Post Job Free
Sign in

Air Diver

Location:
Jeddah, Makkah, Saudi Arabia
Posted:
August 06, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DATA

SURNAME : Akgun

NAME : Necmi

PROFESSION : Class 1 Surface Orientated Diver Inshore /Offshore DATE OF BIRTH. :19.02.1978

ADDRESS : Gdansk /Poland

MOBILE TEL : +48-605-***-***

E-MAIL : ************@*****.***

NATIONALITY : REPUBLIC OF TURKEY

LANGUAGES : Turkish as native, English advanced

DRIVING LICENSE : Class C

PROFESSIONAL & QUALIFICATIONS

EDUCATION : High School(electronic vocational)

DECOMPRESION CHAMBER OPERATER : Norwegian School Of Commercial Diving (NYD)

SURFACE ORIENTED DIVER : Certificate NO 01386 Norway (NYD)

SURFACE ORIENTATED DIVER PETROLEUM SAFETY,

AUTHORITY NORWAY. : Certificate NO 02099 Norway (NYD)

IDSA LEVEL 3 – SURFACE SUPPLIED OFFSHORE AİR DİVER. : Certificate NO 5360 Norway (NYD)

CLASS 1- SURFACE ORIENTATED DIVER INSHORE AND,

OFFSHORE TO 50 METER. : Certificate NO 02099 Norway (NYD)

ADAS PART 2- SURFACE SUPPLIED DIVER 30 METER :Certificate N0 09530 Turkey

BASIC OFFSHORE SAFETY INDUCTION &EMERGENCY,

TRAINING ( BOSIET &HUET). :Expiration Date 26 .05.2023 Poland

BASIC H2S TRAINING :Expiration Date. 26 .05.2021 Poland

SEAMAN’S BOOK (Turkish Maritime Ministry) :Epriration Date. 3 .09.2024

WORK EXPERIENCES

PROJECT = Independent Power Plant 3927 MW Marine Works

CLIENT. =Huta Marin,Hajr Electricity Production Company Samsung C&T Engineering

SCOPE OF WORK=Intake and Discharge,Shore Protection

LOCATION. =Qurayyah Saudi Arabia

DURATION. =November 2019,Present ….

PROJECT = Jeddah South Thermal Power Plant (Stage 1) Marine Works

CLIENT. =Huta Marine,Saudi Electricity Company Hyundai Heavy Industries Co.Ltd.

SCOPE OF WORK=Dredgıng and reclamation,Intake system,fuel unloading jetty.

LOCATION. =Jeddah Saudi Arabia

POSITION. = Dıver

DURATION. =November 2018,July 2019

PROJECT = King Abdullah Port Completıon with block Installation

CLIENT = Huta Marine,Port Development Company ( PDC)

SCOPE OF WORK =Sea floor leveling and block placement (Long term project about 5 years)

LOCATION = Rabigh Saudi Arabia

POSITION. =Dıver

DRATION =April 2014,September 2018

PROJECT = Installation of subsea pipelines associated with block 4 and Installation of

12”,14”,18”,20” lines

CLIENT = Deep Offshore TR-Momentum Engineering LLC-Dragon Oil TM

SCOPE OF WORK = Metrology,Subsea clamps,risers,spool piece Installation air diving task

LOCATION = Lam Field Offshore Turkmenistan

POSITION = Lead Diver

DURATION = February,March,April,May,June,July 2013

PROJECT = Berthing area sounding survey at Giresun Port

CLIENT = Catoni Maritimes Agencies-Modu –Deep Offshore TR

SCOPE OF WORK = Air diving task

LOCATION = Gresun Port- Black Sea Turkey

POSITION = Lead Diver

DURATION = September 2012

PROJECT = 2800 MW PP2 Multiple Sea Water Intake Lines Installation

CLIENT = Deep Offshore TR-Huta Marine-Doosan

SCOPE OF WORK = Air Diving Servises

LOCATION = Red Sea Rabigh KSA

POSITION = Lead Diver

DURATION = May 2012

PROJECT = 20” Transmission Line Damage Survey

CLIENT = Al-Khafji Joint Operations-Deep Offshore TR

SCOPE OF WORK = Pipeline urgent leakage inspaction&ut survey

LOCATION = Offshore Al-Khafji; Kingdom of Saudi Arabia

POSITION = Diver

DURATION = April 2012

PROJECT = Antalya Marine Terminal Subsea Pipeline&CBM System IRM

CLIENT = Deep Offshore TR-SHELL TURKAS

SCOPE OF WORK = Air Diving Task

LOCATION = Antalya Turkey

POSITION = Lead Diver&Panel Operator

DURATION = May,June 2012

PROJECT = Derince Terminal Jetty&Loading Platform Piles Inspection

CLIENT = Deep Offshore TR- SHELL TURCAS

SCOPE OF WORK = underwater cp&ut Inspection

LOCATION = Derince Turkey

POSITION = Lead Diver

DURATION = April,May 2012

PROJECT = Deepwater Champion Berting Area Sounding Surveys and UWILD

CLIENT = Deep Offshore TR- Catıni Maritime Agencies-TRANSOCEAN

SCOPE OF WORK = Underwater Inspection in Lieu of Dry Docking&Debris removal

LACATION = Black sea Samsun port- Southern Sea of Marmara Bandırma Turkey

POSITION = Diver

DURATION = April 2012

PROJECT = Rabigh IPP Sepco III Intake & Outfall Structures lines Installation

CLIENT = Deep Offshore TR-Huta Marine- SEPCO

SCOPE OF WORK = Box calwerds installation,Gravel beding

LOCATION = Rabigh Red Sea Coast KSA

POSITION = Lead Diver & Shift Representative

DURATOIN = November,December 2011

PROJECT = BP Gas Dörtyol Terminal CBM IRM Works and Flexible Hose Replacement

CLIENT = Deep Offshore TR- BP TR

SCOPE OF WORK = Air diving task

LOCATION = Dörtyol Eastern Mediterranean Turkey

POSITION = Diver

DURATION = October 2011

PROJECT = 20” Pipeline Coating Repair and Inspection

CLIENT = Deep Offshore TR-Momentum Engineering LLC- Dragon Oil TM

SCOPE OF WORK = Air Diving Services

LOCATION = Lam Field Caspean Sea Offshore Turkmenistan

POSITION = Diver

DURATION = April,May 2011

PROJECT = Liev Eiriksson Semi Submersible Platform IRM& ICCP Installation

CLIENT = Deep Offshore TR- UMC International PLC-OCEAN RIG

SCOPE OF WORK = ICCP Installation IRM Air diving task

LOCATION = Beşiktaş Shipyard Altınova East Marmara Turkey

POSITION = Lead Diver

DURATION = March,April 2011

PROJECT = Marmaray Immersed Tunnel Access Shaft and Temporary Jetty Removal

CLIENT = Deep Offshore TR-Taisei JP Corporation-DLH

SCOPE OF WORK = Underwater Cutting Brocco

LOCATION = Istanbul Bosphorus Turkey

POSITION = Lead Diver

DURATION = July,Agust,September 2010

PROJECT = BP Gas Flexible Hose Replacement

CLIENT = Deep Offshore TR-BP TR

LACATION = Dörtyol LPG Storage Eastern Mediterranean Turkey

SCOPE OF WORK = Submarine hose maintenance,mooring buoy subsea survey and hook

replacement

POSITION = Lead Diver&panel operator

DURATION = December 2009,February 2010

PROJECT = Ayazlı Platfrom Buoyancy Tanks Removal

CLIENT = Deep Offshore TR-Momentum Engineering LLC-TPAO

SCOPE OF WORK = Mixed gas deep water diving task(water depth 85m)

LOCATION = Offshore Black Sea Turkey

POSITION = Lead Diver

DURATION = November 2009

PROJECT = Underwater Cathodic Protection IPPC System Survey

CLIENT = Deep Offshore TR-Corrocont Hungary-BTC BP

SOCPE OF WORK = Air diving task

LOCATION = Haydar Ali Marine Terminal Ceyhan Adana Turkey

POSİTİON = Lead Diver

DURATION = September,November 2009

PROJECT = SBM Underwater Inspection in Lieu of Dry Docking

CLIENT = Deep Offshore TR-SBM INC-Petronas

SCOPE OF WORK = FSO MOPU UWILD underwater Inspection

LOCATION = Block 1 Field Offshore Caspian Sea Turkmenistan

POSITION = Lead Diver

DURATION = July 2009

PROJECT = BP Gas Subsea Pipeline and Flexible Hose Repair

CLIENT = Deep Offshore TR- BP TR

SCOPE OF WORK = Air diving task

LOCATION = Dörtyol Eastern Mediterranean Sea Turkey

POSITION = Lead Diver

DURATION = September,October 2008

PROJECT = Istanbul Bosphorus Freshwater Crossing

CLIENT = Istanbul Sea of Specialized Courts-Deep Offshore TR

SCOPE OF WORK = Damaged section cctv survey&expertise

LOCATION = Istanbul Bosphorus

POSITION = Diver expert

DURATION = November2008

PROJECT = DLH/TAISEI JP MARMARAY ISTANBUL BOSPHORUS TUBE CROSING

CLIENT = Deep Offshore TR- Taisei JP

SCOPE OF WORK = Element No 1 Immersion mixed gas diving task(water depth 60m)

LOCATION = Istanbul bosphorus

POSITION = Safety Officer&Diver

DURATION = November 2008

PROJECT = MDP-A wellhead platform Installation,piling and grouting support

CLIENT = Dragon Oil-Momentum Engineering UEA-Deep Offshore TR

SCOPE OF WORK = Jeket installation&pile guide cutting by broco

LOCATION = Offshore Turkmenbashi Caspian sea

POSITION = Diver

DURATION = December 2007,June 2008

PROJECT = BP Gas Mooring System Upgrade,Pipeline IRM Flexible Hose Rplcmnt

CLIENT = Deep Offshore TR- BP TR

SCOPE OF WORK = Air diving services

LOCATION = Dörtyol Eastern Mediterranean Sea Turkey

POSITION = Diver

DURATION = April,june 2008

PROJECT = DLH/TAISEI JP MARMARAY ISTANBUL BOSPHORUS TUBE CROSING

CLIENT = Deep Offshore TR- Taisei JP

SCOPE OF WORK = Element No 2 Immersion Miexed Gas Diving Task(making marmaray the

Deepest immersed tunnel in the world) water depth 61m

Element No 3 Immersion Mixed Gas Diving Task water depth 60m

Element No 4 Immersion Mixed Gas Diving Task water depth 57m

LOCATION = Istanbul Bosphorus Turkey

POSITION = Safety Officer&diver

DURATION = August,July,June,May,April 2008

PROJECT = Ayazlı platform 12” Subsea Spool Tie-in

CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR

SCOPE OF WORK = Mixed gas diving task water depth 85 meter

LOCATION = Offshore Akçakoca Western Blac Sea Turkey

POSITION = Diver

DURATION = June 2007 - March 2008

PROJECT = Ayazlı Tripod Platform Installation

CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR

SCOPE OF WORK = Deep diving and rigging support services for tripod platform

İnstallation mixed gas water depth 85 meter

LOCATION = Offshore Akçakoca Western Blac Sea Turkey

POSITION = Diver

DURATION = April,May 2007

PROJECT = DLH/TAISEI JP MARMARAY ISTANBUL BOSPHORUS TUBE CROSING

CLIENT = Deep Offshore TR- Taisei JP

SCOPE OF WORK = Element No 6 Immersion Mixed Gas Diving Task water depth 55meters

Element No 7 Immersion air diving task water depth 50 meters

LOCATION = Istanbul Bosphorus Turkey

POSITION = Safety Officer&diver

DURATION = October2007 February 2008

PROJECT = Ayazli Tripod Platform Installation

CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR

SCOPE OF WORK = Deep diving and rigging support mixed gas services water depth 85meters

LOCATION = Offshore Akçakoca Western Blac Sea Turkey

POSITION = Diver

DURATION = April 2007 - May 2007

PROJECT = DLH/TAISEI JP MARMARAY ISTANBUL BOSPHORUS TUBE CROSING

CLIENT = Deep Offshore TR- Taisei JP

SCOPE OF WORK = Element No 8 Immersion Air Diving Task water depth 52 meters

Element No 9 Immersion Air Diving Task water depth 50 meters

Element No 10 Immersion Air Diving Task water depth 45 meters

Element No 11 Immersion Air Diving Task water depth 40 meters

Access Shaft Installation&Survey Towel Removal

LOCATION = Istanbul Bosphorus Turkey

POSITION = Diver

DURATION = March,April,May,June,July,August 2007

PROJECT = East Ayazlı Tripod Platform Installation

CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR

SCOPE OF WORK = Deep diving and rigging support services for East Ayazlı tripod platform installation Mixed gas services water depth 75meters

LOCATION = Derince Port, Eastern Sea of Marmara & Offshore Akçakoca, Western Black Sea; Turkey

POSITION = Diver

DURATION = October 2006 - December 2006

PROJECT = Cooling Water Intake Pit Survey and Repair

CLIENT = Botaş LNG-Deep Offshore TR

SCOPE OF WORK = Cooling water intake pit survey and B1 intake pit gate repair

LOCATION = M.Ereğlisi, Tekirdağ; Turkey

POSITION = Diver

DURATION = July 2006

PROJECT = Akkaya Tripod Platform Installation

CLIENT = TPAO-Momentum Engineering UAE-Deep Offshore TR

SCOPE OF WORK = Deep diving and rigging support services for Akkaya tripod platform installation mixed gas diving water depth 60 meters

LOCATION = Derince Port, Eastern Sea of Marmara & Offshore Akçakoca, Western Black Sea; Turkey

POSITION = Diver

DURATION = May 2006 - August 2006

February 2006 - November 2008

Taisei Corporation / Marmaray Railway Immersed Tunnel Construction

Bosphorus Strait, Istanbul; Turkey

Air and mixed gas diving services for tunnel inspection, installation & removal, construction support, and vessel inspection

SARIII IRM&Anchor Removal Diver

KK Power Cable Route Survey&Insatallation Divrr

Dry Dock Gate Removal & Reinstallation Diver

Kanyu,Kammon,Ecem Sultan IRM Diver

Temporary Jetty Sea Bed Survey&Scour Protection Diver

Trench Backfill Meterial Sampling Diver

Kanyu Stational Anchor Installation Diver

RDCP Survey Equipments Installation Diver

SARIII Anchors Recovery Diver

Elements 11,10,9,8,7,6,5,4,3,2,1 pre-immersion prepation Lead Diver

Elements 11,10,9,8,7,6,5,4,3,2,1’s Jack Frame Installation Diver

SARIII Backfilling Inspection Diver

Soil Sampling&cctv survey Lead Diver

Dump Barge,Kanyu,Kanmon Damage Survey Diver

Obstruction Survey&soil sampling on the tunnel route Diver

Wreck Removal operation on the tunnel route Diver

Subsea Hydrograpic equipment survey Diver

PROJECT = Mooring System, Subsea Pipeline, and Flexible Hose IRM

CLIENT = Petrol Ofisi A.Ş-Deep Offshore TR

SCOPE OF WORK = inspection, repair, and maintenance

LOCATION = Mudanya Terminal - Eastern Sea of Marmara, Bursa; Turkey

POSITION = Diver

DURATION = November 2006

PROJECT = Subsea Pipeline Repair Works

CLIENT = Total Oil TR-Deep Offshore TR

SCOPE OF WORK = Subsea pipeline leak inspection and repair

LOCATION = Haramidere Marine Terminal - Sea of Marmara, Istanbul; Turkey

POSITION = Diver

DURATION = November 2005

,2004-2005

Deep Offshore TR Call out Diving Sevices (Ship Yard Serv.. I.R.M serv. Shipping Serv..)

Ud-octopus Diving Scholl Marmaris Turkey Scuba Instructor&Guide

PROJECT = Drilling Support Diving Services

CLIENT = Madison Oil-Ortadoğu Denizcilik-Deep Offshore TR

SCOPE OF WORK = underwater cutting, welding, and installation

LOCATION = Offshore Karadeniz Ereğlisi, Western Black Sea; Turkey

POSITION = Diver

DURATION = October 2005

PROJECT = Offshore Loading Platform and Subsea Pipeline IRM

CLIENT = Tüpraş-Deep Offshore TR

SCOPE OF WORK = Offshore loading platform and subsea pipeline inspection, repair and maintenanceSubsea pipeline repair clamp, subsea cable and support clamp installation

LOCATION = Offshore İzmit, Sea of Marmara; Turkey

POSITION = Diver

DURATION = September - December 2005

PROJECT = Wreck Removal

CLIENT = Taisei Corporation-Deep Offshore TR

SCOPE OF WORK = Diving services for wreck removal on Marmaray Immersed Tunnel route

LOCATION = Bosphorus Strait, Istanbul; Turkey

POSITION = Diver

DURATION = July - August 2005

PROJECT = Grounding Damage Inspection and Debris Survey

CLIENT = Taisei Corporation-Deep Offshore TR

SCOPE OF WORK = M/T Kanmon Maru grounding damage inspection at DLH Port

DLH Port debris and slipway subsea survey

LOCATION = Bosphorus Strait, Istanbul; Turkey

POSITION = Diver

DURATION = January 2005 - January 2005

PROJECT = Soil Surveys and Sensor Recovery Operations

CLIENT = Taisei Corporation-Deep Offshore TR

SCOPE OF WORK = Subsea inspection with hydrological survey equipment

Survey of two shipwrecks on Marmaray Immersed Tunnel route

Soil sampling on three locations on Marmaray Immersed Tunnel route

Propeller and rudder survey on M/T Kanmon Maru

Search and recovery of current sensor

LOCATION = Bosphorus Strait, Istanbul; Turkey

POSITION = Diver

DURATION = December 2004 - November 2005

PROJECT = Subsea Cutting at Royal Marina

CLIENT = Jordan Royal-Bektaşoğlu construction A.Ş -Deep Offshore TR

SCOPE OF WORK = Subsea cutting and removal of jetty at Royal Marina

LOCATION = Aqaba; Jordan

POSITION = Diver

DURATION = August 2003 - September 2003

PROJECT = Sugözü Power Plant Subsea Anode Installation and CP Survey

CLIENT = Simens- Gama-Tekfen JV- Deep OFFSHORE TR

SCOPE OF WORK = Jetty AWS D3.6 certified subsea anode installation at Sugözü Power Plant Intake & outfall maintenance and cathodic protection survey at Sugözü Power Plant

LOCATION = Yumurtalık, Eastern Mediterranean Sea, Adana; Turkey

POSITION = Diver

DURATION = October 2002 - July 2003

PROJECT = Thrace Power Plant Intake Pipeline Marine Growth Removal

CLIENT = Unimar JV- Middle East Diving Service

SCOPE OF WORK = Air diving services

LOCATION = Marmara Sea Tekirdag Turkey

POSITION = Diver

DURATION = November 2002

PROJECT = Sea Dream Salvage Operation

CLIENT = Paspandou Co.- Deep OFFSHORE TR

SCOPE OF WORK = Salvage operation for Sea Dream

LOCATION = Alexsandra Egypt

POSITION = Diver

DURATION = October 2002 - October 2002

PROJECT = Kuzey Marmara Platform Jacket and Spool Piece Inspection

CLIENT = TPAO (Turkish Petroleum Corp.)- Deep OFFSHORE TR

SCOPE OF WORK = Jacket and spool piece inspection at Kuzey Marmara Platform

LOCATION = Silivri, Sea of Marmara, Istanbul; Turkey

POSITION = Diver

DURATION = June 2002 - June 2002

PROJECT = Botaş LNG Terminal-Deep Offshore TR

CLIENT = Cathodic Protection Survey

SCOPE OF WORK = LNG loading jetty pile cathodic protection survey

LOCATION = Marmara Ereğlisi, Sea of Marmara, Tekirdağ; Turkey

POSITION = Diver

DURATION = March 2001 - March 2001

PROJECT = Kuzey Marmara Platform Spool Piece Inspection and Anchorpipe Installation

CLIENT = TPAO (Turkish Petroleum Corp.)-Deep Offshore TR

SCOPE OF WORK = Jacket and spool piece inspection at Kuzey Marmara Platform

LOCATION = Silivri, Sea of Marmara, Istanbul; Turkey

POSITION = Diver

DURATION = November 2000 - July 2001



Contact this candidate