Highly skilled and experienced Electrical Engineer as well as having managerial capabilities with a proven record of completing complex projects for a wide variety of corporate clients. Adept at quickly understanding a project’s parameters and requirements.
Professional Experience:-
Experience:
A.)OYOROOMS INDIA PVT LTD. ( June 2019 to present) as Engineering Service Head for Kolkata and West Bengal
Major Responsibilities Undertaken:
1.Repair and maintenance activities of various oyo properties in Kolkata and West Bengal
2.Vendor Management.
3.Leading a team comprising general Managers, Engineering Services Managers, Vendors, skilled technicians.
4.P&L booking.
5.Budgeting.
6.Cost control of Repair and Maintenance work.
7.Co ordination with the central Team.
8.Co ordination with General Managers and Head of Operations
B.) MCNALLY Bharat Infrastructure Ltd.. (January,2012 to April 2018) as Assistant Manager
BOLANI IRON ORE CRUSHING AND CONVEYING PLANT
Major Responsibilities Undertaken:
Cable Sizing Calculation for HT (6.6 KV) & LT Cables (1100 V)
Preparation of Cable tray Layout of MCC Buildings at several areas ( Main plant, Crushing plant, D & Panposh Area)
Preparation of Single line Diagram
Preparation of Earthing Layout and Calculation for Earthing Conductor Size
Illumination Calculation and Preparation of Lighting layout
Preparation of Cable Schedule (Power and Control)
Preperation of equipment Layout of Electrical Buildings
Preparation of Interconnection Chart
Preparation of Purchase Specifications of Electrical Items
Preparation of Electrical Load List
Vendor Drawing Review for various electrical equipment like motors, Panels etc.
Preperation of Bill of Materials for cables, cable trays, earthing materials, lighting etc.
KALINGANAGAR 3 X 67 MW BOP PROJECT
Preparation of Cable tray Layout for CCW System, DM water System, Service Air, Instrument Air System etc.
Preparation of Earthing Layout and Calculation for Earthing Conductor Size
Illumination Calculation and Preparation of Lighting layout for CCW System, DM water System, Service Air, Instrument Air System etc.
Preparation of Cable Schedule of CCW System, DM water System, Service Air, Instrument Air System etc
Preparation of Interconnection Chart.
Preparation of Bill of Materials for cables, cable trays, earthing materials, lighting etc.
Preparation of Purchase Specifications
ACC CEMENT: JAMUL CEMENT PLANT PROJECT
Control of Technical documents
Interaction with site
NOKENG ACID PLANT, SOUTH AFRICA
Pre Bid engineering of Acid Plant.
Major Responsibilities Undertaken
Preparation of Bill of Quantities of Electrical Items.
Transformer Sizing
Cable Sizing.
Illumination Design ( lighting calculation)
Earthing Calculation.
Estimation of price for different electrical items.
CHAMBAL FERTILIZER LTD.
Pre Bid engineering OF Urea Handling Plant
Major Responsibilities Undertaken
Preparation of Bill of Quantities of Electrical Items.
Transformer Sizing
Cable Sizing.
Illumination Design ( lighting calculation)
Earthing Calculation
CHENNAI PETROLIUM CORPORATION LTD.
RESID REFINARRY UPDGRADATION PROJECT.
Major Responsibilities Undertaken
Preparation of Bill of Quantities of Electrical Items.
Transformer Sizing calculation
Cable Sizing ( 6.6 KV system and 415 V system).
Illumination Design
Earthing Calculation
Electrical Equipment layout of MCC building at new coke yard substation)
Electrical Load Calculation
Cable Tray layout of different areas in Process plant and Substations
Single Line Diagram ( 6.6 KV System and 415 Volt System)
Selection of equipment in hazardous area
Review of vendor documents for various electrical items ( HT & LT SYSTEMS)
Co ordination with Vendors.
Approval of drawings from clients.
C.) Lahmeyer International India Private Ltd. (September 2011-December 2011) As Senior Engineer.
September,2011 to December,2011
AL QUARRAYAH COMBINED CYCLE POWER PROJECT
Major Responsibilities Undertaken:
Preparation of Trench Layout
Preparation of Earthing Layout of Substations and Process Areas.
Preparation of Lighting layout
Vendor drawing Review for different electrical items.
Preparation of Earthing Bill of Materials
Preparation of Interconnection Chart
Preparation of Cable Schedule
E)G.S. Engineering and Construction India Private Ltd. (October 2010-September,2011)
From 1st November, 2010 to 31st August: I worked as an Assistant Design
Engineer (Electrical Engineering Department).
Projects:
1.Ruwais 4th NGL Train Project
Major Responsibilities Undertaken:
Preparation of Trench Layout
Preparation of Earthing Layout.
Preparation of Lighting layout (Indoor and Outdoor)
Preparation of Fire Alarm System Layout.
Vendor drawing Review for different electrical items.
2. Wara Pressure Maintenance Project
Major Responsibilities Undertaken:
Illumination Design of the total project and Preparation of Lighting layout
Preparation of Lighting Bill of Materials.
3.Ruwais 4th NGL Train Project
Major Responsibilities Undertaken:
Preparation of Trench Layout
Preparation of Earthing Layout of Substations and Process Areas.
Preparation of Lighting layout
Vendor drawing Review.
Preparation of Earthing Bill of Materials
Preparation of Interconnection Chart
D) Consulting Engineering Services India Private Ltd.
From 23rd July 2007 to 20th October, 2010: I worked as an Assistant Design
Engineer(Power Department).
Projects:
1.Part of the electrical system design of 2 X 210 MW Thermal Power Plant Bakreswar – Unit 4 & 5(Offloaded from BHEL) Project.
Major Responcibilities Undertaken:
Preparation Cable Tray Layouts of different System like DM water System, Service Air, Instrument Air System etc of the plant
Preparation of Cable Schedule of those systems.
Preparation of Cable Tray Occupancy Report.
2.Revamping of Pumping Station in Kolkata Metropolitan Corporation areas
Major Responsibilities Undertaken:
Visit to Pumping Stations under Kolkata Metropolitan Corporation Areas.
Preparation of Single Line Diagram of the existing systems of Pumping Stations of KMC
Developed a new scheme for up gradation and prepared a Detailed Project Report where the total costing for up gradation was also calculated.
3.Uranium ore extraction Plant Project at TUMALAPALLE, KADAPA (Andhra Pradesh) .
Major Responsibilities Undertaken:
Transformer Sizing calculation
Cable Sizing Calculation for HV and LV systems.
HV and LV Panel Sizing Calculation
Cable Tray Sizing
Preparation of single line diagram
Preparation of Cable tray Layout
Preparation of Trench Layout
Preparation of Earthing Layout and Calculation for Earthing Conductor Size
Illumination Calculation and Preparation of Lighting layout
Preparation of Cable Schedule
Preparation of Interconnection Chart
4.Coal Handling System of 2 X 210 MW Power Plant Project at Malwa (Madhya Pradesh).
Major Responsibilities Undertaken:
Transformer Sizing calculation
Cable Sizing Calculation
HV and LV Panel Sizing Calculation
Cable Tray Sizing
Preparation of Cable tray Layout
Preparation of Trench Layout
Preparation of Earthing Layout and Calculation for Earthing Conductor Size
Illumination Calculation and Preparation of Lighting layout
Preparation of Cable Schedule
Preparation of Interconnection Chart
Preparation of Bill of Quantities.
Vendor Drawing Review.
5.Common Utilities/Facilities Berth 3A/3B of Qatar Petroleum.
Major Responsibilities Undertaken:
Transformer Sizing calculation
Cable Sizing Calculation
Cable Tray Sizing
Preparation of Cable tray Layout
Preparation of Trench Layout
Preparation of Earthing Layout and Calculation for Earthing Conductor Size
Illumination Calculation and Preparation of Lighting layout
Preparation of Cable Schedule
Preparation of Bill of Quantities.
Total years of experience : 12 years and 06 Months
Last CTC : 7.87 L PA
Educational Qualifications
Passed Secondary Examination with 87.3% marks from West Bengal Board of Secondary Education in 2001
Passed Higher Secondary Examination with 74.4% marks from West Bengal Council of Higher Secondary education in 2003.
Passed Bachelor of Technology in Electrical Engineering with CGPA 7.93 from West Bengal University of Technology in 2007
DECLARATION:
I consider myself familiar with Electrical Engineering aspects. I am also confident of my ability to work in a team. I hereby declare that all the information furnished above is true to best of my knowledge.
Date : 30.06.2020
Place : Kolkata
( SATRAJIT BANERJEE)