Curriculumvitae
Name : Amrullah Alrozi
Birth of date : November, 20’ 1968
Education : Polytechnique continue to Strata 1
Major : Electro
Home Address : Housing Permata Biru
Blok D2 No.18
Kab.Bandung – W est Java Indonesia
Present address : Graha Tidore, tidore street, Great Jakarta Current Cell phone #: +62 – 087*-****-****
Sk ype address: amrullah.alrozi1
E-mail Address : *.******@*****.**.** (use for correspondence) EXPERIENCE
Since Nov, 2017 up to Now
As Operation Manager AT PT SURYA MULTI KENCANA
INDONESIA, Company business is M &E (Mechanical and Electrical) Contractor Project Responsibilities:
1. Hotel Ibis Styles Medan
2. Hotel Royal Asia Palembang
3. Additional Food Court Living world
4. Royal Dental Hospital
5. The Golden Heaven Office
6. Kawan Lama – Ace Hardware (OPI Mall, Solo Square and BEC) As Operation Manager (Installation Mechanical and Electrical) My Role & Responsibility is to lead & manage the operational as following
To provide and establish as following as
1. Provide the Installation schedue for site work
2. Provide and manage the schedule material for approval and onsite 3. Provide and manage the scope of work
4. Provide and manage the engineering schedule (shop drawing production and approval) 5. Provide and manage the Cost Management (Budgeting, Site office expense, Salary/Personal Cost, Material and Equipment Cost, Project Operational Expense, Subcont Cost, Labour Cost, Costing sheet, RAPP)
6. Provide and manage the Quality Plan, QC Plan, Inspection Test Plan) 7. Provide and manage the Human Resource Plan (Staff schedule, Labour Schedule, Facilities schedule)
8. Provide and manage the Communication Management (Project Executive Reporting, Flow of request and feedback)
9. Provide and manage the Risk Management (Risk identification, Preventive and corrective action plan)
10. Provide and manage the Procurement Management Plan (Procurement schedule, Material onsite schedule, payment schedule, Material and Supplier selection schedule, etc) 11. Provide and review the Cash Flow Plan
12. Project Planning and control change management 13. Certificate of Payment Schedule Plan, Revenue Plan, Costing Schedule Plan Curriculumvitae
Since April, 2013 up to Nov 2017
As Project Management and Control Manager AT PT BINTAI KINDENKO ENGINEERING INDONESIA, Company business is M &E (Mechanical and Electrical) Contractor Project Responsibilities:
1. Plaza Cikampek
2. SIMA Office tower project
3. Bintan Resort project
4. Harris & Yello Hotel project
5. MRT Jakarta (underground) – Senayan, Istora, Benhil & Setiabudi As Q A (QA/QC & WHS) Manager
My Role & Responsibility is to lead & manage the operational for QA/ QC and W HS (W ork Health & Safety)
To provide and establish the project quality management plan and safety management plan
To review the quality a n d s a f e t y requirement / standard for each project to align with the project requirement
To Provide and manage quality control & safety program for each project and monitoring the achievement progress
To identifying and solving t h e process problems and support various project and resolves and prevent quality issue
Establish and implement the quality Key Performance Indicators and quality management strategy for each project to achieve company objective
Manage and carry out the quality internal audit
Handling and coordinate the quality issue (customer complain and problem in the project) and provide the corrective and preventive action
Manage and coordinate the QC and safety operational in the project
Provide the quality plan and project control plan and manage the implementation As PPC (Project Planning Control) Manager
My Role & Responsibility is to lead & manage the operational for PPC with scope is Project Planning Control
(PPC), Quantity Survey (QS) and Cost Control
Provide the pre-qualification document for tender submission
Establish and coordinate the master plan schedule of the project relating to material pr oc ur em ent, labor cost and overhead cost/ operational expenses
Manage and monitor the progress of project (material usage and updating the cost) by using the ERP software
Planning and manage the material control (Purchase schedule, receiving schedule (MOS), purchase volume, warehouse stock management, material usage)
Project evaluation (leading or lagging progress, RAPP vs Realization, Costing)
Provide S-Curve (Project Progress summary) and Project Cash Flow (plan and actual) Since Oct, 2010 up to Dec 2012
AS QA SENIOR ENGINEER AT RIYADH CABLE GROUP COM PANY (RCGC) This is Cable industry company
My Role & Responsibilities are:
Develop and manage the implementation of quality Key Performance Indicators and quality management strategy in the 8 plant of company group
Maintain and develop the quality management system in the RCGC
Set up the quality management system in the new plant (RCC Plant) with TQM project program
Manage and carry out internal quality audit to the 8 plant and center department Curriculumvitae
Handling the customer complain and internal non conformity of product quality and carry out corrective and preventive action report using 8D and FMEA
Lead the team to work for all internal quality issue and generate the corrective preventive action
Develop and managed the supplier quality management system (Supplier selection, supplier audit, supplier qualification, supplier performance monitoring, supplier rating system and supplier development system)
Perform the statistical analysis to monitor Material Usage Deviation, Process capability and Productivity Since Nov, 2008 up to Nov 2009
AS QA/ QC AND FINISH GOOD M ANAGER AT PT M ATAHARI LEISURE This is Amusement machine industry company
My Role & Responsibilities are:
Develop and manage the implementation of quality Key Performance Indicators and quality management strategy
Develop and manage the quality system and quality control plan, starting from IQC, IPQC to Final inspection, include supplier development system
Lead the team to work for all quality issue and generate the corrective preventive action
Develop and managed the supplier quality management system (selection supplier, supplier qualification procedure, supplier performance monitoring, supplier rating system and supplier development system)
Manage and develop the quality and productivity performance in the QC department to achieve company expectation
Set up the quality and reliability testing system
Manage the implementation and maintenance of quality related activities and systems including change control, release, returns/recalls, documentation, compliance
Reviewing and authorize the validation (evaluate and reports) of the facilities, equipment and processes
Develop and maintain the quality awareness of staff and promote of Continuous Improvement within entire manufacturing
Initiate and promote the cost reduction program in the internal department and entire company Since Aug 2006 to Oct 2008
AS QA REPRESENTATIVE IN THE PROTEK DEVICES CO.LTD This is Semiconductor company My Role & Responsibilities are:
Manage and coordinate each step process flow of manufacturing shall meet the Protek Devices specification requirement
Manage and Make sure the assembly process Cycle time, Yield is and Quality Control plan meet the Protek Devices requirement and expectation
Drive the Sub cont management to achieve the Protek Quality business
Managed the progress each Assembly and Test process
Make sure the each corrective action is effective implementation
Review the Build of material used by sub cont is match with Protek requirement
Conduct regular quality system audit on each process assembly
Managed the production planning and sub cont capacity and raw material inventory
Manage the Protek equipment property and spare part control also maintenance and calibration procedure
Manage the new product evaluation / qualification
Review and follow up the new product specification establish per requirement Since 2001 - 2006
At PT OMEDAT A ELECTRONICS (SUB CONTRACTOR OF SEMICONDUCTOR) LOCATED AT BANDUNG
Curriculumvitae
As QA ENGINEERING HEAD (INCOMING AND SUPPLIER DEVELOPMENT, FRONT OF LINE PROCESS AND TEST)
My Role & Responsibilities are:
Develop and manage the implementation of quality management strategy
Develop and manage the quality system and control plan
Lead the team to work for all quality issue and generate the corrective preventive action
Manage the qualification for any new raw material or new vendor
Manage and develop the supplier quality performance to achieve our company expectation
Managed the supplier rating system
Involved to solving any issue related to supplier
Review and develop the operating procedure and working instruction for QC inspection at IQC, FOL and Test and supplier development program
Handle for any quality issue, such kind ITR, MRB then as coordinator to provide the CAR
Review the customer specification and transfer to the internal process specification and provide the quality test plan accordingly
Perform internal audit for quality management system and accomplishment the corrective preventive action implementation
Review the defective level and trend by monthly base and coordinate and promote for continuous improvement
Review the statistical process control for monthly base for critical parameter on each process from FOL to Test
Perform the engineering evaluation to verify any raw material change to improve the quality, cost reduction of raw material supply
Perform reliability evaluation for new product or raw material change Since 1999 – 2001
AT PT OMEDAT A ELECTRONICS (SUB CONTRACTOR OF SEMICONDUCTOR) LOCATED AT BANDUNG
As A INCOMING QC AND SUPPLIER DEVELOPMENT SUPER INTENDENT My Role & Responsibilities are:
Manage the raw material incoming inspection ( wafer, lead frame, epoxy, molding compound, etc)
Manage and develop the procedure and working instruction of Incoming inspection
Maintain and develop the system vendor development with using the vendor rating performance
Develop the Supplier Quality Management System and manage the Supplier performance Database Drive the supplier improvement program by quarter base
Manage the new supplier qualification
Review and follow up the supplier PPAP data
Make sure the supplier C of C/ C of A is meet the raw material requirement (Lead frame, Epoxy, Gold wire, Molding compound etc)
Manage the raw material failure analysis and follow up the CA to supplier
Drive the continuous improvement program at incoming material to accordance the company expectation with implemented the Ship to Stock Program
Since 1991–1999
At SONY ELECTRONICS INDONESIA - ASSY HOME AUDIO VIDEO 1. Job Assignment as a Technical Support of SONY vendor
Main responsible to provide the operation standard, material specification, inspection process and jig and tool for supplier processing
Curriculumvitae
Troubleshoot every product failure. And get corrective action by technical or system improvement in the supplier manufacturing process
2. Job assignment as Supplier development
Reviewing the quality and cycle time for each product type, with develop the part processing to improved the quality and efficiency
Support the supplier to provide and follow-up the short term and long term improvement plan
To set up the quality criteria and set up the limit sample of each product on vendor process
To maintain and review of procedure and working instruction at vendor manufacturing process for Sony product.
3. Job assignment as System and Approval of Sony Supplier,
I have responsibility to make improvement the Quality System and Process Capability for supplier process
To make Improvement Plan to reduce part failure in Sony production also in the company concern.
I was perform the regular audit to make sure the system and process of vendor running as per requirement I have responsibility to conduct supplier qualification 4. Job assignment as Incoming QC section leader
I have responsibility to manage the daily activity of incoming inspection for all material (electrical parts, mechanical parts,safety parts, optical parts, and packaging parts)
Provide the working instruction for incoming inspection process
Provide the inspection standard and criteria of each material
Provide the operation manual for each equipment usage for incoming inspection
Provide reliability testing procedure for each material
Manage the data entry of incoming inspection t and provide the statistical data
Make sure the procedure and working instruction are fully implemented on incoming QC section Job Training
QC 7 Tools (Perform By SONY Corp)
Sensory Inspector (Perform by SONY Corp)
Molding Injection System (Perform by SONY Corp)
Value Analysis (Perform by SONY Corp)
Cost Analysis (Perform by SONY Corp)
Material Control (Perform by SONY Corp)
Part Processing Technology (Perform by SONY Corp)
Global Quality Rating System (Perform by SONY Corp)
Statistical Process Control (level 2) (perform by Omedata)
Failure Mode Effect and Analysis (perform by Omedata)
Internal Auditor for ISO 9001 – 2000 (Perform by AIMS Consultant at Omedata)
Design of Experiment (Perform by Omedata)
Document Control (Perform by Omedata)
Time and Motion Study (Perform by Omedata)
Internal Audit for ISO 14000 (Perform by Novo Consultant at Omedata) Manufacturing Process Knowledge
Injection Molding Process
Metal Stamping Process
W ire Hardness and Power Cord Process
PCB Manufacturing Process
Power Transformer Manufacturing Process
Offset Plastic and Metal Printing Process
Curriculumvitae
Speaker System Manufacturing Process
Carton Box Manufacturing Process
Poly foam Molding Manufacturing Process
Home Audio Video Assembly Process
Semi conductor Manufacturing Process
Cable Manufactuing Process
Skill and Capability
Able to perform the quality system audit
Able to set up and perform the statistical process control (SPC) and QC tools
Measuring system and analysis (MSA)
Provide the system to manage and develop supplier/ Subcontractor
Provide the quality system procedure for each manufacturing process control
Provide the Process Control plan
Provide quality management & safety management plan
Provide the project planning & control management Provide FMEA and Provide 8D report