CAREER SUMMARY
Nov **** - up to present: china petroleum
engineering & construction corporation (CPECC)
Dec 2013 – Nov 2018: Technical Engineer,
Emirates Western Oil Well Drilling & maintenance.
Oct 2012 – Nov 2013: maintenance Engineer, Aqua
Cap company.
********@*****.***
Abu Dhabi - UAE
More info on:
https://www.linkedin.com/in/ahmed-
magdy-741809ab/
Supervises and controls all fabrication, construction and installation activities on site and ensures that all work is completed in accordance with ADNOC standards and related contract’s terms and conditions.
Supervises daily construction work progress as per planned & scheduling, planning of manpower, estimation of materials, tools, and equipment’s for assigned projects.
Ensures that the work activities are in safe condition at all times and completed on time as per ADNOC HSE and QA/QC specifications and procedures
Monitors the daily work activities of Sub -Contractor and updating Sub- Contractor Progress Report
Reviews of all Piping and Pipeline deliverables - Field Map, Plot Plan, Piping General Arrangement Drawings, Pipe Support Design Specifications, Piping Design Basis, Piping Material Take Off, Special Materials MTO and Valve Data sheets, Piping Layout drawings, Isometric Drawings for Approaches and Tie-in List
Supervises and follows up construction activities of other disciplines such as civil, mechanical and supervises coating activities on site; right of way construction, pipe bending, welding of line pipes, pipe lowering in, tie-ins and road crossings, backfilling and installation of line markers.
Reviews and modifies of the Method statement for constructions activities which includes Right of way, Backfilling, Pipelines Road Crossing Open, Cathodic Protection Installation, Existing Pipeline & Cable Crossing, Pipe Stringing, Pipe Bending, Pipelines Welding And cold & hot Cutting, Cable Laying, Existing Pipeline & Cable Crossing and Cleaning, Gauging, Filling, Pressure Testing, Dewatering and Drying Procedure For Pipelines
Reviews of all Piping and Pipeline deliverables - Field Map, Plot Plan, Piping General Arrangement Drawings, Pipe Support Design Specifications, Piping Design Basis, Piping Material Take Off, Special Materials MTO and Valve Data sheets, Piping Layout drawings, Isometrics and Tie-in List.
Follows up piping foundation/support installation and construction, piping erecting, valve installation and pre- commissioning and tie-in with the existing facilities during the shutdown.
2018 - Present Abu Dhabi - UAE
China petroleum engineering & construction corporation (CPECC) Ahmed Magdy Said El Tanbedawy
WORK EXPERIENCE
2 P a g e
2013 - 2018 Abu Dhabi - UAE
Emirates Western Oil Well Drilling & maintenance
2012 - 2013 10th Of Ramadan - EGYPT
Aqua Cap Industry
Supervision for full rig up and rig down for our equipment (pipes, hammer valve, swivel and elbow).
Work in (EW 2000 & EW 4000) simulation Ships and make mixed acid with chemical additives.
Make maintenance and repair for high pressure pumps and for all equipment.
Maintenance and repair (actuator, solenoid, sensors, flow meter, and butter fly valve and keep save the system running well and make paper work for the job (Ticket, Schedule, Report and Chart).
Implementing preventive maintenance for plastic injection and compressing machines.
All types of mechanical Maintenance for machines and its utilities. EDUCATION
2007 - 2012
B.Sc. of Mechanical Engineering (Mechatronics Division) – August 2012.
(The Higher Technological Institute, 10th of Ramadan City, Egypt.) Senior Project: Double Glass Clean Robot.
Senior Project Grade: Excellent
SKILLS
LANGUAGES
HVAC Courses (HAP Software).
Fire Fighting Courses.
Gas Tester & H2S Courses
ICDL.
Internet Technology.
Auto Cad software
Self-motivated.
Co-operative.
Arabic - Mother Tongue
ENGLISH - Very Good
10th Of Ramadan - EGYPT