Post Job Free

Resume

Sign in

Mechanical Engineer Power Plant

Location:
Qibla, Kuwait City, Kuwait
Posted:
August 05, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Name

:

AMALESH SARKAR

Currently Based

:

Kuwait

Present Company

:

MECC, Ali Alghanim, Kuwait

Designation

:

Construction Manager

Reporting To

:

Project Manager

Mobile Phone

:

965-******** / 65683981

Nationality

:

Indian

Education Qualification/ Institution/ Year:

:

Bachelor in Engineering (Mechanical), Dibrugarh University, Assam, India, 2000.

Work Experience

:

20 years

E-mail ID

:

ade3f1@r.postjobfree.com

Passport No

:

Z2519431

Post Applied For

:

PROFESSIONAL EXPERIENCE

Total Experience: 20 years of experience, out of which 14 years in Kuwait

CAREER SUMMARY

Total 20 years of experience, out of which 14 years hands on exposure of mega projects in Oil Refinery in India & Kuwait with Punj Lloyd Limited, Arabi Enertech, MECC (Ali Alghanim) & 6 years in other Oil & Gas projects in the field of Co-ordination and supervision of Piping related works. Presently working as Construction Manager with MECC, Ali Alghanim, at KOC, Kuwait.

OBJECTIVE:-

To work in challenging & dynamic environment with my Techno-Commercial skills in the field of contract Management

RESPONSIBILITIES:-

WKO, Phase-I, GC-01 & 02, Burgan:

I have the honor to say that I am involved in WKO facilities in GC-01 and GC-02 of MECC from tendering stage till to Handover & adjustment order. I was also involve in Flow Line Header Replacement in shutdown, Tank Demolition of 4 nos, Vessels (Inlet Seperator, Treater, HIGF, CEC, Mares Tails) erection, Commissioning of WKO, Commissioning of RTRP Pipeline Networks, PAT Test and Handover of WKO to KOC.

Responsibilities includes preparation & review of work procedures, Quality assurance plan & Inspection Test Plan, co-ordination with client, contactor,planning/scheduling & monitoring of construction activities, review of erection scheme for critical equipments, Modification of drawing as per site condition, Preparation of tender document for sub-contract, Pre commissioning and Commissioning activities, Nitrogen purging, Pump start-up, Flushing and Leak Test of Pipelines, Vessel, Column, Vacuum Test of column, Valve and control valve operation, Charging of lines, Project experience in unit rates & LSTK, EPC contracts, excellent communication skills. Wide exposure in Computers viz: -Microsoft office, MS Words, Excel etc.

Having wide experience in the following works:-

Piping: Fabrication & installation of pipelines of different classes in Refinery & Oil field projects such as TL-4 Pipeline Project in KOC, Kuwait, Fire Protection System Up gradation Project, PMP Project in Wafra Oil Field, Hydrogen Generation Unit, DHDS Unit, Captive power plant, Hydrotreater Unit, Heat Recovery Steam Generation (HRSG) Unit, Highly Purified Nitrogen(HPN) Unit, Sulphur Recovery Unit (SRU), SWS Unit, Viscous Breaker Unit(VBU). The Piping MOC includes Carbon steel, Alloy steel, Stainless steel, Nace pipes, LTCS pipes, In-coloy etc. Conversant with ASME B31.3 for refinery piping.

Crude Storage Tank: As I worked as Project Engineer, Tank Construction & related piping, I was responsible for supervising and directing the construction activities of EPC Tank Projects, Developing project execution plan, schedule, tool list and staffing plan, Analyzing assigned tank construction activities to determine the scope, time and resource requirements, Directing preparation of quantity listings of field purchased materials and equipments and initiate requisitions for field purchases, Assisting construction engineer & supervisor in interpreting tank design drawings, monitoring installation and planning for delivery of construction materials and equipments, implementation of API 650 code for tank construction.

Equipment & Vessel: Preparation of Procedure for Vessel Erection and Erection of vessels, Inlet Separator, Treater Vessel, HIGF Vessels, Gas Scrubber, Water Dispatch Pump 5 Nos in Water Knockout Project in GC-01 and GC-02 (KOC, Burgan). Erection and Construction of Degassing Boot and Wet Tank in GC-21 and GC-04. Erection of Pump in MAB Refinery, Kuwait. Installation of New Crude Tank and 5 nos of associated Pumps in PMP Project, Joint Operation, Wafra, Kuwait. Involved in other equipment’s erection activities in Indian Project as Pump, Heater, Reactor, Heat Exchangers, columns, Pig Launcher, Pig Receiver, Filters, Reactors, Air Pre heater, Vaporizer, Super Heater for Boiler etc.

Commissioning : Commissioning activities, Start-up of pump, Heater, Nitrogen purging, charging of lines with hydrocarbon, Start-up of heater etc.

Operation & Maintanence, WKO, GC-01 & GC-02:

Worked as O&M Manager in WKO

facilities of GC-1 and GC-2. Reviews of vessels maintenance schedule,

valves maintenance schedules and arrangement for the execution of same.

Preparation of schedule for Vessels internal cleaning and periodic sand

wash of vessels.

FIELD OF EXPERIENCE

Pressure Maintenance Plant, Wafra Oil Field, Pipe Lines, Refineries, Power Plant, Utilities and Off Sites Piping of different services.

WORK HISTORY

Working as a Construction Engineer (Piping) in KOC TL-4 Pipeline Project, Kuwait.

MECC, Ali Alghanim : June 2016 to Till Today

ARABI ENERTECH KSC : 2006 To June, 2016

PUNJ LLOYD LIMITED : 2003 To 2006 (3 YEARS)

TPS BUILDERS LTD : 2000 To 2003 (3 years )

Safety Training : 1. Two days safety training on OSHA in MAB

Refinery.

2. Monthly HSE training in Joint Operation,

Wafra.

3. Pursuing NIBOSH COURSE

Details of Project handled:

PROJECT

PERIOD

COST OF THE PROJECT

1. Water Management at GC-9, GC-10, GC-20 & GC-22 in EK Area, Magwa Oil Field, Kuwait

April-2019’ to Till Today

US $ 200 Million

1. Water Management at GC1 & GC2 in S & EK Area, Burgan Oil Field, Kuwait

June’2016 to Till April’2019

US $ 88 Million

2.Dual Tank Project In GC-21 & GC-4, Burgan Oil Field, Kuwait

May’2013 to June 2016

US $ 14 Million

3. New 30” Crude Transit PipeLine (TL-4) Project, Abdaly Oil Field, Kuwait

April’2011 to Till May 2013

US $ 7 Million

4. Installation & Commissioning of Oil Recovery Tank in PMP Plant, Wafra Oil Field

October’2010 to April’2011

US $ 15 Million

5. Removal of old Feed Pumps, Installation & Commissioning of new Feed Pumps, MAB Refinery, KNPC, Kuwait

April’2010 to October’2010

US $ 2.8 Million

6.Fire Protection System Up Gradation Project, MAB Refinery, KNPC, Kuwait

March 2009 to April’2010

US $ 4 Million

7. Pressure Maintenance Project, Wafra Oil Field, Kuwait

Aug’2006 to March ‘09

US $ 15 Million

8. Indore Kota Pipeline, India

April’2006 to Aug 2006

US $ 45 Million

9. Dabhol Power Plant Project

Dec‘2005 to April ‘2006

US $ 30 Million

10. MSQ Project, Haldia Refinery, W.B.,India

May‘2004 to Dec’2005

US $ 40 Million

11. SRU, Viscous Breaker Unit, CPCL Refinery, Chennai,India

May’2003 to May’2004

US $ 70 Million

12.HRSG,HPN,HGU,SRU, Digboi Refinery, Assam, India

April’2001 to May’ 2003

US $ 1.5 Million

13.Hydrotreater Unit, Guwahati Refinery, Assam, India

Aug’2000 to April’ 2001

US $ 1 Million

KOC,MAGWA, Water Management At GC-09, GC-10, GC-20 and GC-22 In EK Area, Kuwait

Job Title

:

Construction Manager

Period

:

April’2019 To Till Today

Project Phase

:

Water Knockout Project inside GC-09,10,20 and GC-22

Client

:

Kuwait Oil Company

Responsible for completion of Construction on schedule, implementation of instructions and guidelines issued by the KOC Project Management related to Scopes and responsible to implement the Project Quality & HSE Policies, objectives, targets and reviews their implementation across the Project as per the contractual requirements in consultation with the QA/QC and HSE Manager. I am responsible also for organizing the resources, direct control of construction activities and control of sub-contractors, Foreman. Responsible to ensure that Site Toolbox Meetings are held regularly by Site Foeman & Sub Contractor Foreman prior to starting any activity at site.

KOC BURGAN, Water Management At GC1 and GC2 In S & EK Area, Kuwait

Job Title

:

Construction Manager

Period

:

June’2016 To April 2019

Project Phase

:

Water Knockout Project inside GC1 and GC2

Client

:

Kuwait Oil Company

Responsible for completion of Construction on schedule, implementation of instructions and guidelines issued by the KOC Project Manager related to Scopes and responsible to implement the Project Quality & HSE Policies, objectives, targets and reviews their implementation across the Project as per the contractual requirements in consultation with the QA/QC and HSE Manager. I am responsible also for organizing the resources, direct control of construction activities and control of sub-contractors, Foreman. Responsible to ensure that Site Toolbox Meetings are held regularly by Site Foeman & Sub Contractor Foreman prior to starting any activity at site.

KOC, Dual & Dry Tank Project, GC-21 & GC-04, Kuwait

Job Title

:

Tank Construction Engineer

Period

:

May’2013 To June 2016

Project Phase

:

Replacement of Dual Tank at GC-04 & Dry Tank at GC-21

Client

:

Kuwait Oil Company

Working as a Mechanical Engineer (Tank Construction) I am involved in review of Tank Drawing, P&ID drawing, Pipe Layout Drawing & Isometric drawing. Preparation of Tank Fabrication Procedure, Work Schedule Piping & Equipment Works, Erection plan, Coordinating with clients regarding Tank Construction and Mechanical related jobs, preparing job Procedure & Method Statement as per ASME & API Standards. Manage & supervise the engineering, procurement, construction of Dual & Dry Tank construction work for GC-04 & GC-21 in KOC. Acting as a key interface with the client to coordinate progress, priorities and change management and assure quality in design work. Committed for the implementation of a safe working environment for the work team without any incident and injury free culture. Monitor the work force for executing the proper construction techniques and methods as per approved procedure and ensure that relevant project standards are applied in the field. Review field technical deviations, working closely with construction teams to assure quality and compliance with specifications for the tank designs and the construction execution plan. Verify achievement of project milestones and progress versus plan, Identify potential areas of delay along with recommendations for mitigation.

KOC, New 30” Crude Transit Pipeline Project (TL-4), Ahmedi, Kuwait

Job Title

:

Mechanical Construction Engineer

Period

:

April’2011 to May 2013

Project Phase

:

New 30” Crude Transit Line Project (TL-4) From NK to CMM

Client

:

ABB / Kuwait Oil Company

Working as a Mechanical Engineer I am involved in planning, execution & inspection plan of fit-up & weld joints of Unit Piping, Preparation of Method Statement for Piping Works, Preparation of Micro Schedule for Mechanical and Piping works, Preparation of Job Safety Analysis and Erection plan, Coordinating with clients regarding Piping and Mechanical related jobs, making jobs Procedure & Method Statement as per ASME & API Standards.

Wafra Oil Field, PMP Project, Wafra, Kuwait

Job Title

:

Mechanical Construction Engineer

Period

:

October’2010 to April’2011

Project Phase

:

Installation & Commissioning of Oil Recovery Tank & associated piping works in PMP Plant in Wafra Oil Field

Client

:

Kuwait Gulf Oil Company & Saudi Arabian Chevron (JO)

Working as a Mechanical Engineer I was involved in planning, execution & inspection plan of fit-up & weld joints of Unit Piping water disposal pipeline, Replacement of old corroded piping with new pipe line, Preparation of Method Statement for nitrogen purging for tanks, Preparation of Shutdown Schedule of old tanks, Blinding plan for piping of old tanks, draining and desludging of old tanks, nitrogen purging of old tanks, fixing of new nozzle in old tanks and related piping, Preparation of Job Safety Analysis and Erection plan, Coordinating with clients regarding Piping related jobs, making jobs Procedure & Method Statement as per ASME & API Standards. Preparation of punch list, flushing of systems.

Engineering, Procurement, Installation & Commissioning of Feed Pump, MAB Refinery, KNPC, Kuwait

Job Title

:

Engineer –Mechanical Maintenance Works

Period

:

April’10 to Oct.2010

Project Phase

:

Decommissioning of four no Feed Pump & replaced with new Feed Pump at MAB Refinery, KNPC, Kuwait

Client

:

Kuwait National Petroleum Company, Kuwait

Working as a Mechanical Engineer I am involved in decommissioning of pumps, preparation of Blinding List & removal of related old pipes and pump foundation, review of drawing, Preparation of Shutdown procedure, Preparation of Tie-In procedure, Inspection of incoming materials, checking TC of materials, preparation of MRIR for incoming materials, Preparation of Shutdown schedule, Preparation of hydrotest packages for piping works, Hydro test schedule, Preparation of pump erection plan and related works. Pump commissioning and start-up of pumps.

Fire Protection System Up Gradation Project, MAB Refinery, KNPC, Kuwait

Job Title

:

Mechanical Engineer

Period

:

March’09 to April 2010

Project Phase

:

Up Gradation of Fire Protection System, MAB Refinery, KNPC, Kuwait

Client

:

Kuwait National Petroleum Company, Kuwait

Working as a Site Engineer I am involved removal of old fire water and other utility service water line, fit-up and welding inspection for cement lined fire water line, review of drawing of new firefighting system, Inspection of incoming materials, checking TC of materials, Preparation of Tie-In procedure, Schedule for tie-in works fire water line, Manpower deployment plan, Preparation of Test Packages, Review of Site Progress, planning, execution Unit Piping, Coordinating with clients regarding Piping related jobs, maintaining records as per ISO standards, making jobs Procedure & Method Statement as per ASME & API Standards.

Wafra Oil Field, PMP Project, Wafra, Kuwait

Job Title

:

Engineer –Mechanical Maintenance Works

Period

:

Aug’06 to Mar’ 2009

Project Phase

:

Expansion of existing Water Disposal Unit in Wafra Oil Field

Client

:

Kuwait Gulf Oil Company & Saudi Arabian Chevron (JO)

Working as a Mechanical Engineer I was involved in planning, execution & inspection of fit-up & weld joints of water disposal pipeline, Replacement of old corroded piping with new pipe line, installation and alignment of eight no of water disposal pumps & related piping, Preparation of Method Statement for nitrogen purging for new tanks & commissioning of new tanks, Preparation of Shutdown Schedule of old tanks, Blinding plan for piping of old tanks, draining and desludging of old tanks, nitrogen purging of old tanks, fixing of new nozzle in old tanks and related piping, Preparation of Job Safety Analysis and Erection plan, Coordinating with clients regarding Piping related jobs, making jobs Procedure & Method Statement as per ASME & API Standards. I was also involved in Pre commissioning and commissioning activities such as clearance system punch list, flushing of systems, purging of lines and tank with Nitrogen for charging of line and pump test run and pump maintenance works such as pump alignment, replacement of bearing oil, mechanical seal oil, condition monitoring of pumps etc.

Indore Kota Pipelines, Rajasthan, India

Job Title

:

Senior Engineer –Mechanical

Period

:

April 06 to Aug 06

Project Phase

:

Construction Of Two IP Station, Rajasthan, India

Client

:

Bharat Petroleum Corporation Limited, India

I was involved in installation & erection of equipments & pipes for two Intermediate Pigging (IP) Station for 180 KM long Indore Kota Pipelines Project. I was involved in erection of Pig receiver, Pig Launcher & Basket Filter ; Mechanical Clearance, Hydrostatic Test and in Commissioning and Pre-commissioning activities, Charging of pipelines, cleaning of pipeline using foam pigs.

Dabhol Power Plant Project, Chiplun, Maharastra, India

Job Title

:

Senior Engineer –Mechanical

Period

:

Dec.2005 to April 06

Project Phase

:

LNG Terminal & Storage Facilities of Dabhol Power Plant, India

Client

:

Gas Authority of India Limited & NTPC, India

I was involved in installation and alignment of HP Booster pump, LP Booster pump; Vaporizer internals of LNG Vaporizer Unit & checking and workout of balance jobs in LNG tanks, installation of piping for Jetty unloading arm, Health checking of Cryogenic supports, coordination with vendors and client, making health study reports and submitting to clients. Preparation of Method Statement, Test Packages, Execution, Fit up & Weld visual of joints.

Motor Spirit Quality Up gradation Project, Haldia Refinery, W.B. India

Job Title

:

SENIOR ENGINEER - MECHANICAL

Period

:

May.’04 to Dec.’05

Project Phase

:

Planning, Scheduling, Execution & Supervision

Client

:

Indian Oil Corporation Limited, India

I was involved in execution/inspection of piping works related to Cooling Water supply and return to different water cooled Heat Exchanger, Pump etc. Fire Water line installation for fire fighting works. The heater allied works include installation of ID Fan, FD Fan, Glass Air Pre-Heater & Cast Tube Air Pre-Heater with cold / hot flue gas ducts and cold/hot air ducts. Involved in specialized works like refractory of heater (both using insulating castables & Ceramic modules). The column internals includes Valve trays, Chimney trays, C-grid, Gem packing, inlet feed device, Demister pad, spray headers.

SRU,VISCOUS BREAKER UNIT(VBU), CHENNAI PETROLEUM CORPORATION LIMITED (CPCL REFINERY), CHENNAI, INDIA

Job Title

:

ENGINEER - MECHANICAL

Period

:

May.’03 to May.’04

Project Phase

:

Project Management and Construction Supervision of Lump sum Turnkey Project

Client

:

Indian Oil Corporation Limited, India

Involved in execution of SRU & VBU to generate 80T/hr of sulphur from SRU Unit and VBU unit taking 135NM/hr VB Residue from VDU unit of the refinery producing Gas Oil, Naphtha, Sour Gas (H2S), Vacuum Gas Oil (VGO).I was Responsible for construction supervision of Jacket piping for SRU Unit & normal piping jobs for VBU unit, Steam Tracing of pipes, pre-commissioning and commissioning activities, unit & offsite piping. Startup of pumps, Valve operation, Vacuum test of column, Nitrogen Purging, Charging of line with Hydrocarbon liquid, Ignition of Heater etc.

PREVIOUS WORK HISTORY

M/s. TPS BUILDERS (P) LIMITED, CHENNAI, INDIA (3 years)

HRSG, HIGHLY PURIFIED NITROGEN UNIT, HGU, DIGBOI REFINERY,ASSAM INDIA

Job Title

:

ENGINEER

Period

:

April.’01 to May.’03

Project Phase

:

HRSG, Highly Purified Nitrogen Unit, Hydrogen Generation Units, Digboi Refinery, Assam, India

Client

:

Indian Oil Corporation Limited, India

Involved in construction supervision of mechanical works for HRSG, HPN, and HGU Project in Digboi Refinery Up Gradation Project, Asia’s Oldest Refinery in Assam, India. Work involved was construction of product piping, offsite piping, piping for hydrogen compressor, Erection of Intercooler, Volume Bottles for Hydrogen Compressor, Erection of Reactors & related Piping, erection of module of super heater, vaporizer, air pre-heater in HRSG Project, alloy steel IBR piping, P5, P11, P12, P22, SS304, SS347, SS321 piping. Erection of Cold Storage Box, Nitrogen Storage Vessel & related SS Piping in HPN Projects

HYDROTREATER PROJECT, GUWAHATI REFINERY, ASSAM, INDIA.

Job Title

:

ENGINEER

Period

:

Aug.’00 to April.’01

Project Phase

:

Construction Engineer

Client

:

Indian Oil Corporation Limited, India

Involved in execution of underground cooling water piping, mechanical clearance, hydro test of loops & unit piping for Hydrotreater Unit of Guwahati Refinery Assam.



Contact this candidate