Post Job Free

Resume

Sign in

Land Surveyor

Location:
Fereej Ibn Dirhem, Qatar
Posted:
July 05, 2020

Contact this candidate

Resume:

ZEESHAN SABIR

Land Surveyor

adeb9v@r.postjobfree.com

+974********/+923*********

Page 1 of 4

EDUCATION

SURVEYING DIPLOMA FROM

P.M.D.C SURVEYING

INSTITUTE KHEWRA IN 2006

CIVIL ENGINEERING

DIPLOMA FROM INSTITUTE

OF PROFESSIONAL STUDIES

ISLAMABAD IN 2009

COMPUTER / SOFTWARE

SKILLS

• Auto cad

• Auto Cad Civil 3d

• Lis cad

• Topo Site

• Survey work in Excel

• MS Office

• Surfer

• LeicaGeo Office

LANGUAGE

• English

• Urdu

DATE OF BIRTH

• 05 November 1988

Marital Status

• Married

Valid Driving License

• Yes (Qatar)

EXPERIENCE PROFILE

I am qualified Land Surveyor with over 10 years’ experience working on 66/11Kv Substation Buildings & infrastructure projects including roads, drainage, sewerage works, and other public works. I worked as Senior Land Surveyor and Land Surveyor in U.A.E, Qatar and Pakistan. Leading teams of land surveyors with international consultants and contractors. I am proficient in using GPS, total stations, level instruments and all other survey equipment and able to perform site and office surveying work. PROJECTS EXPERIENCE

DORSCH QATAR, Doha, Qatar

NOV 2015 – April 2020

Project:1 Construction Package 24

Design & Built of 66/11Kv Substations for West, Wadi, North, Marina, District Cooling Plants and Qetaifan Island South. Project:2 LUSAIL Commercial Boulevard with A3

Road, Troughs, Underpass, Tunnel, FXH

LRT Stations & Utilities

Client: Qatari DIAR Real Estate Investment Company (Qatar)

(LUSAIL Real Estate Development Qatar)

Project Role: Land Surveyor

Duties and Responsibilities for above projects:

• Carry out inspections of all Surveying work of 66/11Kv substations and Cable routes, site preparations and blinding for proposed 66/11Kv underground structures and the bottom slab, structure walls, roof slab as per design. All kind of survey activities Specially Road Work, Horizontal and Vertical Curves, Super Elevation.

• Locate and record the existing utilities along the route and prepare report.

• Prepare daily and monthly reports of project for Resident Engineer.

• Manage all survey Teams and their activities.

• Maintain Office record. Prepare Check Requests. Also, Supervision of all Survey activities as per Drawing and Specification.

• Checking the Quantity of stockpile.

• Checking the project IFC & Shop Drawing.

• Checking the As-built Drawing of Project.

ZEESHAN SABIR

Land Surveyor

adeb9v@r.postjobfree.com

+974********/+923*********

Page 2 of 4

Be Six Construction, UAE

May 2014-Oct 2015

Project: Dubai water canal (Infrastructure3 and Coastal Works) Of Road and Transport Authority U.A.E

Project Role: Project Surveyor

Duties and Responsibilities for above projects:

• Responsible for all survey work pertaining to site development plan such as: Levelling of Sub Grade, Sub base, Base Course and Asphalt etc.

• Establishment of horizontal and vertical control points for fixed reference using Total station.

• Conduct topographic survey.

• Profile and cross sectioning of areas covered by site construction area to determine portion to be cut or fill for preparation of monthly progress accomplishment for monthly progress billing.

• Lay-out and as-built all structure facilities based on designed plan such as: drainage pipe line and other underground facilities.

• Lay-out and setting out of vertical and horizontal alignment of concrete Canal.

• Processing and plotting of data using AUTOCAD.

Be Six Construction, UAE

July 2013-May 2014

Project: Humriyah Power station (Ajman)

Client: Sharjah Electric and Water Authority

Project Role: Land Surveyor

Duties and Responsibilities for above projects:

• Responsible for all survey work pertaining to site development plan such as: Levelling and Setting Out.

• In-charge with the use of the major survey instrument utilized in the field.

• Establishment of horizontal and vertical control points for fixed reference using Total station.

• Conduct topographic survey.

USE OF LATEST

INSTRUMENTS.

• Sokkia (SET 500, SET

610, SET 630)

• Leica (SET TS02, SET

407, SET 307, SET

805, SET 1200)

• Nikon (SET DTM632)

• Pentax (SET R-325)

• GPS Leica Viva GS-14

• GPS Sokkia

May 2014 – Oct 201

Package-

Client: Ministry

Project Role:

Duties and Respon

• Responsib

developm

base, Bas

• In-charge

ZEESHAN SABIR

Land Surveyor

adeb9v@r.postjobfree.com

+974********/+923*********

Page 3 of 4

• Lay-out and as-built all structure facilities based on designed plan such as: drainage pipe line and other underground facilities.

• Processing and plotting of data using AUTOCAD

• Leveling and setting out of column, walls and roof.

• Setting out for steel structure.

Habib Const. services, Pakistan

January 2013 – June 2013

Project: Metro bus Underpass Kalama chock Lahore

Client: Lahore Development Authority Lahore

Project Role: Senior Land Surveyor

Duties and Responsibilities for above projects:

• Responsible for all survey work pertaining to site development plan such as: Levelling and Setting Out.

• In-charge with the use of the major survey instrument utilized in the field.

• Establishment of horizontal and vertical control points for fixed reference using Total station.

• Conduct topographic survey.

• Lay-out and as-built all structure facilities based on designed plan such as: drainage pipe line and other underground facilities.

• Processing and plotting of data using AUTOCAD

Habib Const. services, Pakistan

January 2010 – January 2013

Project: Benazir Bhutto International Airport Islamabad

(Civil work, Passenger Terminal Building, Control

tower & power plant)

Client: Civil Aviation Authority Islamabad Pakistan Project Role: Land Surveyor

Duties and Responsibilities for above projects:

• Responsible for all survey work pertaining to site development plan such as: Levelling and Setting Out.

• In-charge with the use of the major survey instrument utilized in the field.

ZEESHAN SABIR

Land Surveyor

adeb9v@r.postjobfree.com

+974********/+923*********

Page 4 of 4

• Establishment of horizontal and vertical control points for fixed reference using Total station.

• Conduct topographic survey.

• Lay-out and as-built all structure facilities based on designed plan such as: drainage pipe line and other underground facilities.

Processing and plotting of data using AUTOCAD



Contact this candidate