Post Job Free

Resume

Sign in

Civil Engineer Engineering

Location:
Doha, Qatar
Salary:
600 BHD
Posted:
July 03, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Name : Rais

Mobile : **** 751-***-****

Skype Id. : raismirror

Email Add : adea8z@r.postjobfree.com

Bahrain CRPEP ENGG.LICENENCE. : Grade B, Registration No: EPP /C2239/ CE/03-B Date of Issue: 09/06/2019, Valid Until: 26/06/2020, C.P. R NO: 841072116

OBJECTIVE:

To Work in a technically simulating & Professionally Satisfying Environment and be a Useful Employee to the Organization Thus Fueling My growth towards an Excellent Construction Project Engineer Level.

Employment : Project Civil Engineer : Exp. In ( Oil &Gas, Hydrocarbon, Petroleum Structures, Maritime,Execution of Substations/Pipe Rack Installations, Bored Piling,Deep Foundations, Cavities, Viaducts,Earthworks, Power plants,Refinery, Metro Rail,Utility, Piping, Lab Testing, Maintenance Works )

Education : P.G: (M. Tech: Structural Engineering ), Graduation: (Bachelor of Civil Engineering)

Work Experience: 13 Years 6 Months : (5Years 4 Months Indian), (5Years 8 Months Overseas, Muscat, Oman) (Current Overseas- 2 -Years 6 months Manama,Bahrain)

Engineering Sectors : Infrastructure Construction Development, Building Project, (Foundations for - Oil & Gas Petroleum,Refinery, Sewerage Plants STP &WTP, Pipe Racks, Compressors, Vessels, Scrubbers, Filters Equipments, Diesel tank ) Water intake Structures, Execution of Substations, Metro Rail Project, Asphalt Road Development, C.D Works, Underground Services, Viaducts, Cavities,Utilities Facilities ( HV/LV Cable & Water Transmissions Main Laying Networks ), Erection of Embankments/ Retaining Walls,Pedestrian Tunnels, Jetty Projects, Marine Projects, Shutdown & Maintenance Projects .

Computer Skills:

Operating Systems : Windows 9x/2000/ XP /vista, M.S Office 2017, M.S Word,Microsoft Lyc2010,Outlook, lotus,PowerPoint, Access

Drafting Package : AutoCAD 2008 / 2009 L.T/20015, 3D Mix

Structural Designing Package : Staad, SAP2000 (Structural), Etabs. Microsatation, Inroads, Sketch Up, Build Master .Steel design,Concrete Design

Planning package : Primavera p6,P5 & P3

Programming : Mat Lab

SAP : (Scheduling, rescheduling, PCNF, CNF, Accruals and Service entries etc., (in PDO-Petroleum Development of Oman)

Volcal :(Roads, & Canal Earthworks)

Geotech Package : GEO05, Geo -slope, Slide phase2, L-pile, GGU Stability, Plaxis 2D &3D

PDM :Pile Driven Monitor

: National Level Staad Certified Engineer

: M.S CIT Passed out Certificated Engineer.

Professional Development Details

1-Certified Lead Auditor - ISO 9001: 2008, 2015

2-Certificate of Chartered Engineer (INDIA) in Civil Engineering Division from the Institution of Engineers (India) In February 2013. (Established1920, incorporated by royal charter1935) 8,Gokhale Road, Kolkata India.(www.ieindia.org)

3- Bahrain Engineers License (CRPEP): Grade B, Registration No: EPP /C3068/ CE/04-B

Date of Issue: 10/06/2018, Valid Until: 09/06/2019, C.P. R NO: 841072116.

4-Public Works Department (P.W.D), LATUR Municipal Council License, Directorate General of Employment & Self Employment Maharashtra State Govt. (India) Civil Engineer License .No. FS-3289/EMS 612006

5-OIL/PETROCHEMICAL INDUSTRY SAFETY COURSE FOR SUPERVISORS Successfully completed. Approved by Ministry of manpower, Sultanate Of Oman. Course date: 02/06/2008 to 10/06/2008.

6- SAFETY INSTRUCTION COURSE FOR SUPERVISORS (MANHOLE) & Occupational Health & Safety successful Completed. Approved by Ministry of Manpower, Sultanate Of Oman.

7-Permit To Work Applicant of Bahrain Petroleum Company (BAPCO), Aluminum Bahrain (ALBA ), BANA GAS, Tatweer Petroleum, GPIC & Petroleum Development Of Oman ( PDO ), Kingdom Of Bahrain .

8-“Confined Space Training” BUREAU VERITAS Certification (BAHRAIN) ISO9001:2008.

9-Knowledge in Indian Code of Standards ( IS450,875, IRS ),British, Euro Standards,ASCE7,ACI530,AASHTO, IBC2009,AISC –Seismic Design 06

Geotechnical Civil Engineering Qualifications –Multi Discipline :

1.Soil testing in the Laboratory & on field,Bore log preparations, Site Inspections,Field work Supervisions, Rock & Soil Sampling,Logging,Analytical Modeling.

2.complete geotechnical investigations and analyses including earthwork and site preparation, deep and shallow foundation bearing capacity and settlement, deep excavation and shoring, slope stability, seismicity, liquefaction, earthquake design, development of recommendations, report preparation, and construction supervision.

3.Oversee and participate in field and laboratory testing of soils, make sure that test equipment and machinery is properly set up, prepare reports of test results and make recommendations for the solution of engineering problems identified in test reports.

4.prepare specifications of soil mixtures for use in roads, embankments and other construction,

5.inspect proposed construction sites to work out soil and foundation conditions by conducting drilling and sampling programs

Project Planning Qualifications :

1-Reviewing Contract Documents: Tenders, Contract terms, drawings, bills of quantity, quotations, suppliers’ prices, and project requirements including labor, material, equipment and site mobilization

2- Prepared project schedule according to relevant documents using Primavera Project Planner

3-Planned site mobilization including personnel, equipment, supplies and temporary offices

4- Reviewed project design criteria factoring in actual conditions and experience as contractor and submitted report to consultant

5- Prepared materials submittal for executive manager, consultant and client approval

6-Prepared material takes off list according to approved materials and delivery schedule for one month, three months, six months as well as entire project

7- Prepared shop drawing for consultant approval with AutoCAD operator and quantity surveyor

8-Implemented Quality Control and Health and Safety policies ensuring compliance to standards

9-Checked shop drawings, prepared as built drawings, provided records and other related documents

10-Prepared monthly payment certificates for client with quantity surveyor

11-Followed up on project progress through daily checks and weekly meetings with consultant and client.

QA/QC Enginering Qualifications;

1.Project Quality Plan (PQP), Preparation of Method Statements, Risk Assessments, Preparation of ITP, RFIs, NCRs, Final Dossier.

2.Corrective Action & Preventive Action (CAPA) preparation & Implementation.

3.Civil, Electrical & Mechanical Completion package.

4.Quality Training, Quality control for all Civil Works.

5.Test Monitoring, Material Inspection and Approval, Weekly QC Reports and Updating, Tests on Materials, Trial Mix and Concrete Testing, Verification of Test Results, Sampling, Onsite Inspections of all kinds of civil works & Installations, Punch list/Snag list. Internal/External Audits.

Civil Construction Qualifications

Pre Execution Activities:

1.Collate LOI from the client, Study General Condition of Contract (GCC), Standard Condition of Contract (SCC), Technical Specification, Interpret conditions with special reference to execution and commercial terms

2.Formulate execution (L2 & L3) plan as per the work order

3.Formulate financial plan i.e Cash-flow, Profit & Loss statement

4.Prepare control budget for execution of the project

5.Formulate and raise requisition for manpower as per the deployment plan

6.Formulate material and logistic plan i.e setting up offices, Stores, IT infrastructure, Guesthouse, Vehicle plan, tool & tackles, safety equipment and material etc.

7.Deploy manpower as per the plan

8.Monitor & execute survey activities and ensure the approved survey and BOQ's

9.Submit the approved survey and BOQ's to Engineering & Design Dept.

10.Coordinate with Engineering & Design Department and Commercial Department for finalization of BBU & uploading in Lead Ahead

11.Forecast & demand material in full kit

12.Assess the risk in the project and institute risk mitigation measures

13.

During Execution Activities

1.Carryout background verification of Identified reputed agencies (Sub contractor) and approve them for erection

2.Allocate execution target to all Project Managers as per the execution plan

3.Conduct periodic reviews meetings and review the progress of the block, vis-z-vis plan, review material status, billing status, and take remedial measures if any

4.Ensure financial review to ascertain that execution is within the budget

5.Delivery of the project conforming to quality standards and safety norms

6.Establish working relationship with all govt bodies and stake holders i.e Electricity board, Safety Inspectors, labor Commissioner, Police etc.

7.Ensure the execution is done within the budget by continuously optimizing operational cost

8.Monitor and ensure availability and usage of safety equipment's by personnel (Contract Labour, Supervisor, Engineers), provide safety training and ensure execution conforming with the laid down safety norms

9.Monitoring of all stores, conduct of periodic audits of all stores and accounts at site

10.Periodic inspections of all company property tool & tackles, Vehicles, etc

11.Facilitate all liaison with equipment's suppliers, testing agencies, inspecting agencies etc.

12.Practical production Experience on all basic civil construction codes for RCC and structural steel, earth work, waterproofing, foundations etc

13.Checking and reviewing the setting out survey and levels / elevation at site,

14.Vast Experience in (Infrastructure Constructions Structures & Utility Sector) site and construction development include embankments, Retaining Walls, PEB STRUCTURES, Intake Structures.

15.Responsible for Execution of Deep & Shallow Foundations, Piling & Sheets Piling .

16.Execution of Foundations & STEEL structures for Compressors pedestals.

17.Foundations Design for VESSELS, SCRUBBERS, COOLERS, Pipe racks etc.

18.Refractory, Scaffolding, Insulations, Coatings, Painting( Airless Spray)Sand Blasting,Waterproofing.

19.Construction of Drainage Systems, Road & Paving Works & Other civil to Process Plant PROJECT.

20.On site experience as a Site-Engineer for construction of high Rise building.

21.Experience in preparing Tender Design, Preliminary Design and Detailed Design structural drawings.

22.To prepare volumetric drawings in AutoCAD 3d for quantity calculations.

23.Experience in Deep Excavations, Strom Waters, water logged areas, Drainages, Sewerages designs .

24.Preparing BOQ, MTQ, BBS. Etc .

25.Execution of Substations,STP Filter house, PowerStation ( Oil & Gas sectors ).

26.Road( Plant service road) .

27.Tank & VESSEL(Pile Raft Foundations ).

28.Concrete laying, Linings .

29.U-Ditches-Ditches Duct Banks .

30.Foundation Design for Water Tanks,Sewerage Tanks Retaining walls.

31.Design & Installations of Precast Concrete Structures.

32.Prep.MS Sheets, QA/QC Inspections .

33.Responsible for Construction of Sub-Stations,Control Buildings,Machinery Buil

Post Execution Activities

1- Monitor & Ensure timely submission of bills

2-:Laison with the top level govt executives i.e CMD, PM, GM etc to ensure cooperation at all stages for early conversion to cash

3- Monitor cost of execution viz a viz planned cost

4- Monitor maintenance of records of material consumption Actual v/s Survey

5- Monitor parity of the certified quantity by the client V/S sub-contractor quantity

6- Monitor material reconciliation of issued material v/s JMC certified material

7- Submit periodical reports to Client and TOP Management of Company

8- Periodical audits of the stores and accounts

9- To oversee process in order to ensure all compliances are met for smooth project closure

A. EXPERIENCE: - COMPANYWISE

SrNO

NAME OF COMPANY

DURATION

CURRENT

DESIGNATION

FROM

TO

YEARS

1

Arabian International Contracting( AIC) WLL

Kingdom Of Bahrain C.R No. 10684-1

www.arabintal.com

November 2017

March3020

2 years 6 Months

Project Civil Engineer

2

Saif Said Saif Al Akzhami LLC

Sultanate Of Oman C.R No. 1/12352/1

www.alkhzamigroup.com

December 2011

August 2017

5 Years 08 Months

Projrct Civil Engineer

3

Dhanchandra Construction Company Pvt. Ltd.

Latur, Maharashtra State,India Registration No 13476 /PWD LATUR Maharashtra

july

2006

December 2011

5 Years 04 Months

Civil Engineer

B- EXPERIENCE: - COUNTRYWISE

Sr.No

Name of Country

Project & Industry

Duration

Name of Company

1

Kingdom of Bahrain

1-“Construction of Flue Gas Desulfurization Absorber Tank( FGD )” –Piling & Underpinning Foundations Works Aluminum Bahrain BSC ( ALBA)

Industry :Oil & Gas

2 Years 6 Months

Arabian International Contracting WLL P.O Box 5813, Manama

Kingdom Of Bahrain

1-“Construction of New Truck loading Station (TLS) & Substation Buildings “ at ALBA Marine – Foundation & Earthworks Industry : Marine

3' - Bahrain Onshore Pipeline Project. Unleaded Gasoline / Low Sulphur Gas line project ( ULG/LSGO ) – Design & Contruction Of Underwster Foundations & Earthworks

Industry : Marine - BAPCO REFINERY

2

Sultanate of Oman

1- Construction of SaihRawl Compression Depletion Phase2 (Hydrocarbon/GAS).PDO

INDUSTRY : OIL & GAS

5 years 8 Months

Saif Said Saif Al Akhzami LLC, PO.Box.7,PC 120, Quriyat

Muscat

(Sultanate of Oman )

2-“Construction of Ministry Of Education Head Quarters Building (MOE) B+P+15th Floor & Ancillaries”–Deep Pile Raft Foundations Industry : Infrastructure Development

3-"Sulphur Granulation Plant, Vessel,Compressors,Filters,Equipments” –Foundations & Earthworks at Petroleum Development OF Oman (PDO)

Industry :Oil & Gas

4- : AZAIBA COASTOL GRID 132/11 KV GIS Construction of New Muscat North 380/110/13.8 kV BSP (SEC- WOA Project) Petroleum Development of Oman Project

Industry : Substation

5- PDO Oman Train 4, Construction of 6nos Cryogenic Post Tensioned Tanks. PDO

Industry : Oil & GAS

3

Republic of India

1- Govt. Hospital (G+6 Community health Centre )Aurangabad .(2.79Cror.)

2- Construction of Library Building at Purnimal Lahoti College(5.68cror), Latur

3- Construction of Administrative Building for Additional Collector Office(6 Cror )Solapur.

Industry : Infrastructure

5 Years 4Months

Dhanchadra Construction Company Pvt. Ltd.

Latur, Maharashtra. INDIA

4 -Metro Rail Project ( Sub contractor), Andheri (EAST) to Dahisar (EAST) Metro-7 corridor -Design of Foundations for Abutments& piers, Deep Piles .

Industry : Earthworks

5- Fly Ash Handling System. Super Thermal Power Station Solapur Maharashtra India.

Industry : Industrial

C. EXPERIENCE: - PROJECTWISE

Overseas Experience: Overseas Experience: (November 2017 to March 2020) Manama, Kingdom of BAHRAIN

Projects Under Employer- Arabian International Contracting Wll, Bahrain

Employer : Arabian International Contracting WLL. Bahrain, CR no 106864-1 p.o Box No. 20037 Manama, Bahrain

Project 1 : Maritime Refurbishment & Construction of Flue Gas Desulfurization Absorber Tank) (FGD Absorber Tank)

Duration : 10 /10/2017 to 20 / 03 / 2020

Cost : 972710 US $

Client : BECHTEL Bahrain,

Consultant. : REEL ALESA/ALBA

Position : Civil Engineer

Roles & Responsibilities Handled

1- Site investigation specification, planning, supervision, management, reporting & interpretation

2- Deep Foundation Execution : Bored, CFA, Driven piles.

3- Retaining Wall Execution : Secant & Contiguous piled (Propped & Cantilever), Sheet piled, Mass Gravity

4- Ground Anchors Execution & Slope Stabilization using Soil Nails

5- Cut & Fill Earthworks quantities calculations

6- Ground settlement analysis

7- Production of tender & contract design calculations & drawings

8- Temporary works designs – Test pile design, formwork designs etc.

9- Quality control & inspection of constructed structures and elements

10- Responsible for onsite examinations, which includes the supervision of all sample collection, analysis, and data.

11- Determines the type of foundations, earthworks, and/or pavement subgrades required for the intended man-made structures

12- Perform geotechnical analysis and study to assess construction site condition.

13- Perform field and environmental investigations for construction projects.

14- Analyze Marine findings, perform appropriate calculations and prepare data reports to Manager.

15- Provide direction to technical team in field inspection activities.

16- Interact with customers and team members to complete the assigned project on-time.

17- Assist Manager in design and evaluation of constructions.

18- Managing, designing, developing, creating and maintaining construction projects

19- Conducting on-site investigations and analyzing data

20- Assessing potential risks, materials and costs

21-Manage, design, develop, create and maintain small-scale through to large-scale construction projects in a safe, timely and sustainable manner

22-·Conduct on-site investigations and analyze data (maps, reports, tests, drawings and other)

23-Carry out technical and feasibility studies and draw up blueprints that satisfy technical specification

24-Assess potential risks, materials and costs

25-Provide advice and resolve creatively any emerging problems/deficiencies

26-Oversee and mentor staff and liaise with a variety of stakeholders

27- Handle over the resulting structures and services for use

28-Monitor progress and compile reports in project status

29- Manage budget and purchase equipment/materials

Project 2 : Civil Works for New Truck loading Station (TLS) (f01 to f05) Under Ground Cable Trench Works (Machinery/Substation /MCC Buildings Constructions at ALBA Marine Potline 6 –Calciner

Cost : 972710 US $

Client : BECHTEL Bahrain,

Consultant: REEL ALESA/ALBA

Areas Of Work In:

1.Management of Project ensuring compliance with Clent's objectives & strategy,plan, implement and document the execution of Project,ensuring optimal conditions and execution within the laid down specification, approved budget,schedule,safety and quality.

2.Maintaining coordination with Engineering for Design,Procurement, Construction activities of the Project.

3.Checking/reviewing Specifications, drawings, material documents, inspection of the construction works as per the relevant standards,project technical

4.Specifications

5.Looking after generation and updating of Progress reports/presentation on the Project on daily, weekly & monthly basis to cover all important

6.Produce reports on project at agreed intervals, and whenever substantive actions are required.

7. Preparation of monthly look-ahead schedules

8.Management of Project team ensuring adequate resources,skills & experience are available to meet the demand of the Project.

9.Schedule work activities and manpower requirements to meet established completion dates.

10. Daily tracking of projects by close monitoring of work progress and manpower productivity and report preparation

11.Ensure site works carried out by sub contractors are meeting procedure specifications, drawings.

12.Attending review meetings with clients and stakeholders

13.Prepared project plans with respect to Specifications

14. Performed bidding and constructability review of project designs and specifications to determine site compatibility and anticipated problems

15.Reviewed submittals and shop drawings for technical accuracy

16.Ensured contractor’s compliance with contract schedule and contract documents during all phases of construction

17.Processed monthly payment requests, requests for information, change order requests, and change proposals

18.Prepared daily quality assurance and progress meeting reports

19.Site investigation specification, planning, supervision, management, reporting & interpretation

20.Deep Foundation Execution, Bored, CFA, Driven piles

21. Retaining Wall Design Review & Execution : Secant & Contiguous piled (Propped & Cantilever), Sheet piled, Mass Gravity

22.Ground Anchor Design Review & Slope Stabilization using Soil Nails

23.Cut & Fill Earthworks quantities calculations

24.Ground settlement analysis

25.Production of tender & contract design calculations & drawings

26.Temporary works designs – Test pile design, formwork designs etc.

27.Quality control & inspection of constructed structures and elements.

28.Performed Maintenance Works : Foundations, services Roads,Interlocks, Kerb stones, Paintings, Floorings, Grouting, Plumbing Electrical, HVAC,Renevation,Plastering, Ramps,Additional Steps, AC Foundations at Roof terrace, Rainwater Harvesting, Terrace roof terrazzo flooring, Water proofing Membrane EPBM installation, Doors, Windows, Ventilators fixing, Master key systems installation for all doors, 60 minutes fire rated doors installation, Ironmongeries Installations, lift James wall flooring installation, External VIP sliding doors installation, Boundary Walls with Grills Installations, StromWater Channels, Manholes, drainage Chember with slope stability, Holding tanks below ground installation, Core Cutting works, CCTV System installation, Flagpole foundations installation, Porcelain, Ceramic tiles,Marble doors Thresholds, windows Marble Sills installation, Expansion joints, movement joints fillings with adhesive sealants again with aluminium Cover Strips installations, Roof Grooves fixing Aluminum flashing with top grouting to prevent water leakages.

Project 3 : Bahrain Onshore Pipeline Project. Unleaded Gasoline / Low Sulphur Gas line project ( ULG/LSGO ) – Design & Contruction Of Underwster Foundations & Earthworks

Client : Bahrain Petroleum Company ( BAPCO )

Consultant. : REEL ALESA/ALBA/BECHTEL BAHRAIN

Scope of work : Design Execution & Supervision of Marine Civil Construction & structural works for Bahrain Onshore Pipeline ( Unleaded Low Sulphur ) including 5 nos of Marine Foundations F01 to F05 for Conveyer Systems for loading and unloading of Black & White Aluminum Raw Powders at Silos, With Substations Building Construction including Cable Trench Works ; Marine Survrying setting out of structures,Geotech Investigations, earthworks, including Deep Bored Piling, CFA piles ( 380 nos of 1 meter Dia piles 380 meters Deep ) Scant, Contiguous ( Proped & Cantilever types ), Sheet piling, Retaining Walls, backfilling,Underwater concrete & Steel structures Erection, Service Road paving works, drainage systems,Stormwater,Grading works,Testing Commissioning & other associated civil work within Marine Potline - 6 area, According to project technical Specifications.

Job responsibilities,

QA/QC Submittals: Review &provide inputs on technical submittals including inspection test plans ( ITP ), Method Statements,Matetial Submittals, Project Qaulity plan,Project Execution plan, Site mobilization plan, BOQ, Traffic managements plan, Chrvklists, List of Lab testing Materials, List of machineries, Hydruclic Rotating Piling Rigs, Loaders, Long Boom Excavators - Thier Maintenace, Manpower materials Tools tackles Histogram. Construction Milestones,RiskAssessments & other relevant QA/QC Documents required for the project .

1- Geotech Site investigation, Planning, supervision management, reporting & interpretation

2 - Marine Topographic Survey & Setting out- Total Station, Bathymetric, GPS converted NSD Coordinate to local Coordinates . Prepared Sectional Par plan & Shop drawings By AutoCAD 2017.

3- Dredging & Reclaimation Works, Foundation Execution : Bored, CFA, Driven piles by Hydruclic RotatingPiling Rigs CASAGRADE & Mait -it, dewatering, Pump Selection, Executed diaphragm wall,Quay Walls Cofferdams.

4- Retaining Wall Execution : Secant & Contiguous piled both (Propped & Cantilever), Sheet Pilling, Mass Gravity Systems. Rapid Hardening Concrete Pouring,testing of Workability all tests.

5- jetty Construction : Ground Anchors Execution & Slope Stabilization using Soil Nails

6- Cut & Fill Earthworks quantities calculations

7- Ground settlement analysis & Underwater Cables and Pipeline Installations.

8-Production of tender & contract design calculations & drawings

9-Temporary works designs – Test pile design, formwork designs etc.

10-Quality control & inspection of constructed structures and elements

11- Determines the type of foundations, earthworks, and pavement subgrades required for the intended man-made structures

12- Perform geotechnical analysis and study to assess construc

13- Perform field and environmental investigations for construction projects.

14-According to IFC,Structural, Architectural, MEP, Electrical & Mechanical Drawings implemented the Works with handling Manpower, machinery, resources & procurements of materials.

15- Prepared As built drawings for Entire Project.

16-Managed, designing, developing, creating and maintaining construction projects according to Scope of Works & Project Specifications.

17- Manage, design, develop, create and maintain small-scale through to large-scale construction projects in a safe, timely and sustainable manner

18- Attained Weekly, Fothnightly Progress Meeting with Prepared Lookahead programe Scheduling together with Clients Consultant, Project Manager, Architect, Subcontractors.

19- Carry out technical and feasibility studies and draw up blueprints that satisfy

20-Provide advice and resolve creatively any emerging problems/deficiencies.

21- Implemented QAQC & HSE Bill preparations, Measurement, Quantity Calculations Handed Over Project with Master Key systems.

Overseas Experience:( December 2011 to August 2017) Muscat, Sultanate of Oman

Projects Under Employer Saif Said Saif Al akhzami LLC, Muscat, Sultanate Of Oman

Project 1 : Construction of SaihRawl Compression Depletion Phase2 (Hydrocarbon/GAS).PDO

Client : P.D.O, MUSCAT,OMAN ( Sultanate Of Oman )

Cost of Project : 30 Millions OMR

Consultant : Al Saqf Engg. Consultants & Majan Engineering Consultants

Areas Of Work in :

1.Site investigation specification, planning, supervision, management, reporting & interpretation

2.Deep Foundation Execution : Bored, CFA, Driven piles

3. Retaining Wall Execution : Secant & Contiguous piled (Propped & Cantilever), Sheet piled, Mass Gravity

4.Ground Anchor execution & Slope Stabilization using Soil Nails

5.Cut & Fill Earthworks quantities calculations

6.Ground settlement analysis

7.Production of tender & contract design calculations & drawings with respect to Specifications.

8.Temporary works designs – Test pile design, formwork preparation etc.

9.Quality control & inspection of constructed structures and elements.

10.Performed Maintenance Works : Foundations, services Roads,Interlocks, Kerb stones, Paintings, Floorings, Grouting, Plumbing Electrical, HVAC,Renevation,Plastering, Ramps,Additional Steps, AC Foundations at Roof terrace, Rainwater Harvesting, Terrace roof terrazzo flooring, Water proofing Membrane EPBM installation, Doors, Windows, Ventilators fixing, Master key systems installation for all doors, 60 minutes fire rated doors installation, Ironmongeries Installations, lift James wall flooring installation, External VIP sliding doors installation, Boundary Walls with Grills Installations, StromWater Channels, Manholes, drainage Chember with slope stability, Holding tanks below ground installation, Core Cutting works, CCTV System installation, Flagpole foundations installation, Porcelain, Ceramic tiles,Marble doors Thresholds, windows Marble Sills installation, Expansion joints, movement joints fillings with adhesive sealants again with aluminium Cover Strips installations, Roof Grooves fixing Aluminum flashing with top grouting to prevent water leakages.

Project 2 :Construction of MINISTRY OF EDUCATION HEAD QUARTOR BUILDING(M.O.E), Busher, Airport Heights, Muscat, Sultante of Oman

Client : MINISTRY OF EDUCATION ( Sultanate Of Oman )

Cost of Project : 30 Millions OMR

Consultant : Al Saqf Engg. Consultants & Majan Engineering Consultants

Areas Of Work in :

1-Responsible for all civil works; led civil works team and technical site office to solve on-site technical issues; forwarded to engineering for approval; filed change request or request for information

2-Supervised all aspects of construction: surveying, excavation, pipe laying, water testing, backfilling, asphalt restoration, site grading, soil stabilization for embankments, compaction tests

3-Monitored subcontractors’ activities, material submission and reviewed statement of work method

4-Managed handover of site and oversaw demolition, site clearance, site mobilization and surveying

5-Coordinated communication among all subcontractors: civil, mechanical, electrical and instruments

6-Monitored construction progress; followed up daily work progress, prepared daily, weekly, monthly reports, took proactive action to prevent delays and implemented strategies to deal with delays

7-Implemented Quality Control and Health and Safety policies ensuring compliance to standards

8-Checked shop drawings, prepared as built drawings, provided records and other related documents

9-Prepared monthly payment certificates for client with quantity surveyor

10-Followed up on project progress through daily checks and weekly meetings with consultant and client

11-Direct & Participate in Surveying to layout Installations by Theodolite, Total Station, Dumpy Level to establish, Bench Marks, Reference Points, Grades & Elevations.

12-Mark-out of the Building.

13-Prepare & Analysis Survey Reports, Drawings, Blueprints, to plan project.

14-Estimating Costing & Rate Analysis, Cost Controls.

15-Quantity Calculations & Preparations of Measurement Sheets of all building Items: Steel Quantity Calculations, Concreting (Site mix & R.M.C.), Shuttering, Plastering, Painting,Railing, Pointing, Soiling, Marble, Thresholds, Sills Floorings, Skirting, Polishing, Etc

16-Preparing of BAR BENDING SCHEDULED (Slab, Beams, Columns, Footings, Staircases, Lifts, Retaining Walls, Water tanks) Ramps, etc..

17-Project and Office Management for Civil Works.

18-Solving Construction, QAQC & HSE Issues, Review Meetings and Site Meetings, Monitoring



Contact this candidate