MOHAMMAD FAIZ ANWAR
Mobile: +965-********,
E-Mail: ***********@*****.***
CONSTRUCTION ENGINEER -Electrical
-Achievement-driven / high performance professional seeking assignments Electrical Construction, Installation, Testing & Commissioning with an organization of high repute
PROFILE SUMMARY
Total Experience (7 YEAR’S, 04 MONTH)
Experience as Follows: -
Construction, Installation, testing and commissioning of Substation (up to 33KV), Power Transformers, Generator, HV GIS switch Gear and Protection control panels.
Construction, Installation, testing and commissioning of Power Control Centre (PCC), Motor Control Centre (MCC)
Construction, Installation, testing and commissioning of Electrical Equipment associated with coal based Thermal Power Plant.
HV and LV Cable laying, Duct banks and Road crossings, Glanding and Termination.
HV and LV cable joints.
Experience in Industrial type heavy duty motors.
Experience in Thermal Power Plant up-to 660MW.
Cable tray, Trunking, Conduits works, wiring in Classified areas
Installation, Testing and commissioning of HV, MV & LV switchgear with Remote control Panel (RCP) & Annunciator Panel.
Installation of lighting and small power.
Installation, testing and commissioning of 110V Battery charger, Battery Bank and DCDB
High voltage testing of cables and Transformers.
Installation, testing and commissioning of UPS and Battery banks.
Installation and commissioning of Grounding systems.
Construction and commissioning of Fire alarm/Fire suppression systems.
Send out RFQ as per procurement schedule.
Follow up / receiving Quotations and Technical & Commercial evaluation for Purchase Order Finalization.
Accurately process purchase order in a timely and effective manner.
Work with senior management to define requirements.
O&G ENGINEERING and CONTRACTING W.L.L (Kuwait)
Electrical Engineer (Oct 2018 to Till Date)
Duration : Oct 2018 to Till Date
Client : Kuwait Oil Company (KOC)
Project : Replacement of Old Substation in West Kuwait Area (Contract No-17052520)
Approval : Approved as Key person
Job Profile : Erection Testing & Commissioning of all Electrical equipment associated with 3 no’s of 5MW Substations having 11/3.3KV & 11/0.45KV feeders and 5MW, 11KV Diesel Generator.
DUTIES AND RESPONSIBILITIES
Performing the Evaluation, execution & testing and commissioning of Replacement of Old Substation project at West Kuwait (GC 16, GC 17 and APS F-23 ), FAT, SAT etc...
Coordinate with Vendor manufacture for Technical Specifications for HT & LT Switchgears, Power & Distribution Transformers, HT & LT Motors, Drives, Cables, Bus ducts, UPS, Battery & Battery Charger, etc.
Review of vendor drawings for HT & LT Switchgears, Transformers, Motors, Drives, etc
Coordinate with vendor manufacture /consultant for the preparation of Earthing, Lighting, Lightning Protection & Cable Tray Layouts.
Good Exposure in selecting Electrical Equipment suitable for Hazardous Area
Trouble shoots plant electrical problems; suggest feasible short and long-term solution.
Develop full commissioning and startup plans for new equipment as necessary.
Primary Current Injection test for Protection and Measuring Current Transformers, Secondary Current Injection Test for Protection Relays, Reliability and Stability Testing, Static Relay Setting, Testing & Commissioning as per Relay Coordination Calculations.
11KV Cable HIPOT test, Meggering, Continuity test, 11KV Bus bar HIPOT, 11KV Feeders Commissioning, Phase Sequence test using Hot Stick, Paralleling of Two 11KV Incomers.
Checking and Testing the Interlocking Systems between Up Stream and Down Stream Breakers and Earthing Interlock Systems for Bus bar and Transformer, Motor Feeders for 11KV, 3.3 KV, 440V system Voltage.
Safety auditing and Inspection
Conducting training programs for the contractor employees.
Maintain contractual records and documentation such as receipt and control of all contract correspondence, customer contact information sheets, contractual changes, status reports and other documents for the project.
Support Product Management / Marketing to ensure company products and services are offered with appropriate, competitive terms and conditions
Handle on-going issue and change management
Monitor transaction compliance (milestones, deliverables, invoicing etc.)
Ensure contract close-out, extension or renewal.
POWER MECH PROJECTS LIMITED
Electrical Construction Engineer (December 2014 to March 2018)
Duration : 17th September 2015 to March 2018
Location : IPP Projects Thermal Power Plant (3X660MW) PPGCL, Bara, Allahabad (UP)
Job Profile : BTG Area (Boiler Turbine Generator) and BOP Area.
Installation Testing & Commissioning of following equipment:
LT motors from 0.09 Kw to 250 Kw (415 V)
HT motors from 300 Kw to 10000 Kw (3.3KV and 11KV)
Air Circuit Breaker (300A to 1034A, 415 V)
Vacuum Circuit Breaker (3.3 KV, 6.6 KV, 11 KV and 33 KV)
Power Control Center and Motor Control Center Panels
Dry Type Transformers (upto 2.5 MVA, 11 KV/415 V)
Oil Type Transformers (upto 45 MVA, 21 KV/11 KV and 11 KV/3.3 KV)
Studying of Drawings which are related to the electrical like PCC, MCC, VFD`s control panels and switch yard control panels etc.
Commissioning and Testing (IR and WR Test, SEF test, REF test, etc.) of Transformers and HIPOT test of HT cables etc.
BDV (Break Down Voltage ) test of Transformer oil of All Oil Type Transformers upto 45 MVA
Erection, testing & commissioning quality control and work as per system requirement & functional & Interlocks ensuring of following equipment:-
Transformers:-GT (Generating Transformer), ST(Station Transformer), SAT (Station auxiliary Transformer), UT (Unit Transformer), UAT (Unit Auxiliary Transformer), Dry Type Transformer for BTG & BOP of the plant (ESP, BOP, and TG 12 MTR. CHP, DM Plant AHP all plant.)
Switchgears:-
11 KV Switchgears for TG, 3.3 KV Switchgears for TG-, CHP, 415 V ACB switchgears for all plant.
Motors:-
11 KV HT Motor in TG & CW Pump house Like as (MDBFP, ID fan, FD fan, & CW Pump Motors etc.), 3.3KV HT Motors in TG, 415 V LT Drive Motor in all plant area,
Battery Bank:-
1. TG Battery Bank 2.AHP Battery Bank 3.DM Plant 4.CHP Battery Bank
Illumination:-
1. TG 2.BOP 3.CHP 4.AHP 5.Transformer Yard 6.400 KV Switchyard
Earthing:-
1. TG 2.BOP 3.CHP 4.AHP 5.Transformer Yard 6.400 KV Switchyard
Cables & Cable Tray: - HT, LT, Power & Control Cables Sizing Calculation, laying & Terminations & Cable tray works.
ESP (Electrostatic Precipitator):-
1. Rectifier Transformer 2. Rectifier Transformer control Panels 3.Hopper Heater 4. Support Insulator Heater 5.PMCC Panels 6.Rapper Panels.
JOB RESPONSIBILITY:
To provide engineering support in installation of equipment, safety means and startup assistant.
To comply with electrical standard operating procedures.
To update the design & drawings as per the electrical distribution changes.
To train & direct Engineer, Junior Engineers & Electricians to switch procedures under fault & maintenance.
To troubleshoot the failures under high voltages or high electrical loads.
To maintain the all records of electrical drawings specifications and programmes.
Break down troubleshooting of S/G, transformers & Motors in short span of time with team work.
TECHNICAL SKILL:
1.Transformers
JOB KNOWLEDGE
(A). Protection devises like –WTI, OTI, PRV, BUCOLZ RELAY, & MOG.; checking of these protective devices to marshalling box to breaker feeder & PLC for their feedbacks.
(B). Transformer Testing Like –Voltage Ratio, Magnetic Balance, Magnetizing Current, Sort Circuit current, Open Circuit Current, vector group & Tan Delta .
2.Switch Gears
JOB KNOWLEDGE
(A). Experience of doing control wirings of L.T. feeders ( D.O.L, R.D.O.L.& Star-Delta) & their control & power troubleshooting.
(B). Experience of Control & Power troubleshooting of H.T. feeders (up to 11 KV).
(C). Testing of Vacuum Circuit Breakers like IR, Contact Resistance & opening Closing timing.
(D). Relay Testing by secondary current injection.
(E). Checking & operating Experience of current setting on Relay like – ABB ( REM-615,REF-615), Schneider Electric (P143, P243, P241), GE Multilin, Siemens (7SR1103, 7SG1714, 7SR22).
Duration : 12th Aug.2015 to 14th September 2015
Location : IPP Projects Thermal Power Plant (2x660 MW) JPNSTPP, Nigrie (M.P)
Job Profile : BOP Area (Water system and Oil system)
Duration : 1st DEC 2014 to 10th Aug 2015
Location : IPP Project Thermal Power Plant (2x660MW), CLP Jhajjar, Haryana
Job Profile : CHP Area (Coal Handling Plant)
Hills Flora Pvt. Limited
Electrical Engineer (October 2012 to November 2014)
Duration: 01 OCT 2012 to 30 NOV 2014
Location: Thermal Power Plant (6X210MW, 8X500MW) NTPC Vindhyachal Singrauli (M.P.)
Project Management & Execution in Following.
Erection, Testing & Commissioning HT, LT Motors, Transformer, HT & LT Panels etc.
Knowledge of panel Erection Testing & Commissioning.
Erection Testing & Commissioning of Wagon Tippler & Side Arm Charger.
Successfully handled the Cable Laying & Associated Cable Tray works.
Maintenance of HT & LT components, transformer, circuit breaker and all type panels.
Maintenance of all types of heavy motors and Transformer.
Construction Power
Circuit Breaker (CB)
Cable Laying & Cable Tray Works
EOT Cranes DSL Erection.
COMPUTER SKILLS
Software: MS-Office, Photo Shop, Base Concepts on AUTO CAD.
Operating System: Windows XP, 7, 8.1 & 10.
ACADEMIC QUALIFICATION
Exam Appeared
Board/University
Year of Passing
%
B.E.( EEE)
RGPV University (Bhopal)
June 2012
74.16%
12th Std.(Science)
M.P Board
April 2007
69.11%
10th Std.(Science)
M.P Board
April 2005
59.00%
PERSONAL DETAILS
Address
Jamua Road Waidhan, Dist-Singrauli (M.P)-486886
Date of Birth
6th July 1990
Gender
Male
Languages known
Hindi, English,
Nationality
Indian
Marital Status
Unmarried
Passport No
N2439005
Civil ID No (Kuwait)
Date:
Place: Mohammad Faiz Anwar