Post Job Free

Resume

Sign in

Sr.piping stress engineer

Location:
Kochi Shi, Kochi, Japan
Posted:
August 06, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

NARASIMMALU.J •E-Mail - ade4rc@r.postjobfree.com

Mobile No. - +91-988*******

SUMMARY

Having total 15+ years of experience in design & Engineering in Oil & Gas, Refinery,

Power Plant and Chemicals. Familiar with international codes and standards ASME B31.3,B 31.1,B31.4,B 31.8 API-610, API-617, API-661, API-650 & En 13480.

Performing and checking of piping stress analysis for critical equipments such as compressors, pumps, columns, reactors, air coolers, heat exchangers etc. Preparation of stress critical line list, spring data sheets, stress reports,Pipe rack, structure and platform loads transferred to civil department. Stress system formation in P&ID as per project guidelines. Review and commenting of Equipment vendor drawings.

DETAIL OF EDUCATIONAL QUALIFICATION:

Academics : 12th Passed with 75% Marks

April 1998

Technical : Diploma in Mechanical Engineering

1st Class, April 2001

B-Tech (Mechanical Engineering)

1st Class, Dec 2010

SOFTWARE KNOWLEDGE

●Stress analysis software: Caesar II version 5.1 to 10.0

●2D Drafting &3D Review software: Navisworks & AutoCAD, micro station

●Support Design Software: Licad V 10.

PRESENT EXPERIENCE

1.Working as Sr.Engineer-Piping Stress with Wood India Pvt Ltd, at Chennai from June 27th 2019 to till the date.

PROJECT : 1, Asorc Naptha Complex (ISBL)

Client & Location : Assiut oil refining & Egypt.

PROJECT : 2, Wax Tower Emission Control.

Client & Location : Honeywell & Texas, United States (US).

PROJECT : 3, Haewene Brim (Blue Water) - (offshore)

Client & Location : Shell & UK.

PROJECTS : 4, Freeport Naphtha Pipeline Upgrade

: 5, Compliance I/O Migration & Lpp Gap Closure

: 6, Dpo Ach Capacity increase.

Client & Location : Dow Chemical Company & Texas (Deer park), US.

PROJECT : 7, Polyamide 12 in Sufficient Amount (PISA)

Client & Location : Evonik & Chemical Park Marl. Germany.

Position Held : Senior Piping Stress Engineer

Duration : June 27th 2019 to 04th of August 2020.

●Performed Static Analysis of Critical Piping System connected Pressure vessels, Pumps, jacketed pipe and support selection for the jacketed pipe.

●Primary Support selection for pipes based on support selection philosophy (by using Sikla support std).

PREVIOUS EXPERIENCE

2.Working as Lead Engineer-Piping Stress with Taal tech India Pvt Ltd, at Bangalore from April 1st 2019 to 26 June 2019

PROJECTS : 1, Shell Tier 3 (GHT) Gasoline Hydrotreater

Client & Location : Clonton, Iowa, United states).

: 2, Singapore NEXBTL Production Increase Capacity, (SGX8, AE-135, SGX-18).

Client & Location : Neste Oil & Singapore

Position Held : Lead Engineer-Piping Stress

Duration : April 1st 2019 to till the date.

●Checking and Updating of Static Analysis of Critical Piping System connected to Pressure vessels, Pumps &Tanks system using Caesar II.

3.Working as Piping Stress Engineer with Results Engineering pvt ltd., at Chennai from December 3th 2018 to Feb 28.02.2019.

PROJECTS : EPCC of Gas Compression Station (GCS) at

Makum oil field & Integrated Development Services for the MBA Field in RJ-ON-90/1 Block

Client and Location : Oil India Limited, India (Assam) & Carin oil and Gas (Vedanta Limited), India (Rajasthan).

Position Held : Stress Engineer-Piping

Duration : December 3th 2018 to 28.02.2019.

4.Performed Static Analysis of Critical Piping System connected to Compressor, Pressure vessels,Pumps &Tanks system using Caesar II.

5.Working as Piping Stress & Support Engineer (contract) with Pe-Aristi Projects and Engineering pvt ltd., at Chennai from February 5th 2018 to 30th Nov2018.

PROJECTS : 2 x 660MW Obra, Jawaharpur & 3x 660mw

Ghatampur Thermal power.

Client and Location : General Electric and India

Position Held : Piping Stress & Support Engineer

Duration : Feb. 5th 2018 to Nov. 30th 2018(10 months)

●Pipe supports Checking & guide the support standard drawing preparation.

●Piping Model review for support clashing.

6.Working as Piping Stress Engineer with Gulf Steel Works at Saudi Arabia from June 5th 2017 to 20.09.18.

PROJECTS : Chemical injection Skid, Gas modular Skid

Client and Location : SaudiAramco, Saudi.

Position Held : Piping Stress Engineer

Duration : June 5th 2017 to 20.09.18

●Review of vendor GA.& Piping Model & Civil loads for pipe supports by using Caesar II.

7.Working as Engineer-Piping stress with M/s. Petrofac Engineering Services India

Pvt.Ltd, Chennai from August 2008 to Jan 9th 2017

PROJECT : Yibal Khuff Project (YKP)

Client and Location : PDO, Oman.

Position Held : Stress Engineer-Piping

Duration : October 2016 to Jan 9th 2017

●Performed Static Analysis of Critical Piping System connected to Air-Cooled Heat Exchanger, Pumps &Tanks system using Caesar II.

●Involved in all calculations related to stress analysis of the systems such as Trunnion Calculations, Flange Leakage Test, nozzle load summary sheets etc.

●Primary Support selection for pipes based on support selection philosophy.

●Support marking on Stress Systems are done and provided to piping Layout Department for 3D modeling and Isometric Checking related to Supports.

PROJECT : Rabab Harweel Integrated Project (RHIP)

Client and Location : PDO, Oman.

Position Held : Stress Engineer-Piping

Duration : Jan 2015 to Sep. 2016 (2 years & 3 months)

●Performed Static Analysis of Critical Piping System connected to Compressor, Air-Cooled Heat Exchanger, Pumps &Tanks system using Caesar II.

●Preparation of preliminary rack loads. Study of rack piping layout i.e. expansion loop and anchor bay locations. .

●Coordination with Civil Dept for Rack loading & Structural Loading.

●Coordination with Mechanical Dept for Nozzle Orientation and Allowable

●Preparation of data sheets, review of vendor drawings and stress reports.

●Involved in all calculations related to stress analysis of the systems such as Trunnion Calculations, Flange Leakage Test, nozzle load summary sheets etc.

PROJECT : - Expansion of Bab Gas Compression (Ebgcp) Phase-2.

Position : Pipeline Stress Engineer

Duration : June 2014to Dec. 2015 ( 6 months)

●Responsible for Pipeline Stress Analysis and Ensure integrity of design as per Stress Analysis requirements.

● Performed stress analysis for AG Production flow lines and UG high pressure water Injection flow lines (varies sizes) connected to wells/Manifold.

●Performed Stress analysis for varies sizes UG high pressure water injection Trunk line & Lateral line associated with Pig launcher/Receiver stations.

●Flange leakage analysis of AG piping.& Provided inputs like Civil Support loads, Pig traps Saddle load.

PROJECT : Soku Nag Compression Project

Client and Location : shell, Nigeria.

Position Held : Stress Engineer-Piping

Duration : July 2013 to June 2014(11 months).

●Performed Static Analysis of Critical Piping System connected to Compressor, Air-Cooled Heat Exchanger, Pressure vessel by using Caesar II.

●Preparation of spring data sheets, review of vendor drawings, platform & Tech. structure loads.

PROJECT : EHC Ammonia Offloading Facilities

Client and Location : carbon holding, Egypt.

Position Held : Stress Engineer-Piping

Duration : April 2012 to June 2013. (1year 2 months)

●Performed Static Analysis of Critical Piping System connected to presser vessels, Pumps, tanks by using Caesar II.

●Preparation of spring data sheets, review of vendor drawings, platform & Tech. structure loads.

PROPOSAL: Non – Associated Gas Long Term Field Development

Position Held : Sr.designer

Duration : July 2011 to May 2012. (10 months)

●Issued civil loads for pipe sleepers, rack and Anchor Bay support location.

PROPOSAL: Flare Gas Recovery Facilities in Unit 49 & Reggane Nord Development Surface Facilities

●Issued civil loads for pipe sleepers, rack & Anchor Bay support location.

PROPOSAL: EW Treatment & Injection (Nk)-KOC

●Issued civil loads for pipe sleepers, rack and Anchor Bay support location.

PROPOSAL: Petronas Refinery and petrochemicals integrated development at Malaysia (RAPID).

●Pipe rack loads calculated around 25 sections and issued to civil loads. To comply with the best industry practices and met the requirements of Engineering Standard (Pipe Supports Design & Anchors and Guides).

PROPOSAL: Rumaitha-Shanayel phase-III at Rumaitha.

●Pipe rack loads calculated around 30 sections and issued to Civil for structural calculations. Supporting of the pipes engineered to comply with the best industry practices and met the requirements of Engineering Std.

PROJECT : Effluent water injection phase-1 seawater injection Phase - II

Client and Location : KOC, Kuwait.

Position Held : Sr.designer -Piping

Duration : September 2010 to June 2011. (10 months)

●Preparation of stress analysis report for client approval and underground piping Layout

Assignment in Kuwait

Duration: May to June 2010 (2 months)

●Deputation to site in Kuwait for two months: - Involved in tie-in (piping) routing feasibility and measurement. During my period I have worked two projects they were water injection phase and MAA refinery.

PROPOSALS: LAM ‘F’ well head platform and B5 riser platform (offshore),

Zora Gas field development (offshore) & Borwin 3 offshore

Wind farm (offshore).

●Preparation of piping layout & Equipment Layout

●MTO Checking.

8.Worked as “Sr. Draughtsman” in GEA Energy System (India) Ltd. Chennai from Feb.2006 to June 2008.

PROJECTS

●500 MW Vijayawada Thermal Power Station, A.P India

●500 MW Khaperkeda Thermal Power Station,

●500 MW Kakathiay Thermal Power Station, A.P. India

JOB PROFILE:

●Preparation of Piping Layouts, Piping Fabrication Isometrics, Pipe Support layout.

●Checking Pipe Support Detail Drawings.

9. Worked as “Draughtsman” in VP Engineering Consultancy Services, Chennai, Nov ’2005 to Feb. 2006

PROJECTS

●Captive Power Plant for Visag Steel Plant for TSPL, Hyderabad, A.P. India.

●60 KM Refinery Condensate pipeline for ONGC Karaikal, for Nicco Corp Kolkatta

JOB PROFILE:

●Preparation of Piping Isometrics, Pipe Support Layouts and Detail drawings, Stress Isometrics& Piping and Supports B.O.M.

10.Worked as “Trainee” in BEL (Bharath Electronics Ltd) Ministry of defense Chennai, May ’02 to August 2003

●Design and drawing preparation of Mechanical equipments required for Electronic Equipments using AutoCAD.

11.Worked as Trainee in TVS (Diesel system) Chennai, June 2001 to march 2002

●CNC Machine operator.

PERSONAL DETAILS:

Name : Narasimmalu.J

Languages : Tamil, Telugu & English.

Marital Status : Married

Gender : Male

D.O.B :30.05.1981

Father’s Name : S.N.Jayaraman

Passport No : J4047604

Date of Expiry : 23.02.2021

DECLARATION:

I hereby declare that the statements made above are true to the best of my knowledge and belief.

Place: Chennai Yours Sincerely,

Date:

( NARASIMMALU.J )



Contact this candidate