CURRICULUM VITAE
AARISH HAIDER (Senior Engineer/Planning)
Correspondence/Secondary Address
H.No: 323, Gaddha Colony,
Near: Jam-Jam Dairy
Jaitpur, New Delhi 110044
Mob: +91-834*******
Email: ******.*********@*****.***
CAREER OBJECTIVE
To make optimum utilisation of resources by implementing advance technologies for the safe, efficient and profitable operation for an organisation.
And also willing to work in such an environment which en-shape me for further challenges and stabilize my determination to adapt all the situations coming.
EDUCATIONAL QUALIFICATION
Courses
Yr. of Passing
Institutions
Board/ University
%
Bachelor Of Engineering (Civil)
2016
IES Institute Of Technology & Management. Bhopal
RGPV, Bhopal
72.36
INTERMIDIATE
2012
C.R.K college. Hajipur
BSEB, Patna
65
MATRICULATON
2010
Gandhi High school. Bihar
BSEB, Patna
71
DETAILS OF VOCATIONAL TRAINING
PWD, BHOPAL
a.Study of multistory building construction.
b.Study of foundation work.
c.Study of beam & slab construction.
GSCO INFRASTRUCTURE PVT. LTD.
a.Foundation work.
b.Preparing BBS.
c.Study of Structural Drawing.
d.Workability of Concrete.
TECHNICAL EXPERINCE DETAILS (4 YEARS & 1 MONTH)
1.TRACKS & TOWER INFRATECH PVT. LTD (Senior Engineer/Planning)
Project 2
Client: IRCON INTERNATIONAL LIMITED
Working Period: Oct 07, 2017 till present (31 MONTHS)
Project Value- 139 Crores.
Stretch Length- 108 KM (Package-I)
Structures- 172 including minor bridges, LHS & RUBs, Retaining wall, drains, catch water drains and Earth work (Cutting/Filling).
Project: “Earthwork in filling in embankment, provision of blanketing material, construction/extension of minor bridges, Limited Height Subways (LHS) and RUBs(only Sub Structure) drains and Retaining walls, Level Crossings in the stretch from New Katni Jn. to Beohari station, both inclusive in connection with construction of doubling of Railway line in between Katni-Singrauli of West Central Indian Railway.”
Role and Responsibilities under project as mentioned below:
Working as a Senior Engineer/Planning under this project.
Preparing cross-section and as per measurement book for billing purposes.
Calculating quantity of concrete and reinforcement as per drawing.
Preparing roll diagram and project progress statement and MPR at the end of month.
Preparation of daily & monthly work plans and progress reports.
Coordinating with the site execution team for preparing monthly procurement schedules for major materials, building materials, special materials and tools as per the work plan.
Identifying the BOQ deviated items and giving the inputs to contracts department for preparing the claims.
Also involve in Billing work (Preparing RA BILL as per BOQ & Contract Agreement)
Preparing Price Variation fuel, labour, cement, steel and other commodities as per Contract agreement & GCC (Railway) in terms of RBI indices.
Responsible for setting up and maintaining files and drawings of projects.
Deviation/Comparison sheet preparations.
Design of culverts with respect to standard drawings.
Design of road/rail profile and cross section.
Production of plan and profile preparing alignment and cross section with help of site data.
Preparation of completion drawings.
Reporting RFI (Requested for Inspection).
Preparing Daily, Weekly and monthly reporting.
Preparing scheduling time for the project.
Making invoices with Project Coordinator and subcontractor.
Project 1
Client: RITES Limited
Project: NTPC Lara railway stretch construction
Project Value- 102 Crores.
Stretch Length- 20 KM
Minor Structures- 34 including Culvert, Retaining wall, minor bridges, LHS & RUBs and Earth Work (cutting/Filling) & P-way linking work.
2.MAHALAXMI CONSTRUCTION (Site Engineer)
Client: TATA PROJECTS
PROJECT: HIRANANDANI FORTUNE CITY, Panvel
DESIGNATION: Site Engineer
Location: Maharashtra
Working Period: 02 June, 2016 to Sep, 2017 (16 months)
Role and Responsibilities under project as mentioned below:
Working as a Site Engineer under this project.
Inspection of site activities like finishing, plumbing, concreting etc.
Conducting Pre concrete and Post concrete check for all structural works as per drawing.
To submit the daily work progress report to the project manager.
Manages sub-contractor by locating evaluating and selecting sub-contractors monitoring and controlling performance.
Approves construction projects by conducting inspection at critical phases obtaining approval from buyers.
Managing, monitoring and interpreting the contract, design, documents supplied by the clients or architect.
Preparing of monthly running bills.
Monitor the progress on daily basis with respect to 3 weeks look-a-head schedule in order to meet the client completion date.
Check adequacy of permanent materials, tools and consumables with respect to 3-month look-ahead schedule.
As a Civil site Engineer, I can solve the both technical and progress related issues.
STRENGTH
Excellent Communication Skills
Good Team Worker
Willing to work Smartly and ability to learn quickly
Work under Pressure
Excellent Knowledge about Computer Operation (MS-OFFICE)
HOBBIES
Reading Books/Novel
Sketching & Painting
Learning New Things
Go Camping
TECHNICAL CREDITICIANS
Transportation Engineering
Road Estimator 9
Auto Plotter 9
E-survey 14
Auto-CAD 2007-2018
Workshop on Infrastructure Project Management Sponsored by MP Government
Various surveys & having adequate knowledge about theodolite
Total Station Operation.
PERSONAL PROFILE
Name : Aarish Haider
Father’s Name : Ajaz Haider
Mother’s Name : Nargish Bano
Date of Birth : 29-01-95
Gender : Male
Blood Group : O+
Category : General
Marital Status : Unmarried
Languages : Urdu, English and Hindi
Nationality : Indian
Permanent Address : Baghdulhan, Hajipur, Vaishali (BIHAR) 844101
Passport Details : P1059763
Adhaar No : 757*-****-****
Driving License No : BR-312**********
DECLARATION
I hereby declare that the above-mentioned information is true to best of my knowledge and belief.
Place: Madhya Pradesh Aarish Haider
Date: 03/07/2020