JONATHAN GRIFFITHS
**** ******** *** ******** ******** Phone 780-***-*****Email *************@*****.***
Professional Summary
Experienced and driven coordinator with 17 years of trade experience as a steamfitter and 10 years’ experience in
construction management/construction coordination, from fabrication shops, module yards, site installation,
commissioning start up and day to day maintenance. A proven track record of successfully managing multi-million
dollar projects from conception to fruition. The ability to coordinate various trades, build partnerships, and work
collaboratively with engineers, vendors, and contractors to ensure all projects are completed on time and on
budget.
Core Competencies:
Scheduling Estimating Quantity survey
Bluebeam Smart plant review Excel
Maximo Navis works Word
S.A.P Power point P6
Suncor Energy
Project Coordinator Underground Utilities January 2020-present
Working with operations to ensure minimal disruption to production while maintaining safety record
Build work scopes for execution against the short and long-range schedules
Scheduling, preventive maintenance, D2D maintenance and any emergency work that arises
Executed work packages for turnaround activities, and scheduled regular smaller unit outages for service work
Support the generation of KPI reports
Created system to track progress and identifying issues that can be modified in future outages to save cost
Increase equipment availability and reliability, by developing improved competences which reduced equipment cost
Ensure that work plans are designed to safely operate without impact to employees, the business, and environment
Assemble ready to execute job packages to the contractor performing the work, and tracked progress to show hours earned
vs burned
Identify and escalate all critical issues to ensure the successful execution of work
Improve the efficiency of the planning process by developing and using standard jobs as templates
Complete Work Management reports to communicate status to management team
Held weekly schedule meetings with contractors to identify any issues of conflicts in schedule
Canadian Natural Resources limited
Project Coordinator Horizon Upstream Major Projects February2019- present
Assembling field installation work packages for the contractor.
Reviewing drawings and verifying material quantities.
Using material take offs to estimate work and verifying contractors estimates to ensure accuracy
Executed work packages for turnaround activities, including break in activities
New construction scheduling that ties in to outage scope and aligning the two activities
Tracking contractors cost and schedule to ensure that milestones are being achieved on time and on budget
Scheduled and planned work for teams to complete during emergency maintenance /turnaround situations
Daily site visits to ensure and promote site safety rules
Reporting any deviation from targets to develop corrective actions in future outages.
Worked directly with contractor’s material coordinator to ensure that long lead items were being ordered
Providing technical assistance to the contractor when needed to streamline mechanical issues
Developed a preventative maintenance schedule for the static equipment in operating units
Planned turnaround activities in froth treatment for the 2019 turnaround
Bird Fabricators
Mechanical Coordinator May 2018- February 2019
Build installation work packages to sequence work for mechanical buildings and modular assembly
Coordinated various sub trades to ensure buildings were completed on time and to standard
Review and track contractors lems to ensure accurate billing of completed work
Created project bill of material, and ordered all piping materials needed for fabrication
Created smaller work packages, in a priority sequence to streamline fabrication
Created fabrication schedule, and mechanical installation schedule for module yard and fabrication shop
Assisted quality department with building hydro test packages and turnover documentation
Coordinated trucking/transport of modules to various sites over Alberta and British Columbia
Completion of all red line drawings and field changes
PCL Industrial
Commissioning Coordinator January 2016-May 2018
Working directly with project engineers to establish safe work practices for the oxygen system being
Constructed/commissioned
Responsible for planning and directing commissioning activities at the North West Refinery
Scheduled-planned steam blows, air blows and witnessing activities to ensure the work was being performed to code
Verifying that all safe work permits were being followed and in compliance
Holding daily coordination meetings with contractors to prioritize work and review safe work permits
Daily walk downs with contractor to show scope of work on permit
Working with operations to build isolation certificates
Checking contractors force reports to verify accuracy in attendance
Developed safe work procedures for the introduction of oxygen in piping system
Performed mock evacuations to train staff in emergency response
Kiewit Energy Canada
Work Phase Planner-Module Yard Coordinator March 2014-Dec 2015
Working directly with construction manager, taking p6 schedule and assembling field installation work packs based on
schedule
Planning out fabrication sequence so that spooling was being built in sequence to modules
Organizing the bag and tag program so that all material needed was verified as received and issued in priority
Tracking quantities installed by mechanical crews, to give management the crews daily performance factor (pf)
Strategic planning to ensure all crews were achieving the required performance factor
Ordering material in advance for foreman and identifying any delays in material,
Pre populating weld and bolt mapping to allow foreman more time in the field supervising
Use of the 3d model program navis works to verify that field welds are in accessible locations, or if welding could be
complete in shop saving time and accelerating schedule
Coordinated hydro testing of spools that could be tested in laydown prior to being installed in modules and all in module
hydro testing
Participated in final walk down of modules prior to shipping to identify any outstanding items to be completed
Kiewit Industrial Canada
Nitrogen Helium Testing Superintendent August 2013-March2014
Identify project scope and duration and build schedule to achieve completion target
Manpower loading project based on quantity of hours and schedule duration
Ensure that employees are trained and competent to perform work
Conduct weekly subcontractor scheduling meetings and holding all the trades to dates agreed upon
Holding weekly schedule and production meetings, identifying any roadblocks and removing obstacles before they become
an issue
Contract negations, and change management
Hosting company weekly safety meeting along site safety department
Ensure Job Plans that are created that are fit for purpose for the complexity of the work needing to be done.
Responsible for creating and sustaining safe work practices, and enforcing disciplinary action when procedures are not being
followed
Phoenix Industrial
Module Yard General Foreman May 2011-July 2013
Evaluated schedule requirements issued by construction manager and placed crews on critical work fronts to maintain
●
schedule
Supported superintendent to solve technical problems and improve performance factors of piping crews
●
Daily site inspections to ensure mechanical crews were working safe and following site safety procedures
●
Working directly with Q.A department to progressively turn over work documents
●
Recorded daily progress and tracked quantities being installed
●
Daily time sheets and attendance tracking
●
Submit RFI and submit all paperwork to document time for change management
●
Sign off on mechanical completion documentation
●
EDUCATION
Red seal journeyman steamfitter/pipe fitter
•
Over 12 years’ experience as a supervisor from fabrication shops to commissioning live plants
•
10 years’ experience in work face planning/mechanical coordinator /construction management roles
•
Leadership for excellence in safety certification
•
Zoom boom operator certificate
•
AWP certificate
•
Fall arrest
•
Risk management
•
Crosby rigging certification
•
Certified in fiberglass reinforced pipe
•
REFERENCES : Available upon request