CURRICULUM VITAE
PERSONAL DATA
SURNAME : Akgun
NAME : Necmi
PROFESSION : Class 1 Surface Orientated Diver Inshore /Offshore DATE OF BIRTH. :19.02.1978
ADDRESS : Gdansk /Poland
MOBILE TEL : +48-605-***-***
E-MAIL : ************@*****.***
NATIONALITY : REPUBLIC OF TURKEY
LANGUAGES : Turkish as native, English advanced
DRIVING LICENSE : Class C
PROFESSIONAL & QUALIFICATIONS
EDUCATION : High School(electronic vocational)
DECOMPRESION CHAMBER OPERATER : Norwegian School Of Commercial Diving (NYD)
SURFACE ORIENTED DIVER : Certificate NO 01386 Norway (NYD)
SURFACE ORIENTATED DIVER PETROLEUM SAFETY,
AUTHORITY NORWAY. : Certificate NO 02099 Norway (NYD)
IDSA LEVEL 3 – SURFACE SUPPLIED OFFSHORE AİR DİVER. : Certificate NO 5360 Norway (NYD)
CLASS 1- SURFACE ORIENTATED DIVER INSHORE AND,
OFFSHORE TO 50 METER. : Certificate NO 02099 Norway (NYD)
ADAS PART 2- SURFACE SUPPLIED DIVER 30 METER :Certificate N0 09530 Turkey
BASIC OFFSHORE SAFETY INDUCTION &EMERGENCY,
TRAINING ( BOSIET &HUET). :Expiration Date 26 .05.2023 Poland
BASIC H2S TRAINING :Expiration Date. 26 .05.2021 Poland
SEAMAN’S BOOK (Turkish Maritime Ministry) :Epriration Date. 3 .09.2024
WORK EXPERIENCES
PROJECT = Independent Power Plant 3927 MW Marine Works
CLIENT. =Huta Marin,Hajr Electricity Production Company Samsung C&T Engineering
SCOPE OF WORK=Intake and Discharge,Shore Protection
LOCATION. =Qurayyah Saudi Arabia
DURATION. =November 2019,Present ….
PROJECT = Jeddah South Thermal Power Plant (Stage 1) Marine Works
CLIENT. =Huta Marine,Saudi Electricity Company Hyundai Heavy Industries Co.Ltd.
SCOPE OF WORK=Dredgıng and reclamation,Intake system,fuel unloading jetty.
LOCATION. =Jeddah Saudi Arabia
POSITION. = Dıver
DURATION. =November 2018,July 2019
PROJECT = King Abdullah Port Completıon with block Installation
CLIENT = Huta Marine,Port Development Company ( PDC)
SCOPE OF WORK =Sea floor leveling and block placement (Long term project about 5 years)
LOCATION = Rabigh Saudi Arabia
POSITION. =Dıver
DRATION =April 2014,September 2018
PROJECT = Installation of subsea pipelines associated with block 4 and Installation of
12”,14”,18”,20” lines
CLIENT = Deep Offshore TR-Momentum Engineering LLC-Dragon Oil TM
SCOPE OF WORK = Metrology,Subsea clamps,risers,spool piece Installation air diving task
LOCATION = Lam Field Offshore Turkmenistan
POSITION = Lead Diver
DURATION = February,March,April,May,June,July 2013
PROJECT = Berthing area sounding survey at Giresun Port
CLIENT = Catoni Maritimes Agencies-Modu –Deep Offshore TR
SCOPE OF WORK = Air diving task
LOCATION = Gresun Port- Black Sea Turkey
POSITION = Lead Diver
DURATION = September 2012
PROJECT = 2800 MW PP2 Multiple Sea Water Intake Lines Installation
CLIENT = Deep Offshore TR-Huta Marine-Doosan
SCOPE OF WORK = Air Diving Servises
LOCATION = Red Sea Rabigh KSA
POSITION = Lead Diver
DURATION = May 2012
PROJECT = 20” Transmission Line Damage Survey
CLIENT = Al-Khafji Joint Operations-Deep Offshore TR
SCOPE OF WORK = Pipeline urgent leakage inspaction&ut survey
LOCATION = Offshore Al-Khafji; Kingdom of Saudi Arabia
POSITION = Diver
DURATION = April 2012
PROJECT = Antalya Marine Terminal Subsea Pipeline&CBM System IRM
CLIENT = Deep Offshore TR-SHELL TURKAS
SCOPE OF WORK = Air Diving Task
LOCATION = Antalya Turkey
POSITION = Lead Diver&Panel Operator
DURATION = May,June 2012
PROJECT = Derince Terminal Jetty&Loading Platform Piles Inspection
CLIENT = Deep Offshore TR- SHELL TURCAS
SCOPE OF WORK = underwater cp&ut Inspection
LOCATION = Derince Turkey
POSITION = Lead Diver
DURATION = April,May 2012
PROJECT = Deepwater Champion Berting Area Sounding Surveys and UWILD
CLIENT = Deep Offshore TR- Catıni Maritime Agencies-TRANSOCEAN
SCOPE OF WORK = Underwater Inspection in Lieu of Dry Docking&Debris removal
LACATION = Black sea Samsun port- Southern Sea of Marmara Bandırma Turkey
POSITION = Diver
DURATION = April 2012
PROJECT = Rabigh IPP Sepco III Intake & Outfall Structures lines Installation
CLIENT = Deep Offshore TR-Huta Marine- SEPCO
SCOPE OF WORK = Box calwerds installation,Gravel beding
LOCATION = Rabigh Red Sea Coast KSA
POSITION = Lead Diver & Shift Representative
DURATOIN = November,December 2011
PROJECT = BP Gas Dörtyol Terminal CBM IRM Works and Flexible Hose Replacement
CLIENT = Deep Offshore TR- BP TR
SCOPE OF WORK = Air diving task
LOCATION = Dörtyol Eastern Mediterranean Turkey
POSITION = Diver
DURATION = October 2011
PROJECT = 20” Pipeline Coating Repair and Inspection
CLIENT = Deep Offshore TR-Momentum Engineering LLC- Dragon Oil TM
SCOPE OF WORK = Air Diving Services
LOCATION = Lam Field Caspean Sea Offshore Turkmenistan
POSITION = Diver
DURATION = April,May 2011
PROJECT = Liev Eiriksson Semi Submersible Platform IRM& ICCP Installation
CLIENT = Deep Offshore TR- UMC International PLC-OCEAN RIG
SCOPE OF WORK = ICCP Installation IRM Air diving task
LOCATION = Beşiktaş Shipyard Altınova East Marmara Turkey
POSITION = Lead Diver
DURATION = March,April 2011
PROJECT = Marmaray Immersed Tunnel Access Shaft and Temporary Jetty Removal
CLIENT = Deep Offshore TR-Taisei JP Corporation-DLH
SCOPE OF WORK = Underwater Cutting Brocco
LOCATION = Istanbul Bosphorus Turkey
POSITION = Lead Diver
DURATION = July,Agust,September 2010
PROJECT = BP Gas Flexible Hose Replacement
CLIENT = Deep Offshore TR-BP TR
LACATION = Dörtyol LPG Storage Eastern Mediterranean Turkey
SCOPE OF WORK = Submarine hose maintenance,mooring buoy subsea survey and hook
replacement
POSITION = Lead Diver&panel operator
DURATION = December 2009,February 2010
PROJECT = Ayazlı Platfrom Buoyancy Tanks Removal
CLIENT = Deep Offshore TR-Momentum Engineering LLC-TPAO
SCOPE OF WORK = Mixed gas deep water diving task(water depth 85m)
LOCATION = Offshore Black Sea Turkey
POSITION = Lead Diver
DURATION = November 2009
PROJECT = Underwater Cathodic Protection IPPC System Survey
CLIENT = Deep Offshore TR-Corrocont Hungary-BTC BP
SOCPE OF WORK = Air diving task
LOCATION = Haydar Ali Marine Terminal Ceyhan Adana Turkey
POSİTİON = Lead Diver
DURATION = September,November 2009
PROJECT = SBM Underwater Inspection in Lieu of Dry Docking
CLIENT = Deep Offshore TR-SBM INC-Petronas
SCOPE OF WORK = FSO MOPU UWILD underwater Inspection
LOCATION = Block 1 Field Offshore Caspian Sea Turkmenistan
POSITION = Lead Diver
DURATION = July 2009
PROJECT = BP Gas Subsea Pipeline and Flexible Hose Repair
CLIENT = Deep Offshore TR- BP TR
SCOPE OF WORK = Air diving task
LOCATION = Dörtyol Eastern Mediterranean Sea Turkey
POSITION = Lead Diver
DURATION = September,October 2008
PROJECT = Istanbul Bosphorus Freshwater Crossing
CLIENT = Istanbul Sea of Specialized Courts-Deep Offshore TR
SCOPE OF WORK = Damaged section cctv survey&expertise
LOCATION = Istanbul Bosphorus
POSITION = Diver expert
DURATION = November2008
PROJECT = DLH/TAISEI JP MARMARAY ISTANBUL BOSPHORUS TUBE CROSING
CLIENT = Deep Offshore TR- Taisei JP
SCOPE OF WORK = Element No 1 Immersion mixed gas diving task(water depth 60m)
LOCATION = Istanbul bosphorus
POSITION = Safety Officer&Diver
DURATION = November 2008
PROJECT = MDP-A wellhead platform Installation,piling and grouting support
CLIENT = Dragon Oil-Momentum Engineering UEA-Deep Offshore TR
SCOPE OF WORK = Jeket installation&pile guide cutting by broco
LOCATION = Offshore Turkmenbashi Caspian sea
POSITION = Diver
DURATION = December 2007,June 2008
PROJECT = BP Gas Mooring System Upgrade,Pipeline IRM Flexible Hose Rplcmnt
CLIENT = Deep Offshore TR- BP TR
SCOPE OF WORK = Air diving services
LOCATION = Dörtyol Eastern Mediterranean Sea Turkey
POSITION = Diver
DURATION = April,june 2008
PROJECT = DLH/TAISEI JP MARMARAY ISTANBUL BOSPHORUS TUBE CROSING
CLIENT = Deep Offshore TR- Taisei JP
SCOPE OF WORK = Element No 2 Immersion Miexed Gas Diving Task(making marmaray the
Deepest immersed tunnel in the world) water depth 61m
Element No 3 Immersion Mixed Gas Diving Task water depth 60m
Element No 4 Immersion Mixed Gas Diving Task water depth 57m
LOCATION = Istanbul Bosphorus Turkey
POSITION = Safety Officer&diver
DURATION = August,July,June,May,April 2008
PROJECT = Ayazlı platform 12” Subsea Spool Tie-in
CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR
SCOPE OF WORK = Mixed gas diving task water depth 85 meter
LOCATION = Offshore Akçakoca Western Blac Sea Turkey
POSITION = Diver
DURATION = June 2007 - March 2008
PROJECT = Ayazlı Tripod Platform Installation
CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR
SCOPE OF WORK = Deep diving and rigging support services for tripod platform
İnstallation mixed gas water depth 85 meter
LOCATION = Offshore Akçakoca Western Blac Sea Turkey
POSITION = Diver
DURATION = April,May 2007
PROJECT = DLH/TAISEI JP MARMARAY ISTANBUL BOSPHORUS TUBE CROSING
CLIENT = Deep Offshore TR- Taisei JP
SCOPE OF WORK = Element No 6 Immersion Mixed Gas Diving Task water depth 55meters
Element No 7 Immersion air diving task water depth 50 meters
LOCATION = Istanbul Bosphorus Turkey
POSITION = Safety Officer&diver
DURATION = October2007 February 2008
PROJECT = Ayazli Tripod Platform Installation
CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR
SCOPE OF WORK = Deep diving and rigging support mixed gas services water depth 85meters
LOCATION = Offshore Akçakoca Western Blac Sea Turkey
POSITION = Diver
DURATION = April 2007 - May 2007
PROJECT = DLH/TAISEI JP MARMARAY ISTANBUL BOSPHORUS TUBE CROSING
CLIENT = Deep Offshore TR- Taisei JP
SCOPE OF WORK = Element No 8 Immersion Air Diving Task water depth 52 meters
Element No 9 Immersion Air Diving Task water depth 50 meters
Element No 10 Immersion Air Diving Task water depth 45 meters
Element No 11 Immersion Air Diving Task water depth 40 meters
Access Shaft Installation&Survey Towel Removal
LOCATION = Istanbul Bosphorus Turkey
POSITION = Diver
DURATION = March,April,May,June,July,August 2007
PROJECT = East Ayazlı Tripod Platform Installation
CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR
SCOPE OF WORK = Deep diving and rigging support services for East Ayazlı tripod platform installation Mixed gas services water depth 75meters
LOCATION = Derince Port, Eastern Sea of Marmara & Offshore Akçakoca, Western Black Sea; Turkey
POSITION = Diver
DURATION = October 2006 - December 2006
PROJECT = Cooling Water Intake Pit Survey and Repair
CLIENT = Botaş LNG-Deep Offshore TR
SCOPE OF WORK = Cooling water intake pit survey and B1 intake pit gate repair
LOCATION = M.Ereğlisi, Tekirdağ; Turkey
POSITION = Diver
DURATION = July 2006
PROJECT = Akkaya Tripod Platform Installation
CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR
SCOPE OF WORK = Deep diving and rigging support services for Akkaya tripod platform installation mixed gas diving water depth 60 meters
LOCATION = Derince Port, Eastern Sea of Marmara & Offshore Akçakoca, Western Black Sea; Turkey
POSITION = Diver
DURATION = May 2006 - August 2006
February 2006 - November 2008
Taisei Corporation / Marmaray Railway Immersed Tunnel Construction
Bosphorus Strait, Istanbul; Turkey
Air and mixed gas diving services for tunnel inspection, installation & removal, construction support, and vessel inspection
SARIII IRM&Anchor Removal Diver
KK Power Cable Route Survey&Insatallation Divrr
Dry Dock Gate Removal & Reinstallation Diver
Kanyu,Kammon,Ecem Sultan IRM Diver
Temporary Jetty Sea Bed Survey&Scour Protection Diver
Trench Backfill Meterial Sampling Diver
Kanyu Stational Anchor Installation Diver
RDCP Survey Equipments Installation Diver
SARIII Anchors Recovery Diver
Elements 11,10,9,8,7,6,5,4,3,2,1 pre-immersion prepation Lead Diver
Elements 11,10,9,8,7,6,5,4,3,2,1’s Jack Frame Installation Diver
SARIII Backfilling Inspection Diver
Soil Sampling&cctv survey Lead Diver
Dump Barge,Kanyu,Kanmon Damage Survey Diver
Obstruction Survey&soil sampling on the tunnel route Diver
Wreck Removal operation on the tunnel route Diver
Subsea Hydrograpic equipment survey Diver
PROJECT = Mooring System, Subsea Pipeline, and Flexible Hose IRM
CLIENT = Petrol Ofisi A.Ş-Deep Offshore TR
SCOPE OF WORK = inspection, repair, and maintenance
LOCATION = Mudanya Terminal - Eastern Sea of Marmara, Bursa; Turkey
POSITION = Diver
DURATION = November 2006
PROJECT = Subsea Pipeline Repair Works
CLIENT = Total Oil TR-Deep Offshore TR
SCOPE OF WORK = Subsea pipeline leak inspection and repair
LOCATION = Haramidere Marine Terminal - Sea of Marmara, Istanbul; Turkey
POSITION = Diver
DURATION = November 2005
,2004-2005
Deep Offshore TR Call out Diving Sevices (Ship Yard Serv.. I.R.M serv. Shipping Serv..)
Ud-octopus Diving Scholl Marmaris Turkey Scuba Instructor&Guide
PROJECT = Drilling Support Diving Services
CLIENT = Madison Oil-Ortadoğu Denizcilik-Deep Offshore TR
SCOPE OF WORK = underwater cutting, welding, and installation
LOCATION = Offshore Karadeniz Ereğlisi, Western Black Sea; Turkey
POSITION = Diver
DURATION = October 2005
PROJECT = Offshore Loading Platform and Subsea Pipeline IRM
CLIENT = Tüpraş-Deep Offshore TR
SCOPE OF WORK = Offshore loading platform and subsea pipeline inspection, repair and maintenanceSubsea pipeline repair clamp, subsea cable and support clamp installation
LOCATION = Offshore İzmit, Sea of Marmara; Turkey
POSITION = Diver
DURATION = September - December 2005
PROJECT = Wreck Removal
CLIENT = Taisei Corporation-Deep Offshore TR
SCOPE OF WORK = Diving services for wreck removal on Marmaray Immersed Tunnel route
LOCATION = Bosphorus Strait, Istanbul; Turkey
POSITION = Diver
DURATION = July - August 2005
PROJECT = Grounding Damage Inspection and Debris Survey
CLIENT = Taisei Corporation-Deep Offshore TR
SCOPE OF WORK = M/T Kanmon Maru grounding damage inspection at DLH Port
DLH Port debris and slipway subsea survey
LOCATION = Bosphorus Strait, Istanbul; Turkey
POSITION = Diver
DURATION = January 2005 - January 2005
PROJECT = Soil Surveys and Sensor Recovery Operations
CLIENT = Taisei Corporation-Deep Offshore TR
SCOPE OF WORK = Subsea inspection with hydrological survey equipment
Survey of two shipwrecks on Marmaray Immersed Tunnel route
Soil sampling on three locations on Marmaray Immersed Tunnel route
Propeller and rudder survey on M/T Kanmon Maru
Search and recovery of current sensor
LOCATION = Bosphorus Strait, Istanbul; Turkey
POSITION = Diver
DURATION = December 2004 - November 2005
PROJECT = Subsea Cutting at Royal Marina
CLIENT = Jordan Royal-Bektaşoğlu construction A.Ş -Deep Offshore TR
SCOPE OF WORK = Subsea cutting and removal of jetty at Royal Marina
LOCATION = Aqaba; Jordan
POSITION = Diver
DURATION = August 2003 - September 2003
PROJECT = Sugözü Power Plant Subsea Anode Installation and CP Survey
CLIENT = Simens- Gama-Tekfen JV- Deep OFFSHORE TR
SCOPE OF WORK = Jetty AWS D3.6 certified subsea anode installation at Sugözü Power Plant Intake & outfall maintenance and cathodic protection survey at Sugözü Power Plant
LOCATION = Yumurtalık, Eastern Mediterranean Sea, Adana; Turkey
POSITION = Diver
DURATION = October 2002 - July 2003
PROJECT = Thrace Power Plant Intake Pipeline Marine Growth Removal
CLIENT = Unimar JV- Middle East Diving Service
SCOPE OF WORK = Air diving services
LOCATION = Marmara Sea Tekirdag Turkey
POSITION = Diver
DURATION = November 2002
PROJECT = Sea Dream Salvage Operation
CLIENT = Paspandou Co.- Deep OFFSHORE TR
SCOPE OF WORK = Salvage operation for Sea Dream
LOCATION = Alexsandra Egypt
POSITION = Diver
DURATION = October 2002 - October 2002
PROJECT = Kuzey Marmara Platform Jacket and Spool Piece Inspection
CLIENT = TPAO (Turkish Petroleum Corp.)- Deep OFFSHORE TR
SCOPE OF WORK = Jacket and spool piece inspection at Kuzey Marmara Platform
LOCATION = Silivri, Sea of Marmara, Istanbul; Turkey
POSITION = Diver
DURATION = June 2002 - June 2002
PROJECT = Botaş LNG Terminal-Deep Offshore TR
CLIENT = Cathodic Protection Survey
SCOPE OF WORK = LNG loading jetty pile cathodic protection survey
LOCATION = Marmara Ereğlisi, Sea of Marmara, Tekirdağ; Turkey
POSITION = Diver
DURATION = March 2001 - March 2001
PROJECT = Kuzey Marmara Platform Spool Piece Inspection and Anchorpipe Installation
CLIENT = TPAO (Turkish Petroleum Corp.)-Deep Offshore TR
SCOPE OF WORK = Jacket and spool piece inspection at Kuzey Marmara Platform
LOCATION = Silivri, Sea of Marmara, Istanbul; Turkey
POSITION = Diver
DURATION = November 2000 - July 2001