Post Job Free
Sign in

Cswip 3.2.1 (Senior Welding Inspector ( Bgas Grade 2 Painting)

Location:
Patna, Bihar, India
Posted:
August 11, 2020

Contact this candidate

Resume:

Candidate Name-Surendra Prasad

QA/QC Multi Discipline Inspector (senior)

Email : *********@*****.*** / *********.******@*****.** (official)

GSM : +968-********/97192104, +91-954*******

Address: C/o APPLUS VELOSI LLC, P.B-261, P.C-131, Hamriya, Muscat, Sultanate of Oman.

OBJECTIVE : pile Up Experience & Knowledge day by day and implementing in the professional life.

# 21+ years of Working Experience in Construction/Quality control of Refineries, multiproduct pipelines, fabrication and Installation of offshore platforms & Decks for Oil & Gas industries,

Tank Inspection, petrochemicals, power plants, LNG plant and fertilizer. Work involved Review & Approving of procedure’s, Specifications, ITP’s, Method statements, WPSs, work instructions, and carry out in process inspection and subsequent reporting. Qualifying welders, Test packs control, NDT control, monitoring welder’s performance etc.

QUALIFICATION/CERTIFICATIONS HELD:

EDUCATION / COURSE UNIVERSITY / INSTITUTE LEVEL YEAR COMPLETED

Diploma in Mechanical Engineering Naveen Rajkiya Polytechnic, Patna, (Bihar), India First Class 1997

Senior Certified Welding Inspector

(CSWIP 3.2.1) TWI Certification Ltd. U.K. Cert.# 403-***-****

Certified Welding Inspector (AWS QC1) American Welding Society (AWS) Cert.# 081*****-****

BGAS Painting Inspector

Grade-2 TWI Certification Ltd. U.K.

(BGAS ID-619974) Cert.# 84185 2014

RT, UT, MT & PT Southern Inspection Services Visakhapatnam ASNT LEVEL II 2006

HAVING A VALID OMANI DRIVING LICENCE #71573812.

WORK EXPERIENCE : (As various discipline QCI i.e. Mechanical/piping Inspection, pipeline Inspection, Tank Inspection, GRE/GRVE, cement lined piping/fire proofing, painting coating and Insulation Inspection etc.).

Quality Control & Inspection Experience (Summery)

• Review of Project Specifications and procedures, witnessing welding procedure qualification, Welder/operator Qualification tests for FCAW, SAW, and GTAW & SMAW welding processes.

• Witnessing & evaluating destructive tests results at laboratories.

• Reviewing and approving welders certificates and I.D cards

• Physically Verification of Inward Materials and Review of tests certificates.

• Witnessing on-going inspection (welding, painting/coating, insulation etc.) activities during fabrication Erection of various projects, i.e. Refinery, power plant, fertilizer, Gas compression/depletion plant etc.

• Witnessing of on-going activities of various type of Tanks fabrication works as per applicable API design codes (i.e. API 620 & API 650).

• Witnessing of pipeline activities i.e. stringing, welding, lowering, pigging, hydrostatic testing etc.

• Reviewing and Approving procedure Specifications, IFAs, AFC, Weld Maps and NDT Drawings.

• Witnessing inspection of fabrication erection of offshore platforms including welding, Levelling and Dimensional Control of jackets Legs, Decks, WPG and horizontal framing plans.

• Witnessing/review of NDT reports, e.g. (Review of RT films, PT, MT, PMI, Hardness test witness/report review).

• Carry out daily surveillance for production and Quality Control.

• Monitoring/Review of Heat Treatment (Preheat & Post weld heat) on weld and review of PWHT charts.

• Reviewing and Verifying the calibration of measuring instruments, keeping calibration log.

• Carryout pre commissioning checks, review of loop diagrams & approval of Test packs for testing, Line checking, witnessing Hydro / Pneumatic Tests, Re-instatement etc.

• Finally certifying the inspection dossier for the compliance of work as per specifications.

EMPLOYEMENT DETAILS

1. Company : Applus Velosi L.L.C. OMAN.

From January 2012 to till date

Position Held: - Multi Discipline Inspector.

Project Details:- 1) LIWA Plastic Project (LPIC) EPC-1, Steam Cracker with off-site works & Utilities. (till 17th February 2020)

2) MSPP (Muscat sohar Product pipeline) Project.

3) Mussandam Gas Plant Project Khasab (Oman)

4) Zawtika Well-head Development Project, Phase 1A.

(EPCIC OF ZAWTIKA WELLHEAD PLATEFORMS 1, 2 AND 3 WITH SEA LINES)

Top Clients: - 1) Oman Refinery and petrochemical complex. (OQ)

2) Oman Oil Exploration and Production Company LLC. – Oman.

3) PTT Exploration and Production Public Company Limited- Thailand.

4) Petroleum Development Oman.

5) Oman Gas Company LLC. (OGC)- Oman.

Major Responsibilities: -

Presently working for ORPIC at Liwa Plastic Project, EPC-1(steam cracker unit & utility works) and responsible for inspection and monitoring of tanks fabrication and erection activities (including 2 nos double wall ethylene propylene tank 7 nos spare tanks for butane ethylene and polymer storage, cryogenic material storage facilities, utilities chemical storage tank & others) from material receiving inspection to hydro/pneumatic tests and mechanical completions. all GRE/GRVE lines (including sea water, sewer lines, drain lines AOC, OWS lines and also responsible for inspection of underground cooling water lines, process lines in brown field area and painting coating & insulation inspection of MTBE & butane recovery unit & Pygas-hydrotreating unit in accordance established RFI system, project Specification & applicable code/standards.

Worked for Orpic Logistics Company at MSPP (Muscat Sohar Product pipeline) Project. project consist an intermediate storage facility with 14 various diameter storage tanks and three pipelines connecting the two existing refineries in Sohar (18” dia 227 km approx.) and Mina Al Fahal (10” dia 42 km approx) and another 10” diameter pipeline from Jiffnain terminal to Muscat international airport, including truck loading gantry facility in jiffnain terminal with three pumping stations (15 main pumps) in MAF, Sohar & Jiffnain terminal, work involved the review and approval of QCP, Procedures, witness of all mechanical inspections including heat shrink sleeve applications and review of RT films, witnessing hydrotest Etc.

worked for OOCP (Oman Oil Exploration and Production Company LLC.) at Mussandam Gas Plant Project Khasab Oman as QA/QC Piping Inspector (TPI) work involved the Inspection and monitoring of all site QA/QC activities welding and painting Inspection as per approved procedure and ITPs, Including line check, witnessed of PMI, hydro test, Bolt tensioning using hydraulic bolt tensioning machine. Review of PWHT and Hardness Reports, Reinstatement and subsequent reporting to QA/QC Manager.

Worked for Zawtika Wellhead Development Project Phase 1A, Onshore & Offshore project Consist 3 Processing platform integrated with living Quarters, associated intra-field sea lines.

Work involeved the Review of material test Certificates, IFA & AFC Drawings, weld map and NDT Drawings,contractor procedure and method statements,

Recieving Request on Daily basis from contractor, and carry out inspection accordance with project specifications and ITPs.

Physically Verification of Inward Structural and Piping Material for jackets and Decks and piping, Reviewing and approving of Release note, material materials certificats.

Leveling and Dimensional Controls of jackets Legs, Bracings Welded plate Griders and decks.

Monitering for all site production and Quality activities and subsqent reporting for above on daily basis.

2. Company : Bahwan Engineering Co. L.L.C. OMAN (Oil & Gas Div.)

From May 2006 Nov 2011.

Joined as a QA/QC Inspector. Promoted to Sr. QA/QC Inspector in Oct’ 2008.

(Approved by PDO for Two Projects, SRDC, Saih-rawl and GNR, Marmul)

Project Handled:-

1. GNR Production Header and Water flood facilities Project. Marmul (Petroleum Development Oman) – Project consists 3 nos. MSV skid,3 nos. test MPFM, 1 nos. 20000 m3/d deep water disposal pump package,16” 8 kms. GRP pipeline, 16” 1500# 16 kms. CS-PE lined water injection pipelines and CI skid,

2. Saih-rawl compression and depletion Project (Petroleum Development Oman) – Project consists of Installation of four gas compressor, and one Gas Turbine Power Plant.

3. Marmul Polymer Flooding Project (Petroleum Development Oman) – Project consists of Polymer injection Plant & Water treatment Plant.

4. Sohar Fertiliser Project (Mitsubishi Heavy Industries) : Project consists of Ammonia unit (2000MT/day capacity) and two Urea unit (each 1720 MT/day) with conveyor facility to deliver at port.

5. Sohar Power Project (Doosan Engineering): Project consists of three Duel Gas Turbine & Generator of 150 MW each capacity, three HRSG of combine 924 Ton/Hour capacity. One steam turbine of 225 MW capacity, and one desalination plant of 33 MIGD.

Major Responsibilities:

Review of PDO Project SPs, PRs and CPs Preparing Quality documents like ITPs, Method Statement, WPSs, PQRs, Welders Certificates and Ids Cards.

Selection of and controlling of Welding prcesses, welding consumables.

Verification of Parent metals and selection of suitable consumables.

Inward material physical Verification and Review of test Certificats.

Review and Interpretation of Weld Rediographs, PWHT Charts, MT and PT Reports.

Monitering of Welding Activities and Quality control in Fabrication shops and Erection sites.

Preparation and controlling of test packs, witnessing Hydro and pneumatic tests.

Monitering and Inspection of fit ups and weld joints before, during and after welding accordance with WPSs and ITPs.

Monitering Records of Calibration of inspection and Testing Equepments.

Control management and execution of all specified inspection activities as per specification and codes.

Witness procedure and test and interpret result accurately.

Provide sufficient feed back to QA/QC Manager (Head-Office, Coast) on day to day Quality issues.

3. Company :- J & P Overseas Ltd, Libya

From March 2004 to October 2005

Joined as QA/QC Inspector

Project Handled: - Gas Oil Separator Plant (Arabian Gulf and Oil Company, Nafura & sharir)

Major Responsibilities:

Monitering and carry out all Inspection activities on daily basis like fit ups and weld visual inspections.

Monitering and arranging for NDT of all welded joints.

Preparation of test packes and co ordination for the same if any balance.

Arranging and conducting line pre test line checks and Preparation of punch lists, cordination for the same.

Checking test packs folder and approving for hydro and pneumatic test.

Wetnessing the test Signing the folder and turn over documents for Reinstatement and commissioning.

4. Company: - Artson Engineering Ltd. Delhi, India.

From Jan 2002 to Jan 2004

Joined as QC Engineer

Project Handled: - LEF Compressor Project (GAIL INDIA LTD, Vijay pur, Guna, India)

Major Responsibilities:-

Review of Client specification and technical data sheets and preparation of Inspection and test plan.

Wetnessing and arranging for prcedure and welder qualificatins, preparation of WPSs.

All stage wise inspection from material identification to dispatch.

Carri out all stage wise inspection e.g. Joint fit up checks, weld visual inspection and.

Reviewing RT films, witnessing MT/PT on weld joints.

Checking all precommissioning Activities.

Checking for all inspection records and preparation of Quality documents and as built dossier in order to comply with project specifications.

Liaising with third party inspection agency for necessary approval.

5. Company : Singh Engineering Works Pvt. ltd

From Jan 1998 to Dec 2001

Joined as Trainee Engineer and confirmed as Asst. Engineer (QA/QC)

Project Handled: - Gas Cracker Unit (IPCL Dahej, Bharuch-Gujarat, India)

(And IOCL Bajwa Refinery, Vadodara-Gujarat, India)

Major Responsibilities:-

Co-ordination & Inspection of CS, LTCS, SS Piping works.

Inspection and Supervision of all circular plateform of all columns and vessels of this unit.

Inspection and Supervision of all puff Clamp Supports, and others special supports for this unit,

Inspection of compressors and pumps, Heat Exchangers and others Equipment.

Prepartion of all above reports and liasing with client for verification and certifications.

PERSONAL DETAILS.

Date of Birth : 16-Feb-1976

Email : *********@*****.*** and ***********@*****.***

Mobile number : +968-******** / 97192104.

Nationality : Indian

Religion : Hindu

Martial status : Married

Language known : English, Hindi, Arabic

Passport Detail : Passport no : R2388663

Date of issue : 09th May-2017

Date of expiry : 08th May-2027

Place of issue : Muscat (Sultanate of Oman)

Permanent Address : C/o Shyamasundra Prasad,

Village- Baliwan Raemal, P.O-Baliwan sagar.

District – Gopalganj, Bihar, India – 841501.



Contact this candidate