MUHAMMAD AFZAL
*****.*********@*****.***
Cell # +971-**-***-**** +92-331-*******
Current Position : ELCTRICAL SUPERVISOR/JP
Date of Birth : Feb. 10, 1992
Total Experience : 07 YEARS 06 MONTHS
QUALIFICATION : Bachelor of Engineering Degree in Electrical & Instrument from
BZU, university, Multan, Pakistan.
: Three Years Diploma of Associate Engineer (D.A.E) in Electrical through Punjab Board of Technical Education, Lahore, Pakistan.
TRAININGS/COURSES : Safety Inspector training through Zelcon Training Institute, Lahore
: IOSH Certificate through Orient training centre ABU DHABI.
: Job Performer certificate through C.C.I.C and ADCO training centre.
: PICWS certificate through GASCO training centre
: Job originator / Acceptor certificate through C.C.I.C and GASCO Training centre.
SUMMARY
Electrical and Instrument /Cathodic Protection Professional involved in E&I installation,Corrosion Control by Cathodic Protection Technology Services” with good background in, Construction Management, Maintenance Management at Oil, Gas well heads, Stations, Plants and Cross Country Pipeline Projects with 7 years proven work experience in Field Surveys, Installation, Supervision, Testing,, Monitoring & Maintenance.
KEY PROJECTS & POSITIONS
Position
Project
Period
Electrical.JP& Supervisor
BAB INTEGRATED FACILITES PROJECT CPECC company, Abu Dhabi.
CLIENT ( ADNOC )
FEB 2019 to date
E&I / Cathodic Protection Foreman
Integrated Gas Development Expansion Pipeline-IGD-E) 42” Gas Pipeline from Habshan-5 to Ruwais & 6” Gas Pipeline from Habshan -5 to Habshan 1-4], GASCO, Contractor: Technicas Reunidas, Consolidated Contractors company, Abu Dhabi
Jan 2016 to AUG 2018
E&I / Cathodic Protection Foreman
At BHOG Phase-1 and Phase-2, Consolidated Contractors Company, Abu Dhabi: With client: ADCO, Contractor: Petrofac.
Nov 2014 to Jan 2016
Electrical and Instrument Charge-hand.
At shah sulphur station Plant Project (SSP) [With client: Alhosan gas).
HSE Officer
Engro foods, Lahore
Jan 2013 to Aug 2013
EXPERIENCE DETAILS:
Consolidated Contractors Engineering Company,
Position : Job Performer /PICWS– (E&I / Cathodic Protection) Foreman.
Project Ref. : Integrated Gas Development Expansion Pipeline-IGD-E) 42” Gas Pipeline from
Habshan-5 to Ruwais & 6” Gas Pipeline from Habshan -5 to Habshan 1-4
Location : Habshan to Ruwais near Madina Zayed City Western Region
Client : GASCO, Contractor: Technicas Reunidas
Period : Jan 2016 to till date
Responsibilities and Duties:
E&I Responsibilities.
Installation of cable tray, lighting fixtures, hand switches, field junction boxes and control building cabinets.
Installation and glanding & termination of public address system equipment and accessories.
Installation of Fire & gas instruments in control buildings and field.
Laying, glanding & termination of cables for fire & gas instruments.
Assistance with the personnel during commissioning activities.
Easily can perform the jobs in running plants with safety requirements.
Punch list clearing and assistance with the QC inspectors during inspection after the completion of job.
Have a good knowledge about the project safety rules and regulations.
Easily can get along with peoples in any environment and believe to follow the team work requirements.
Assist construction group for the calibration of instrument, leak testing and other construction works related to Mechanical Completion.
Coordinate and monitor the "Permit to Work" system.
Coordination of permit to work at site, pipeline & plant with job performers.
Awareness and understanding of all safety rules and regulations in the company
Cathodic Protection Responsibilities.
Responsible to carry out Cathodic Protection site data collection and supervise Cathodic Protection construction activities as per approved procedures.
Following instructions from and report to section head and interact with client site representatives.
Leading site teams, coordinating lodging / boarding & transport for site crews, maintaining day work sheets & daily reports, maintaining Cathodic Protection equipment in good working condition with calibration track record.
Coordination with respect to Interface Management with Clients, Project Management consultants, contractors for interface meetings to ensure resolution of all technical issues encountered during the different phase of Construction.
Carrying out soil resistivity survey along the pipeline route at every one kilo meter intervals, under HT lines of 66kv and above, near road crossings, foreign pipeline crossings.
Pipe to soil potential measurement at every month and submitting the same to the client
Protecting the beach scraper valve station pipeline to offshore pipe sacrificial CP method.
Carrying out CP Pad welding at every one km as per GASCO Spec.
Installation of magnesium Anodes, Zinc anodes as per Specifications.
Consolidated Contractors Engineering Company
Position : Job Performer – (E&I / Cathodic Protection) Foreman.
Project Ref. : At BHOG (Oil & gas well heads, Pipelines, RDS station and Inside BCDS) Phase-1
and Phase-2 Habshan
Location : Habshan Area near Madina Zayed City Western Region
Client : ADCO
(Contractor : Petrofac.)
Period : Nov 2014 to Jan 2016
Responsibilities and Duties:
Ensure that the work to be carried out in accordance with safe working procedure and conforms to project specifications.
Site Supervisor throughout the performance of related works in order to complete the work as per the planned schedule.
Maintain the records and all construction related reports for the completion of the project.
Co-ordinate with site QC Engineer at all relevant stages of work for fulfilling the quality system requirements for the project.
Conduct daily TBT related with the job activity at site.
Ensure the workforce aware of emergency alarms & contact numbers.
Ensure the workforce members have the required PPE.
Coordination with Client and Consultant.
Supervision in all E &I works such as Cathodic protection, solar system in oil and gas wells
To keep record of drawing incoming and outgoing correspondence and transmittal
Discuss all safety precautions required at site.
Laying, glanding & termination of cables for fire & gas instruments.
Assistance with the personnel during commissioning activities.
Easily can perform the jobs in running plants with safety requirements.
Punch list clearing and assistance with the QC inspectors during inspection after the completion of job.
Have a good knowledge about the project safety rules and regulations.
Easily can get along with peoples in any environment and believe to follow the team work requirements.
Assist construction group for the calibration of instrument, leak testing and other construction works related to Mechanical Completion.
Position : (E&I Charge hand)
Project Ref. : At shah sulphur station Plant Project (SSP)
Location : Shah Gas Development Project
Client : Alhosan Gas).
Duration : Nov 2013 to Nov 2014
E&I Responsibilities.
Laying of electrical and instrument cables in cable trenches and above ground.
Insulation resistance testing for transformers, MV switch gear, LV switchgear and power cables.
Fabrication and installation of supports for cable tray, field junction boxes, hand switches, lighting fixtures.
Fabrication and installation of underground PVC conduit pipe and G.I conduit pipe inside the buildings.
Have good knowledge and experience about the material arrangement and storage commonly used for electrical works.
Installation of the following electrical equipment’s: switch gear, MCC, switch board, transformers, bus bars, batteries, motors and other electrical accessories.
Grounding and lighting protection system.
Glanding and termination of cables in substation panels, motors, street lights, motor hand switches, transformers and batteries.
Motor solo run test, check for rotation direction, vibration, temperature and current testing.
Installation of cable tray, lighting fixtures, hand switches, field junction boxes and control building cabinets.
Installation and glanding & termination of public address system equipment and accessories.
Installation of Fire & gas instruments in control buildings and field.
Laying, glanding & termination of cables for fire & gas instruments.
Assistance with the personnel during commissioning activities.
Easily can perform the jobs in running plants with safety requirements.
Punch list clearing and assistance with the QC inspectors during inspection after the completion of job.
Have a good knowledge about the project safety rules and regulations.
Easily can get along with peoples in any environment and believe to follow the team work requirements.
Assist construction group for the calibration of instrument, leak testing and other construction works related to Mechanical Completion.