Hard working construction Site Civil Engineer committed to
ensuring a safe and productive working environment. Skilled at scheduling shifts and monitoring labor, monitoring worksites for safety and regulation compliance, and materials management and coordination. Specialize at coordinating with project developers to maximize efficiency and quality.
Snagging / finishing work:
-Inspect and monitor progress at construction sites
-Make daily decisions about construction activities
-Plan and schedule construction work and assign work to labor and staff
-Follow daily progress at snag list and following inspections
-Making daily Labor allocation sheets and daily reports
-Preparation weekly works permits
-Attending weekly site walks with managements
-Attending inspections with AECOM inspector
-Coordinate and follow all subcontractors ( Plafond, QMI, Folcra, JLW, Al Rawaa... ) work on daily base
-Coordinate with MULTPLEX commercial team and preparing documents for back charging
-Site supervision for steel fire rated door, rectification of hardware and installing of the missing hardware
August 2019 – April 2020
2016
2017
Critical thinking
Communicative
Organizing skills
Ability to work under pressure
Decision making
Conflict resolution
Self-motivation
Team work
Creativity
Ability to multitask
Vukadin
Kostic
CIVIL ENGINEER
*******.******@*****.***
Curent adress:
Dubai, United Arab Emirates
Home adress:
Dusana Dude Timotijevica, 11000 Belgrade
Republic of Serbia
linkedin.com/in/vukadin-kostić-976360100
-Site supervision for GFRC Facade installation work that includes:
1. Site work and progress supervision making sure that job is done in a proper way (Façade work on Hotel and Residence) 2. Coordination with engineers and surveyors
3. Coordination with scaffolding team
4. Preparation of the monthly work plans
5. Attend the site walks and site visits
6. Preparation of all site documents (Discovery reports, Damage reports, Daily reports, providing required drawings, work permits, material quantity estimations, …)
7. Coordination and cooperation with different discipline’s 8. Preparation plans for lifting and installation of big vertical panels
9. Coordination with a factory regarding missing material on site (panels, brackets, fixing screws ...)
Problem solving
May 2020 – July 2020
-Inspect and monitor progress at construction sites
-Make daily decisions about construction activities
-Plan and schedule construction work and assign work to labor and staff
-Follow daily progress at snag list and following inspections
-Maintained records of labor and resources and ensured construction compliance with the plan
-Established and implemented work schedule s and adjusted them to meet project deadlines
-Attending weekly site walks with managements
-Attending inspections with AECOM inspector
-Coordinate and follow all subcontractors ( Al Ghuair, AIG, OTIS, Atlas, Mosart, Assa Abloy, Giffin, Cloisall, Jangho…. ) work on daily base for all Gate Houses, all resources need to complete work on time
-Closing NCR
December 2018 - August 2019
-Site supervision for track slab installation work that include: 1. Installation of concrete slab
2. Installation of permanent rails
3. Leveling of the track
4. Preparation for concrete casting (steel fixing and shattering) 5. Pre-casting inspection
6. Casting of concrete
7. Concrete curing work
8. Inspection of the casted area and leveling re-check with survey
-Inspect and monitor progress at construction sites
-Make daily decisions about construction activities
-Plan and schedule construction work and assign work to labor and staff
-Maintained records of labor and resources and ensured construction compliance with the plan
-Established and implemented work schedules and adjusted them to meet project deadlines
-Attending weekly site walks with managements
January 2018 - July 2018
-Inspect and monitor progress at construction sites
-Make daily decisions about construction activities
-Plan and schedule construction work and assign work to labor and staff
-Maintained records of labor and resources and ensured construction compliance with the plan
-Established and implemented work schedules and adjusted them to meet project deadlines
-Coordinate and follow all subcontractors work on daily base October 2017 – January 2018