Post Job Free
Sign in

Manager Electrical

Location:
Hyderabad, Telangana, India
Posted:
August 10, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

PAWAN KUMAR MISHRA.

Cell No: +91-701*******

+91-941*******

Email Id: - pawan.aiet012@ yahoo.com

I have over 12 years hand on experience in the various fields of ELECTRICAL ENGINEERING. I am looking forward for a challenging – senior management level – position where I could learn more techniques as well as target set by the Management by stimulating my own skills by through building a robust Team Spirit.

Personal Profile:-

Date of Birth : 01.12.1983

Age : 37 Years

Sex : Male

Nationality : Indian

Marital Status : Married

Languages Known : English & Hindi

Permanent Address : S/o. Mr. SHYAM DHAR MISHRA,

HARIPUR, ABHIYA (P.O.),

SANT RAVI DAS NAGAR BHADOHI (Dist.).

UTTAR PRADESH (State)

Pin code: - 221404

PASSPORT DETAILS:-

Passport No : L6837515

Date of issue : 15/01/2014

Date of expiry : 14/01/2024

Place of issue : Lucknow

QUALIFICATION:-

A. Academic :-

Degree

College & University

Year of Passing

B.Tech (Full Time)

AZAD INSTITUTE OF ENGINREEING AND TECHNOLOGY, LUCKNOW

June 2008,

B. Software:-

Name of the Software

Version

Year of Skill

M.S. Office

XP, WIN 7,8& 10

16 Yrs

C. Training : “ANPARA THERMAL POWER STATION ANPARA, SONEBHADRA. U.P.”

D. Projects : “To Expert Design of transmission line by using facts with

Undertaking SVC (To transmit 500 MW power at distance 300 km).”

E. Extracurricular : “Presented seminar paper on the topic of “predictive Activities engineering Technique.”

Work Experience Period : From Sept 2014 – Till Now

Employer : M/s. Meenakshi Infrastructure Pvt Ltd, Hyderabad.

Position Held : Manager Electrical (In-charge)

Project Place : 1. 24 MW and 96 MW of Hydro Power Project on Palsi River at Palsi- village, Upper Siyang Dist. in the state of Arunachal Pradesh.

2. MEENAKSHI IT BULLDING (DELOITTE) AT MADHAPUR HYDERABAD 500032.

Period : From Jan 2014 – Jun2014

Current Employer : M/s. PCP international Ltd, chandigardh.

Position Held : Sr. Electrical Engg.

Project Place : 660x5 MW PRAYAGRAJ POWER GENERATION CO.LTD (COAL BASED SUPER CRITICAL TPP AT BARA, UP.)

Period : From May 2013 – Dec 2013

Employer : M/s. Magadh Infrastructure Power Ltd. Indor.

Position Held : Sr. Electrical Engg. (In-charge)

Project Place : 33/11 KVA Substation Pariharnagar & Uchchiada village, Jodhapur, Dist. in the state of Rajasthan.

Period : From July 2009 – Apr 2013

Employer : M/s. Meenakshi Infrastructure Pvt Ltd, Hyderabad.

Position Held : Electrical Engg. (In-charge)

Project Place : 1) 12 MW and 24 MW of Hydro Power Project on Kolab River at tentulagumma village, Koraput Dist. in the state of Odisha.

: 2) Project from Badhrak to Balasore – OR III Package in

The state of Odisha.

Period : From July 2007 – June 2009

Employer : M/s. Meenakshi Infrastructure Pvt Ltd, Hyderabad.

Position Held : Electrical Engg.

Project Place : Project from Lakhnadon to Seoni in M.P. (MP-II) in the state of Madhya Pradesh.

Job Description:-

Panel installation & JB installation.

Check gladding termination and ferruling.

Laying H1 cable, Welded cable, Power cable, Elco cable and FO cable.

Check try installation 100mm,150mm, 300mm, 600mm and 900mm, drawings Schematic Diagrams, Logic Diagrams, Cable Schedules and Cable Drum Schedules, Cable Routing and Lay-out Drawings, Cable Trench/Tray Lay-out Drawings.

Testing of Power Transformer, Testing & commissioning of LCS and LT motor.

Testing and commissioning CTs, PTs of LT/ HT Switchgear panel.

Earthling and bare cupper conductor Laying, Check Earth pit for clean Earthling.

LT/HT switch gear panel check no load test & on load test motor.

Lighting & Installation of indoor power distribution board.

Installation of Lighting pole and lighting Fixture.

Check Equipment Earthing cable, Laying Routing.

Plant & Emergency, Lighting etc.

Producing of As Built approved for final document submission.

Erection and installation of power and distribution transformer in substation (33/0.433kv)

To attend the breakdown on substation equipments.

HT cable, LT cable and Control cable lying and termination work.

Erection and installation of MV, LV Panels and bus duct in plant.

ESP electrical erection work & control room penal erection and testing.

Obtain requirement of items from the electrical department & plants.

Substation, Transformer, Motor control system, UPS & DG set.

Maintaining &in-charge FOR 700 KVA (CAT), 500KVA (CUMM) & 380 KVA (CUMM) etc.

Maintaining &in-charge for MIX PLANT (160 TPH), READY MIX CONCRETE PLANT (M25) & WET MIX MACADAM PLANT (160 TPH).

Handle the subcontractor manpower.

Co ordination with client and consultant and dealing with sub- contractor.

Co ordination with engineering, procurement and plant departments to get the drawings, materials and equipments in time for the smooth execution of the project.

Supervise the daily work activities to ensure that work is completed on time with all quality and safety requirements met as per procedure.

Utilize to manpower and try to gain maximum output.

Preparing the reconciliation statements of materials, preparing the reconciliation statements of billing payment to vendor against payment from customer.

Checking the correct usage of Material before erection as per drawings.

Power and Control Cable lying in trenches from substation to substation & s/s to field equipments.

Attending weekly coordination meetings with client along with project manager and resolving the day to day problems rising in the sites.

Project planning, erection and commissioning activities.

Summary:-

Able to work independently and make good technical decisions, working cooperatively, watching out for my teammates, offering helping hand when needed.

Ability to work under pressure.

Eagerness to learn new technologies.

Highly individual with strong team orientation and a “CAN-DO” attitude.

Place:

Date:

(PAWAN KUMAR MISHRA)



Contact this candidate