Post Job Free

Resume

Sign in

Engineering Vessel

Location:
Kottayam, Kerala, India
Posted:
August 06, 2020

Contact this candidate

Resume:

HARINDRAN S.R

Last Updated

INSPECTION DIVER *.*U {JULY – 2020}

Kreuz-CV-Template-Offshore 1 of 11

Name : HARINDRAN S.R

Nationality : INDIAN

Passport : : Z-4495717

Date of Birth : 18.05.1975

Seamans Book : PALAU,P219971 EXPIRES :06/07/2025

Personal details

Email Address

Phone Number

Home Address

ade4di@r.postjobfree.com

+91-906*******, +91-963*******

Sarovaram,

Kottiyode, Club Road, T.B Jn,

Attingal – 695101, Kerala

CERTIFICATION HELD

HSE Part-1 (IMCA IDS-1) (81:479)

Cert. Number :213/COM.DIV

CSWIP -3.2U

Cert. Number: 392759/2

Expires: 25/11/2024

TRAINEE OFSHORE AIR DIVING SUPERVISOR

Cert.Number:KBAT- ADA1004

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 2 of 11

SAFETY TRAINING

Offshore Survival (BOSIET)

(OPITO Approved)

Cert. Number: 01985700150120009

Expires: 14/01/2024

STCW -

ASMTI/BSTCW/10010320

Expires: 13/03/2025

STSDSD

Cert. Number

:ASMTI/STSDSD/10010320

Expires:16/03/2025

Diving Medical

Expires: 05/06/2021

TOTAL DIVING EXPERIENCE – 18.5 YEARS.

SKILLS/EXPERIENCE SUMMARY

I am a hardworking, reliable team player with over 18 years’ experience as a commercial diver with over 13 years’ experience as a Inspection diver working in a wide range of environments in the commercial diving industry with 3.1U/3.2U. An honest individual with a good sense of humour and the ability to grasp new concepts quickly while also being flexible and open-minded. HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 3 of 11

EMPLOYMENT HISTORY

Company Client Dates Position Vessel / Project Info SEASWIP SUBSEA

SOLUTIONS

ONGC 10/04/2019

07/06/2019

INSPECTION

DIVER

Plem, lateral valves inspection,

mooring and de- mooring and

subsea hose installation.

HAL OFFSHORE ONGC 14/01/2019

04/03/2019

INSPECTION

DIVER

DSV Seamec-2/OTS installation and

Plem, lateral valves inspection,

mooring and de- mooring and

subsea hose installation.

HAL OFFSHORE ONGC 30/07/2018

24/09/2018

INSPECTION

DIVER

DSV Seamec-2/Plem, lateral valves

inspection. mooring, de- mooring

and subsea hose

Installation.

HAL OFFSHORE ONGC 05/03/2018

30/04/2018

INSPECTION

DIVER

DSV Seamec-2/ IMR JOB and Clamp

installation.

FUGRO SUBSEA

SOLUTIONS

QP/QATAR 16/12/2016

17/08/2017

INSPECTION

DIVER

Inspection vessel, Ras Laffan &

Messaied Ports

UT & CP Readings of legs and membe

CVI of welds

Photography of Cracks in Concrete Blocks

Subsea Hose changing

Floating hose changeover

Water jetting for removal of marine growth

in legs of platforms

Water jetting underneath SPM Buoys

Inspection of Navigational Buoys

Inspection of PLEM

Broco cutting of excess chain of SPM.

General maintenance of SPM.

Hydraulic jack hammer & Airlift for excavati

on.

Hydraulic wire brush used for clean pipelin

e surface.

Cleaned designated locations of riser clamp

assembly with H.P water jet.

General video inspection (G.V.I) of riser cla

mp assembly.

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 4 of 11

EMPLOYMENT HISTORY

Company Client Dates Position Vessel / Project Info BOSKALIS QATAR QP/QATAR GAS 09/06/2015

04/08/2015

INSPECTION

DIVER

Inspection vessel, Ras Laffan &

Messaied Ports

UT & CP Readings of legs and membe

CVI of welds

Photography of Cracks in Concrete Blocks

Subsea Hose changing

Floating hose changeover

Water jetting for removal of marine growth

in legs of platforms

Water jetting underneath SPM Buoys

Inspection of Navigational Buoys

Inspection of PLEM

Broco cutting of excess chain of SPM.

General maintenance of SPM.

Hydraulic jack hammer & Airlift for excavati

on.

Hydraulic wire brush used for clean pipelin

e surface.

Cleaned designated locations of riser clamp

assembly with H.P water jet.

General video inspection (G.V.I) of riser cla

mp assembly.

BOSKALIS QATAR QP/QATAR GAS 23/12/2014

17/02/2015

INSPECTION

DIVER

Inspection vessel, Ras Laffan &

Messaied Ports

UT & CP Readings of legs and membe

CVI of welds

Photography of Cracks in Concrete Blocks

Subsea Hose changing

Floating hose changeover

Water jetting for removal of marine growth

in legs of platforms

Water jetting underneath SPM Buoys

Inspection of Navigational Buoys

Inspection of PLEM

Broco cutting of excess chain of SPM.

General maintenance of SPM.

Hydraulic jack hammer & Airlift for excavati

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 5 of 11

EMPLOYMENT HISTORY

Company Client Dates Position Vessel / Project Info on.

Hydraulic wire brush used for clean pipelin

e surface.

Cleaned designated locations of riser clamp

assembly with H.P water jet.

General video inspection (G.V.I) of riser cla

mp assembly.

BOSKALIS QATAR QP/QATAR GAS 30/09/2014

25/11/2014

INSPECTION

DIVER

Inspection vessel, Ras Laffan &

Messaied Ports

UT & CP Readings of legs and membe

CVI of welds

Photography of Cracks in Concrete Blocks

Subsea Hose changing

Floating hose changeover

Water jetting for removal of marine growth

in legs of platforms

Water jetting underneath SPM Buoys

Inspection of Navigational Buoys

Inspection of PLEM

Broco cutting of excess chain of SPM.

General maintenance of SPM.

Hydraulic jack hammer & Airlift for excavati

on.

Hydraulic wire brush used for clean pipelin

e surface.

Cleaned designated locations of riser clamp

assembly with H.P water jet.

General video inspection (G.V.I) of riser cla

mp assembly.

BOSKALIS QATAR QP/QATAR GAS 06/01/2009

08/07/2014

INSPECTION

DIVER

Inspection vessel, Ras Laffan &

Messaied Ports

UT & CP Readings of legs and membe

CVI of welds

Photography of Cracks in Concrete Blocks

Subsea Hose changing

Floating hose changeover

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 6 of 11

EMPLOYMENT HISTORY

Company Client Dates Position Vessel / Project Info Water jetting for removal of marine growth

in legs of platforms

Water jetting underneath SPM Buoys

Inspection of Navigational Buoys

Inspection of PLEM

Broco cutting of excess chain of SPM.

General maintenance of SPM.

Hydraulic jack hammer & Airlift for excavati

on.

Hydraulic wire brush used for clean pipelin

e surface.

Cleaned designated locations of riser clamp

assembly with H.P water jet.

General video inspection (G.V.I) of riser cla

mp assembly.

MERMAID

OFFSHORE

THAILAND

JPCC/INDONESIA

/VIETNAM/THAIL

AND

from 16’th

March to

May 11’th

2008

INSPECTION

DIVER

DSV BIN MINH

UT Reading of the Riser Clamps.

CP Reading of the Riser Clamps.

CVI of the Weld.

Photography of the defects of

the Riser.

Photography of Anodes, Nodal

Joints which has been cleaned

using Grit Blasting.

Cleaning of the Nodal Joints by

using Water Jet.

Cleaning of the Weld by using

Grit Blasting.

SUPREME HYDRO

ENGINEERING,BO

MBAY HIGH

BRITISH GAS

INDIA,PANN

A FIELD

from 12’th J

anuary

to Febr

uary 10

th, 200

8)

INSPECTION

DIVER

UT Reading of the Riser Clamps.

CP Reading of the Riser Clamps.

CVI of the Weld.

Photography of the defects of

the Riser.

Photography of Anodes, Nodal

Joints which has been cleaned

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 7 of 11

EMPLOYMENT HISTORY

Company Client Dates Position Vessel / Project Info using Grit Blasting.

Cleaning of the Nodal Joints by

using Water Jet.

Cleaning of the Weld by using

Grit Blasting

SUPREME HYDRO

ENGINEERING,BO

MBAY HIGH

BRITISH GAS

INDIA,PANN

A FIELD

from 29’th

Novem

ber to 4

’th Janu

ary 200

8)

INSPECTION

DIVER

UT Reading of the Riser Clamps.

CP Reading of the Riser Clamps.

CVI of the Weld.

Photography of the defects of

the Riser.

Photography of Anodes, Nodal

Joints which has been cleaned

using Grit Blasting.

Cleaning of the Nodal Joints by

using Water Jet.

Cleaning of the Weld by using

Grit Blasting.

SARKU

Engineering

Services, Malaysia

PETRONAS from 15’th

August

2007 to

20’th O

ctober

2007)

INSPECTION

DIVER

SARKU Semantan DSV

UT Reading of the Riser Clamps.

CP Reading of the Riser Clamps.

CVI of the Weld. Photography of

the defects of the Riser.

Photography of Anodes, Nodal

Joints which has been cleaned

using Grit Blasting.

Cleaning of the Nodal Joints by

using Water Jet.

Cleaning of the Weld by using

Grit Blasting.

Applying Epoxy on the affected

area on the Riser and Wrapping

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 8 of 11

EMPLOYMENT HISTORY

Company Client Dates Position Vessel / Project Info it.

CCC

UNDERWATER

ENGINEERING

Jamnagar Offsho

re

from 30’th J

une 20

07 to 2

4’th Jul

y 2007)

DIVER Regina 250 barge.

Supporting Saturation Divers.

Connecting spool piece to the PLEM.

Connecting the whips and

tightening the bolts by using hydra

tight.

SEA SWIFT Bekk Solutions /

Jamnagar

Offshore

15’th May 2

007 to

19’th J

une 20

07)

DIVER Leighton Mynx Barge, SPM

Installation project.

Grouting of Pipeline.

Inspection of the Pile Hole.

Guiding the Mud Lift into the

Pile hole.

Guiding the anchor pile in the

Pile hole.

Placing the Gyro Compass on

top of the Anchor Pile.

General Visual Inspection and

CCTV Inspection work.

SEA SWIFT Bekk Solutions

Cochin

Offshore/BPCL

07’th Marc

h 2007

to 05’t

h May 2

007)

DIVER Leighton Stealth Barge.

Pipeline layout in barge.

Stinker Check.

Trench Inspection.

Touchdown reporting of pipelines.

General Visual Inspection and CCTV

Inspection work.

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 9 of 11

EMPLOYMENT HISTORY

Company Client Dates Position Vessel / Project Info SUPREME HYDRO

ENGINEERING

SUPREME

HYDRO

ENGINEERING /

BOMBAY ONGC

19’th Nove

mber 2

006 to

28’th F

ebruary

2007)

INSPECTION

DIVER

DSV Malaviya 27 and Malaviya

25 as an NDT Diver.

Done Riser Inspections in SHP,

NQP Neelam Field, Heera Field.

Ultrasonic Inspection of Risers

using GRID systems.

Profiling of Risers.

Ultrasonic Inspection of Brace

and Stub.

General Visual Inspection of the

LEG and conductors.

Photography of all the four legs,

VDM and Anodes.

Videography of the Jacket up to

Charlie Level.

Cleaning of LEGS of the jacket

by using water jet.

CP Meter Reading of LEGS,

Anodes and Risers.

SPM Inspections, Cathodic

Protection Reading of SPM and

Ultrasonic Inspection at all

Clock positions.

Fender Replacing jobs at Boat

Landings of the Jacket.

Remedial Jobs of Barge Bumper.

De-mooring and Mooring of

SBM’s, Decommissioning of

SBM.

GALFAR

ENGINEERING &

CONSTRUCTION

MUSCAT 26’th Janua

ry 2006

DIVER Block Placing.

Break Water.

Rewetting

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 10 of 11

EMPLOYMENT HISTORY

Company Client Dates Position Vessel / Project Info COMPANY to 13’t

h June

2006)

AQUA SPACE

DIVING CENTER

KERALA, INDIA 09’th

October

2002 to

20’th July

2005)

DIVER Inspection of pipeline.

Taking still photography of

anodes and Field joints

Inspection & Measurement of

Chain thickness using caliber.

Type III Cleaning, Using M.P.UI,

U.T. & C.P. Meter.

Fixing Retro Clamp on 18” Gas

pipeline, Final flogging of bolts,

Applying Epoxy on bare metal.

Photography & Videography on

repaired pipeline;

Videography under spudcan

cone

Survey of Jackin house, Broco

cutting connecting chain slings

for lifting Jacking legs.

Using Air lift

Installing anodes & clamps.

Propeller cleaning of vessels.

Plugging in the hull of vessel.

Taking filler-gauge

measurements.

HARINDRAN S.R

Last Updated

INSPECTION DIVER 3.2U {JULY – 2020}

Kreuz-CV-Template-Offshore 11 of 11

PLACE:ATTINGAL

HARINDRAN S R

DATE:28/07/2020



Contact this candidate