) in Civil Engineering - University of Mauritius – 2004
Post Graduate Diploma in Business
Administration with Project Management
– University of Technology Mauritius -
2012
Courses in AutoCAD Level 1 & 2
Course in AutoCAD CIVIL 3D
Contact details:
6701687(home)
5756 8450 (mobile)
*********@*******.*** (email)
Marital status: Married
Experience in Building & Civil
engineering works :
16 years
Language known:
English & French (excellent both written
and spoken)
Driving License: Private Car
Computer Literacy: Microsoft Office Package, including Project
Autocad
Autocad CIVIL 3D
Total Station Surveying Equipment
Hobbies: Nature walk, Basketball, Gardening &
reading about international news.
CURRICULUM VITAE
Sagadeven Iyapah Page 2 of 4
Experience
MAR. 20 - present
Working as freelance
Project: Construction of Elysian Villas at Grand-Baie Post held: Project Manager – coordination between Client, Engineer, Architect and Main Contractor. Ensure that works are done as per budget and scheduled Programme of Works. Quantity Surveying works - preparing monthly statement for payment purposes and rates for new Bill Items.
MAR. 19 – MAR. 20
Working at Macadam Blues Ltd.
Projects: Construction of villa in Black-River – Mr. & Mrs. S. Hein, Construction of house in G-Gaube – Ms. F. Grant
Construction of house in G-Baie – Mr. & Mrs. J-P. Herchenroder Construction of villa in St. Antoine - Mrs. A.Dalais Construction of villa in Belle-Vue – Mr. & Mrs. J. Piquet Post held: Project Coordinator – coordination between Client, Engineer, Architect, Specialists Contractors and Managing Director. Ensure that works are done as per budget and scheduled Programme of Works.
Quantity Surveyor - preparing new tenders and rates for new Bill Items. Reporting Line: Supervisor - Managing Director
Subordinates – Foremen & Site Supervisors (10 nos.) NOV.14 – MAR. 19
Working at Serveng Ltd.
Projects: Upgrading, Rehabilitation, Repairs and Diversion of existing Sewer Reticulation Design and Construction of House Connections in sewered areas in Mauritius Rehabilitation/Provision Of Sewerage Infrastructure at Residence La Cure,P.Louis Upgrading Works in Pierrefonds System – Potable Water Const. of Rising Main & Pumping Station at NHDC Riche-Terre – Sewer Works Post held: Project Manager
Liaison with Client, Engineer and Management at Head Office. Coordination and planning of site activities. Ensure work is done as per Specifications. and Programme of Works and coordination with QS for preparation of monthly statements. Reporting Line: Supervisor - Managing Director
Subordinates – Foremen, Site Engineer & Site Manager (12 nos.) JUL. 14 –OCT.14
Working at RAMASAWMY & RAMASAWMY CO. LTD.
Project: Refurbishment Works at La Plantation Hotel Post held: Site Manager
Responsible for overall site activities, organise meetings with Nominated Subcontractors, liaise with Client, Architect, Project Manager, etc. Ensure work is done as per Specifications. and Programme of Works and coordination with QS for preparation of monthly statements.
Reporting Line: Supervisor – Contract Manager
Subordinates – Foremen, Site Engineer & Supervisors (7 nos.) APR. 14 –JUN.14
Working as freelance
Projects: Waste Management for a Transfer Station
Collection of household/domestic waste in various villages Post held: Quantity Surveyor – preparation of tenders/quotations CURRICULUM VITAE
Sagadeven Iyapah Page 3 of 4
FEB. 12 –MAR.14
Working at CEAL
Projects: Supply of Engineering Materials for new Runway at SSR Airport Construction of ponds at Anahita Resort
Earthworks at Avalon Golf Course
Hard Landscaping & Earthworks for Bagatelle Office Park Surveying of individual plots of agricultural land prior to de-rocking – Omnicane Tendering for – Extension and strengthening of the Mauritius Container Terminal Quay – Bund Construction Package
Post held: Project Coordinator
Follow-up of current projects – cost, production rates, liaison with subcontractors, supervisors & client, check quality of works.
Responsible for plan production on AutoCAD Civil 3D, with data from Total Station. Designing waterways for agricultural fields
Mapping of Google Earth pictures on actual plans
Reporting Line: Supervisor – Operations Manager
Subordinates – Supervisors & Plant Operators (15 nos.) 2010- JAN. 2012
Worked at Sotravic Ltée
Projects: Project Management Department
Contract C2003/20D – Water Supply to La Tour Koenig Industrial Park – Offsite Works – Reservoir and Pipelines. [Incl. Reinf. Concrete works for chambers and 2,000m3reservoir]. DI 150-500mm (3.5km).
Contract MW 35 - Construction of Potable Water Pipelines for Camp Fouquereaux and Alma Regions. [Incl. Reinf. Concrete works for chambers and connection with existing reservoir]. DI 500-700mm (13km) and HDPE 63-160mm (3.5km of Network).
Post held: Assistant Project Manager
Preparation of monthly statements for payment.
Liaison with Engineer and Management at Head Office. Responsible for overall project administration and writing Contractual Letters. Ensure work is done as per Specifications. and Programme of Works.
Reporting Line: Supervisor – Project Manager
Subordinates – Foremen, Site Engineer & Site Manager (10 nos.) CURRICULUM VITAE
Sagadeven Iyapah Page 4 of 4
2007-2010
Worked at Sotravic Ltée
Projects: Tendering and Research & Development departments at Head Office Major contracts involved in:
Plaines Wilhems Sewerage Project
Transfer Stations – operation, maintenance and transportation of waste to the disposal site
Contract MPA 86/2008 - Desilting Works at Port-Mathurin - Lot1
Potable water pipelines for CWA
Coastal Protection Works
Geotechnical Investigations tenders – boreholes and coreholes Research & Development on Shoring Systems and Wind Energy Turbines Post held: Civil Engineer
Preparation of tenders.
Writing of technical data for tenders.
Reporting Line: Supervisor – Head of Tendering Department Subordinates – assistant Quantity Surveyor (4 nos.) 2004-2007
Worked at Sotravic Ltée
Projects: Site Operations
Contract BLK2/IPU01/01 - Northern Plains irrigation Project-Phase II Block 2
(Belle Vue Pilot/Fond Du Sac Region). [Incl. Reinf. Concrete works for chambers]. DI 500mm (3km) and PVC 160-400mm (15km of Irrigation Network).
Contract MSA 01/NPIP – I: PIV/SSIS/01 - Conversion From High Pressure Sprinkler System To Centre Pivot And Solid Set Irrigation Systems In The Northern Plains Irrigation Project Stage 1 (Npip - 1) - Phases II & III (770 Ha). [Incl. Reinf. Concrete works for chambers]. PVC 160-400mm (23km of Irrigation Network).
Contract BLK 8A/IFAD/IPU 01/04 -Northern Plains Irrigation Project Phase II: Block 8A (Mon Tracas/L’EsperanceTrébuchet). [Incl. Reinf. Concrete works for chambers]. DI 500-800mm (4.5km) and PVC 160-250mm (12km of Irrigation Network).
C2005/01 - Transfer of Potable Water from La Nicolière Water Supply System to Port-Louis Water Suply System. [Incl. Reinf. Concrete works for chambers and pipe supports]. DI 500mm (10km) with connections to Le Hochet& Priest’s Peak Reservoir.
Contract C2005/18B - Integrated Infrastructure Development Project at ValleePitot
- Civil Engineering Works For Water Supply. Construction of the 1000 m3reinf. Concrete reservoir and civil works. DI 150-300mm (2.5km) and HDPE 63-160mm
(8km of Network).
Contract WW127X – Lot D - Rehabilitation / Provision of Sewerage Infrastructure on CHA and Low-Cost Housing Estates – Phase III –(Vallijee&Boolaky). [Incl. Reinf. Concrete works for chambers and Pumping Station]. DI 150mm (2km) and PVC 110-160mm (4km of Sewer Network).
Post held: Site Engineer
Setting-out of pipelines
Site administration
Planning of daily operations
Reporting Line: Supervisor – Site Manager
Subordinates – Foremen & Supervisors (10 nos.)
JAN. – JUN. 2003
Industrial training with R.Rambhujoo Co. Ltd.
Projects: Construction of J.Kalachand shop at Rose Belle Construction of Docker’s Village at Baie du Tombeau Post held: Trainee Site Engineer
Setting-out
Site administration
Reporting Line: Supervisor – Site Manager