ZEESHAN SABIR
Land Surveyor
**************@*****.***
Page 1 of 4
EDUCATION
SURVEYING DIPLOMA FROM
P.M.D.C SURVEYING
INSTITUTE KHEWRA IN 2006
CIVIL ENGINEERING
DIPLOMA FROM INSTITUTE
OF PROFESSIONAL STUDIES
ISLAMABAD IN 2009
COMPUTER / SOFTWARE
SKILLS
• Auto cad
• Auto Cad Civil 3d
• Lis cad
• Topo Site
• Survey work in Excel
• MS Office
• Surfer
• LeicaGeo Office
LANGUAGE
• English
• Urdu
DATE OF BIRTH
• 05 November 1988
Marital Status
• Married
Valid Driving License
• Yes (Qatar)
EXPERIENCE PROFILE
I am qualified Land Surveyor with over 10 years’ experience working on 66/11Kv Substation Buildings & infrastructure projects including roads, drainage, sewerage works, and other public works. I worked as Senior Land Surveyor and Land Surveyor in U.A.E, Qatar and Pakistan. Leading teams of land surveyors with international consultants and contractors. I am proficient in using GPS, total stations, level instruments and all other survey equipment and able to perform site and office surveying work. PROJECTS EXPERIENCE
DORSCH QATAR, Doha, Qatar
NOV 2015 – April 2020
Project:1 Construction Package 24
Design & Built of 66/11Kv Substations for West, Wadi, North, Marina, District Cooling Plants and Qetaifan Island South. Project:2 LUSAIL Commercial Boulevard with A3
Road, Troughs, Underpass, Tunnel, FXH
LRT Stations & Utilities
Client: Qatari DIAR Real Estate Investment Company (Qatar)
(LUSAIL Real Estate Development Qatar)
Project Role: Land Surveyor
Duties and Responsibilities for above projects:
• Carry out inspections of all Surveying work of 66/11Kv substations and Cable routes, site preparations and blinding for proposed 66/11Kv underground structures and the bottom slab, structure walls, roof slab as per design. All kind of survey activities Specially Road Work, Horizontal and Vertical Curves, Super Elevation.
• Locate and record the existing utilities along the route and prepare report.
• Prepare daily and monthly reports of project for Resident Engineer.
• Manage all survey Teams and their activities.
• Maintain Office record. Prepare Check Requests. Also, Supervision of all Survey activities as per Drawing and Specification.
• Checking the Quantity of stockpile.
• Checking the project IFC & Shop Drawing.
• Checking the As-built Drawing of Project.
ZEESHAN SABIR
Land Surveyor
**************@*****.***
Page 2 of 4
Be Six Construction, UAE
May 2014-Oct 2015
Project: Dubai water canal (Infrastructure3 and Coastal Works) Of Road and Transport Authority U.A.E
Project Role: Project Surveyor
Duties and Responsibilities for above projects:
• Responsible for all survey work pertaining to site development plan such as: Levelling of Sub Grade, Sub base, Base Course and Asphalt etc.
• Establishment of horizontal and vertical control points for fixed reference using Total station.
• Conduct topographic survey.
• Profile and cross sectioning of areas covered by site construction area to determine portion to be cut or fill for preparation of monthly progress accomplishment for monthly progress billing.
• Lay-out and as-built all structure facilities based on designed plan such as: drainage pipe line and other underground facilities.
• Lay-out and setting out of vertical and horizontal alignment of concrete Canal.
• Processing and plotting of data using AUTOCAD.
Be Six Construction, UAE
July 2013-May 2014
Project: Humriyah Power station (Ajman)
Client: Sharjah Electric and Water Authority
Project Role: Land Surveyor
Duties and Responsibilities for above projects:
• Responsible for all survey work pertaining to site development plan such as: Levelling and Setting Out.
• In-charge with the use of the major survey instrument utilized in the field.
• Establishment of horizontal and vertical control points for fixed reference using Total station.
• Conduct topographic survey.
USE OF LATEST
INSTRUMENTS.
• Sokkia (SET 500, SET
610, SET 630)
• Leica (SET TS02, SET
407, SET 307, SET
805, SET 1200)
• Nikon (SET DTM632)
• Pentax (SET R-325)
• GPS Leica Viva GS-14
• GPS Sokkia
May 2014 – Oct 201
Package-
Client: Ministry
Project Role:
Duties and Respon
• Responsib
developm
base, Bas
• In-charge
ZEESHAN SABIR
Land Surveyor
**************@*****.***
Page 3 of 4
• Lay-out and as-built all structure facilities based on designed plan such as: drainage pipe line and other underground facilities.
• Processing and plotting of data using AUTOCAD
• Leveling and setting out of column, walls and roof.
• Setting out for steel structure.
Habib Const. services, Pakistan
January 2013 – June 2013
Project: Metro bus Underpass Kalama chock Lahore
Client: Lahore Development Authority Lahore
Project Role: Senior Land Surveyor
Duties and Responsibilities for above projects:
• Responsible for all survey work pertaining to site development plan such as: Levelling and Setting Out.
• In-charge with the use of the major survey instrument utilized in the field.
• Establishment of horizontal and vertical control points for fixed reference using Total station.
• Conduct topographic survey.
• Lay-out and as-built all structure facilities based on designed plan such as: drainage pipe line and other underground facilities.
• Processing and plotting of data using AUTOCAD
Habib Const. services, Pakistan
January 2010 – January 2013
Project: Benazir Bhutto International Airport Islamabad
(Civil work, Passenger Terminal Building, Control
tower & power plant)
Client: Civil Aviation Authority Islamabad Pakistan Project Role: Land Surveyor
Duties and Responsibilities for above projects:
• Responsible for all survey work pertaining to site development plan such as: Levelling and Setting Out.
• In-charge with the use of the major survey instrument utilized in the field.
ZEESHAN SABIR
Land Surveyor
**************@*****.***
Page 4 of 4
• Establishment of horizontal and vertical control points for fixed reference using Total station.
• Conduct topographic survey.
• Lay-out and as-built all structure facilities based on designed plan such as: drainage pipe line and other underground facilities.
Processing and plotting of data using AUTOCAD