CV Suresh P_June**** Page * of **
PROFESSIONAL RESUMÉ
Name: PENTAPATI SURESH
Date of Birth: 1965
Nationality: Indian
Qualifications: M. Tech. (Chemical Engineering, IIT Bombay )-1989 B. Tech. (Chemical Engineering, AU College of engineering Vizag)-1987
Languages: English, Hindi and Telugu- verbal and written – fluent Present Location Muscat, Oman
Contact number 009**-********
Email ID ***************@*****.***
SUMMARY OF EXPERIENCE (SKILLS)
Process Design/Engineering
PEFS / PSFS/PFS/Material balance/HAC drawings
Process Calculation and PFD Material balance using HYSYS/UNISIM
Pipeline Steady state hydraulics using PIPESIM
Pipeline Transient Hydraulics using TLNET
Vent line sizing using FLARENET
Dispersion and radiation calculations using Shell FRED
Process datasheets for instruments
Participation in Design Review / Hazop review / IPF review
Chairing of Process design reviews and Hazop for Small to medium size projects on Adhoc basis
Preparation of reports
- Design basis
- Operating philosophy
- Control Philosophy
- Safeguarding philosophy
- Tie-in shutdown philosophy
- Design review and Hazop review reports
- Design review and Hazop review closeout reports
- Adequacy check reports
- Standardization of process calculations (Relief valve sizing calculations- Critical/subcritical/liquid service, Fire load calculations) as part of Continuous improvement drive.
CV Suresh P_June2020 Page 2 of 13
- Cost/Time/ Resources (CTR) NORMS for Petroleum Development oman
- Approved Technical Authority (TA-2) by Petroleum Development Authority for review and approval of Process Deliverables.
- Company (TR Engg LLC) nominated Technical Authority for approving process deliverables.
- Chairing of Process design reviews and Hazop for Small to medium size projects on Adhoc basis
- Secondment experience with Petroleum Development Oman, Toyo Engineering corporation(Japan)
- Process discipline supervisory role, as and when necessary, for the past 10 years.
Computer Literacy
- HYSIS
- PIPESIM
- TLNET/TGNET
- FLARENET
- UNISIM
- MS Office
CV Suresh P_June2020 Page 3 of 13
.
EMPLOYMENT RECORD
June 2008 onwards: TR ENGINEERING CONSULTANCY LLC
Muscat, Sultanate of Oman
Principal /Lead Process Engineer
Worked as Lead engineer for following projects:
Marmul ‘A’ Station Expansion project for Petroleum Development Oman (EPC Contractor: Galfar Engineering & Contracting LLC)
Marmul Gas pipeline liquid handling project for PDO
DD for Additional Surge tank project for PDO
DD for Chemical Injection skids for PDO
Miscellaneous engineering activities under Service Contract for Occidental Mukhaizna
Proposal work for RasLaffan DHT FEED for Qatar Petroleum
Proposal work for NGL Feasibility study for Qatar Petroleum
Proposal work for Installation of Filters for Dubai Supply Authority
Proposal work for Hawqa & Hasirah Field Development Project
Occidental Service contract project involving multiple projects with a team of 7 process engineers
EPCC for MMPS Gas compression Project for PDO with a team of 7 process engineers.
Bf D for MMPS Gas compression Project for PDO with a team of 4 process engineers
Zauliyah station PSM HAZOP project (Hazop participation)
Zauliyah station PSM HAZOP project (Hazop action closeouts)
Sale Oil Tank T-00007C Conversion to Skim tank Project
Bu Hasa Integrated Field Development Project ( Client data review and Hydraulic study related technical queries for Crude gathering network, Wet/Dry gas network, Aquifer network, Water injection/disposal network
FEED for OMIFCO&AL KAMIL PH II (Only technical support)
EPC for installation of Flow control system (Only technical support) Responsibilities include supervision of process design work and preparation of process deliverables, design review meetings. Following are the activities carried out / deliverables prepared.
PEFS / PSFS/PFS/Material balance/HAC drawings
Pipeline Steady state hydraulics using PIPESIM
Pipeline Transient Hydraulics using TLNET
Vent line sizing using FLARENET
Dispersion and radiation calculations using Shell FRED
Process Calculation and PFD Material balance using HYSYS
Process datasheets for instruments
CV Suresh P_June2020 Page 4 of 13
Participation in Design Review / Hazop review / IPF review
Preparation of reports
- Design basis
- Operating philosophy
- Control Philosophy
- Safeguarding philosophy
- Tie-in shutdown philosophy
- Design review and Hazop review reports
- Design review and Hazop review closeout reports
- Adequacy check reports
Working in process discipline supervisory role, as and when necessary. During the tenure following are responsibilities:
- Supervising and reviewing process design work
- Handling proposal works which includes review of client requirements, meetings, preparation of technical proposal and providing Cost Time and Resource (CTR)
- Co-ordination required for Training of Omani Engineers and sometimes training them
- Standardizing of process calculations, check lists, CTR NORMS
- Resource planning within discipline
Lead engineer for FEED for Injection of Khuff Gas to Arab D Gas Cap using North Field Injection Station for Qatar Petroleum. The project scope includes simulation studies for Well head treatment plants, compressor station and gas Pipeline. Following are the activities carried out
Process simulations for Wellhead treatment (Gas treatment) plants for determining temperature set points based on Hydrate formation temperature for various scenarios.
Steady state / Transient Hydraulic simulations to establish compressor suction conditions and there by evaluate compressor suction drum adequacy.
Air cooler studies using HTFS.
Pipeline blow down calculations
Preparation of Heat and Material balance and PFDs, P &IDs, Design basis, study reports, control philosophy, Equipment adequacy checks
Flare Radiation and dispersion calculations using FRED software
Participation in various workshops (Design review, Hazop and SIL studies) Lead engineer for Zauliyah Gas compression Phase-III, an EPC project for PDO. The project scope includes engineering of Gas Dehydration Unit, Gas Dew point control Unit, Refrigeration unit and NGL stabilizer Unit.
Following are the activities involved:
Verification Frond Design Package
Compressor settle out calculations
CV Suresh P_June2020 Page 5 of 13
Blow down calculations
Updating of following Front End Design deliverables
- HYSYS simulations incorporating vendor data
- P &IDs and PFDs
- Process data sheets for Scrubbers, air cooler, compressors, pumps, package units etc
- Process data sheets for instruments
- Operating, Control and safeguarding philosophy
- Flare and Blow down study using FLARENET software
- Flare Radiation and dispersion calculations using FRED software
- Relief valve sizing calculations
- Line list
Review of vendor package and engineering for
- Dehydration Unit, a packaged unit comprising, Glycol(TEG) Contactor, Glycol scrubber, Gas/Glycol heat exchanger, TEG storage and pumping system
- Dew point control unit
- Refrigeration Unit, a packaged unit comprising Propane compressors, condenser, Accumulator, Economiser, Cold gas exchanger, propane chiller, Condensate flash drum
- NGL Stabilizer
- Booster Compressors
2002 – May 2008 MOTT MACDONALD & CO. LLC
Muscat, Oman
Principal Process Engineer
Deputed to Petroleum Development Oman as concept engineer to work for OSE group and responsible for the following:
- Performed Pipeline hydraulics for Marmul-B/C/D/G to Marmul production station pipelines.
- Optimization of the pipelines by applying Life Cycle Cost (LCC)
- Material selection of the pipelines
- Pipeline Hydraulic report
- Identifying various options for Al-Khalata Rationalization involving for Marmul-B/C/D/G and Marmul production station.
- Selection and optimization of the concept
- Concept report
- Control philosophy
- Flare system study
- Hazop
- Inputs to Asset Development Plan
- Gas plant capacity verification study
- Scope of work for Front End Engineering/Detail Design
- Identifying various options
- Evaluating the options using cost inputs
- Identifying uncertainties
CV Suresh P_June2020 Page 6 of 13
- Engineering for packaged items for Dehydration system, Refrigeration, Fuel gas conditioning, Compressors
- Operating manuals
- Process Calculation using HYSYS
- PEFS / PFS
Deputed to Petroleum Development Oman to work with EOR-QA group to support the concept group in the following activities :
- Concept selection – Hydrocarbon gathering : Manifolds vs MSV’s
- Review and optimizing of the Hydrocarbon Gathering Network on PIPESIM
- Concept selection – Waste and produced water streams Disposal; SWD vs DWD
- Concept selection – Gas sweetening process
- Review of FEED contractors proposals to meet the targeted annual steam injection rates
- Material balance for steam and water systems involving Steam Generators (SG) and Heat Recovery Steam Generators (HRSG)
- Test separator Trial Run
- Providing inputs to material selection group
- Providing inputs to FCP group for costing
- Providing inputs to SGS for Availability study
- Summarizing the costs of options
Worked as lead engineer for Northern Oman Gas Project for Occidental Oman (EPC project) Consisting of inlet Booster Compressors, Refrigeration Plant including propane refrigerant compressors (Package Unit), Gas Dehydration (Package Unit), Sales Gas Compressors, custody transfer meter and Sales Gas-Metering Skid on the sales gas pipeline. Following are the activities and deliverable produced.
- P&IDs and PFDs
- Process Calculation using HYSYS
- Process data sheets for equipment
- Process data sheets for instruments
- Review of vendor package
- Operating, Control and Safeguarding philosophy
- Flare system study
- Hazop report
- Engineering for Dehydration Unit, a packaged unit comprising, Glycol(TEG) Contactor, Glycol scrubber, Gas/Glycol heat exchanger, TEG storage and pumping system
- Engineering for Fuel gas conditioning unit comprising Scrubber and electric and electric heater
- Engineering for Refrigeration Unit, a packaged unit comprising Propane compressors, condenser, Accumulator, Economiser, Cold gas exchanger, propane chiller, Condensate flash drum
- Engineering for Booster Compressors and Sales gas compressors CV Suresh P_June2020 Page 7 of 13
- Relief valve sizing calculations
- Line list
- Operating manuals
Worked as lead process engineer for FEED/DD for Mukhaizna Steam trial Project with a capacity 200 tons/day of steam injection per steam generator. Following are the major packages/ activities involved.
- Water treatment unit comprising Clarification, filtration, Nanofiltration, Reverse Osmosis, and Ion Exchange Softeners
- The steam generation unit is supplied with two once-through steam generators, each capable of producing 200 tons/day steam at 8000-14600 kPag and 80% quality, fuel gas conditioning, FD fans, stacks, economisers, boiler feed water pumps, etc. Burner management system, shut down sequences and the safeguarding system.
- Steam line sizing, manifold sizing
- Well Test unit, Well kill system, Casing vent gas system, Flare/Vent system, Waste water disposal system
- Hydraulics for FG line, Diluent line and crude export line
Worked as process engineer for QA Steam project studies. Following are studies performed.
- Dry steam injection verses Wet Steam injection
- Steam network hydraulics
- Water and steam balance
Major Project handled:
Concept support for Al Khalata Rationalization Project
Concept support for Marmul Deep water disposal system
Engineering for Oman Northern Gas Plant for Occidental
Concept support for QA Steam Injection Project
Engineering for Mukhaizna Steam Trial Project
Studies for QA Steam project
DD for Lekhwair South WI Pipeline and facility
FED for 20” Gas pipeline for OGC
FED / DD for Al-Huwaisah Development project – Design of 3-phase Separators
FED / DD for Fahud Upgrardation Project-Design of SMS separators
FED for QA MPS modifications – Design of Wet oil Pipeline/WW pipeline and on-plot pipework
2001 - 2002 GRANHERNE & CO. LLC
Muscat, Oman
Sr. Process Engineer
Worked on the following projects:
CV Suresh P_June2020 Page 8 of 13
Project: Gas balance study for QA Gathering Stations Responsibilities included:
Site visits and discussions with operations to know the bottlenecks for performing the gas balance
Preparation of schematics of the gathering station
Modelling of gas compressors to estimate gas equivalent of the condensate formed in the interstages using HYSYS Process Simulator
Preparation Gas balance spread sheet
Preparation of study report for four QA gathering stations Project: SNGTP Control System Upgrade
Responsibilities included:
Study of existing controls for the gas treatment plant
Identification of bottlenecks of the system
Proposal of control scheme for feed gas pressure control
Proposal of control scheme for export gas header pressure control
Proposal of control scheme for off spec gas flaring
Checking the possibility of hydrate formation while flaring the high pressure flare gas using HYSYS
Preparation of manhour estimates for implementing the schemes under Front End Design
(FED) / Detail Design (DD)
Project: Burhaan Gathering station Phase-II
Responsibilities included:
Preparation of Hydraulic model for water injection lines using PIPESIM-NET simulator.
Preparation of control valve data on the water injection lines. Project: NIMR/RIMA Instrument upgrade
Responsibilities included:
Preparation of P&I diagrams
Project: NIMR C/B pipeline
Responsibilities included:
Participation in HAZOP Study
Preparation of HAZOP study report.
2000 - 2001 SAUDI ARABIAN BECHTEL COMPANY
KSA
Sr. Process Engineer
Project: Conversion of AY-1 Pipeline to Sales gas
CV Suresh P_June2020 Page 9 of 13
Responsibilities included:
Hydraulics of 1000 Km long pipeline using PIPEPHASE simulator
Sizing of Gas super heaters on the upstream of gas turbines using Hysis
Sizing of Relief valves
Preparation of Piping and Instrumentation Diagrams and Process Flow Diagrams
Preparation of process data for control valves and instruments.
Design of blow down system using relief systems per API/ASME codes and standards.
Preparation of Environmental Impact Assessment Report
Preparation of data sheets for Separator, Filters, Gas Super heater Project: Crude Batching
Responsibilities included:
Evaluation of existing pumping system for use with different type of Crude and for increased flow rates using Pressure Profile Suite
Preparation of Hydraulic sketches
Collecting piping information with the help of isometrics and site visits
Preparation of System Curve Vs Single/Multiple pump curves
Schematic Diagrams for crude batching
Preparation of process data for instruments and valves Project: Qatif Pipeline
Responsibilities included:
Generation of crude properties using HYSYS
Preparation of Piping and Instrumentation Diagrams for Gas and Crude pipelines
Preparation of process data for instruments and valves Project: Refinery Waste Treatment
Responsibilities included:
Formulation of Design Basis Scoping Paper based on a Study Report
Pump sizing calculation using PPS
Hydraulic study on influent streams using PIPEPHASE
Site visits
Preparation of Piping and Instrumentation Diagrams and Process Flow Diagrams
Preparation of Process data for instruments, valves
Preparation of specifications for package items
Preparation of vendor quotation requests.
Preparation of As-Built P&I Diagrams
Co-ordination with clients and other disciplines 1998 - 2000 ZAMEL & TURBAG ENGINEERING
KSA
Process Engineer
CV Suresh P_June2020 Page 10 of 13
Worked on the following projects:
Project: Petrokemya Feedstock Propane Pipeline
Responsibilities included:
Hydraulic Study of Propane pipeline using HYSIM
Preparation of Piping and Instrumentation Diagrams and Process Flow Diagrams
Preparation of Fire Hazardous zone Maps
Preparation of data sheets and safety instruction Sheets for propane Shipping pumps
Site visits to locate tie-ins with existing system
Implementation of Surge analysis recommendations
Participation in HAZOP team as Process Engineer and implementation of recommendations
Preparation of Operating Instructions
Preparation of Line Designation Tables
Review of vendor documents for shipping pumps, Gas receivers and scraper traps
Preparation of Process data for instruments and control valves
Co-ordination with client and equipment suppliers Project: Riyadh Crude oil Pipeline
Responsibilities included:
Hydraulic Study using HYSIM
Preparation of Piping and Instrumentation Diagrams and Process Flow Diagrams
Preparation of Fire Hazardous zone Maps
Preparation of data sheets and safety instruction Sheets
Site visits
Implementation of Surge analysis recommendations
Preparation of Line Designation Tables
Preparation of Process data for instruments and control valves Project: ABGP-1/ UBTG-2 Gas Pipelines
Responsibilities included:
Preparation of Operating instructions
Preparation of As-Built P&I Diagrams
Discussions with Proponent regarding plant operation Project: Corrosion Inhibitor Injection for Wells
Responsibilities included:
Preparation of P&I Diagrams
Preparation of Data sheets for Injection tanks and pumps Project: Shedgum Firewater System-Upgrade
CV Suresh P_June2020 Page 11 of 13
Responsibilities included:
Worked as process engineer/project Engineer
Study on existing system
Proposal of changes required as per latest Aramco Standards
Checking of flow/pressure adequacy of upgraded system
Preparation of P&ID for Hypo chlorite Injection System
Co-ordination with client and plant operations
Project: RTDB-1 Diesel / Kerosene Pipeline
Responsibilities included:
Preparation of technical queries
Study on Invitation to Bid document
Estimation of drawings and manhours
1989 – 1998 TOYO ENGINEERING INDIA LTD,
India
Sr. Process Engineer
Project: Mangalore Refinery and Petrochemical Ltd-Expansion Responsibilities included:
Worked as assigned process engineer for hydrocracker, LPG Merox and Kerosene Sweetening
Review and implementation of licensor’s design
Performed line sizing calculations using In-house developed software
Preparation of Process data for instruments and control valves
Sizing of relief valves
Performed safety valve discharge pipe sizing calculations using In-house developed software tool
Review of quotations for Recycle gas compressor, Reactor charge pumps
Site visits
Project: Dew point Control Unit for Petronas Gas
Responsibilities included:
Worked as assigned engineer
Implementation of licensor’s design
Participation in HAZOP team as a process engineer for In-house study
Preparation of HAZOP report using PHA Works
Line sizing calculations
Project: Iso-Butyl Benzene Plant for Vinati Organics Responsibilities included:
Worked as assigned engineer
Implementation of licensor’s design
CV Suresh P_June2020 Page 12 of 13
Preparation of Process data for instruments and control valves
Sizing of relief valves
Preparation of P&I Diagrams for Off-site/Utilities
Pump Head/Line sizing calculations
Site visits
Preparation of line designation tables
Preparation of Write-up on Logic
Project: Titanium Dioxide Plant for Kilburn
Responsibilities included:
Worked as a process engineer
Implementation of licensor’s design
Preparation of Process data for instruments and control valves
Preparation of P&I Diagrams for Off-site/Utilities
Pump Head/Line sizing calculations
Preparation of specifications and Review of Vendor documents for Concentrator, Rotary vacuum Filters, Leaf filters and Calcinator
Project: Chambal Fertilizers and Chemicals Ltd
Responsibilities included:
Worked as process engineer for Ammonia Storage/ handling System and Offsite/Utilities
Performed Basic and Detail design
Prepared P&I and Process Flow Diagrams
Performed flash calculations
Sizing of Saturation drum, Intermediate Flash drum, Condenser and Receiver
Review of vendor documents for compressors
Pre-commissioning and commissioning of Ammonia Handling system
Supervision of Pre-Commissioning and commissioning activities of Utility units
Preparation of enquiry documents for Ammonia compressors, Air compressors, Dryers, Cooling towers
Co-ordination with client and vendors
Technical evaluation of vendor quotations
Site visits
Project: Ammonia Handling Facilities for Duncan
Responsibilities included:
Worked as process engineer on proposal
Performed Basic and Detail design
Prepared P&I and Process Flow Diagrams
Performed flash calculations
Sizing of Saturation drum, Intermediate Flash drum and Receiver CV Suresh P_June2020 Page 13 of 13
Discussions with client
Site visits
Project: HCL Recovery Unit for VCM Plant
Responsibilities included:
Worked as process engineer
Preparation of Technical Specification for package unit based on licensor’s data
Review of bids and evaluation
Review of design of Incinerator, Heat recovery boiler, absorber and HCL strippers
Witness leak test for strippers