CURRICULUM VITAE
B.TECH, MECHANICAL
PARVEER SINGH
Nationality: Indian
Gender: Male
Date of Birth: 02/02/1988
Marital status: Married
Passport No: G6545051
Contact: Kuwait +965-********, +965-********
E-mail id: *******.******@*****.***
Linked in Profile: https://www.linkedin.com/in/parveer-singh-49b33889/
CAREER OBJECTIVE
To succeed as thorough professional in the field of Erection, Costing of a Project, Installation, Testing, Commissioning and Maintenance towards accomplishing organizational goals seeking an excellent, exciting and dynamic career. To work in professionally managed, challenging and productive environment.
TECHNICAL HVAC/MEP SKILL
Estimation of HVAC project costing.
Heat Load Calculations(Carrier-Hourly Analysis Programe-HAP-4.5i)
Pressure drop calculation in closed chilled water system (Pump Head,/AHU- Static)
Pressure drop calculation for static pressure in equipment’s and ducts.
Treated air Duct sizing calculations as per SMACNA.
Chilled water pipe line designing/ pump designing as air side calculations.
Good knowledge about Calculating TR, CFM.
Fire sprinkler calculation based on hazardous area and type of fire protection system proposed as per standard NFPA and local KFD (Kuwait fire department authority) Based on water quantity the fire water net main/storage tank and fire pump capacities can be estimated. Fire pump head calculations based on the nodes and longest pipe run.
Good knowledge about Fire suppression FM 200 & Deluge system for Gas chambers.
Good knowledge about foam system.
Building management system (BMS) over all planning including LCP/DDC schedule and integration logics etc.
SOFTWARE PROFICENCY
Maintenance package – CMMS
Cad-Cam designing.
HAP Designing.
MS Word, Excel, Power Point.
Revit MEP Essential.
Focus
ACADEMIC QUALIFICATIONS
MASTER DEGREE: (M.B.A) from Punjab Technical University Pb, India.
Grade: Second Division.
BACHOLER’S DEGREE: (B.Tech) (Mechanical Engineering) from Punjab Technical University Pb India, Grade: First Division having attestation from Secretary of State Punjab, Punjab Technical University, India. Ministry of foreign Affairs Kuwait. and Ministry of external affairs India/New Delhi.
HIGHER SECONDARY: Science stream P.S.E.B
Grades: First division
SECONDARY: C.B.S.E
Grade: First Division
EXPERIENCE
TOTAL EXPERIENCE +7 YEAR: Experience in Production, Erection of Steel structure trusses, Construction R.C.C / M.S chimneys, Installation, Testing, Commissioning HVAC / Fire protection system, Operation & Maintenance of Electro Mechanical Equipment’s.
1)FAWAZ REFRIGERATION & AIR CONDITIONING CO. KUWAIT
Job title : Senior Engineer HVAC
Duration : Commenced – 25.05.2016 till date
Project : Kuwait institute of scientific research (KUWAIT)
Nature of work:
Planning, Execution & overall management of Electromechanical works with emphasis on cost, safety & quality control.
Reviewing Shop drawings for ongoing Project.
Project management, MEP Co-ordination for Mechanical and Electrical Services.
Coordinate with Client/consultant/Design office in order to resolve technical issues.
Prepare and submission of materials as per specifications.
Inspection of incoming materials, procedures and installation for conformance to specifications.
Ensure quality works and inspections as per quality procedures.
Review start up and acceptance requirements, procedures for Start-up, Testing and Acceptance
Participate in weekly and monthly progress meetings.
Prepare and manage MEP Punch lists.
Review As Built documentation.
Supervise contractors work activities to ensure that during engineering procurement construction and commission phase to meet the project requirements.
Operation and Maintenance of Various Systems.
Construction of M & E equipment, Plumbing, HVAC and wastewater systems, etc.
Supervise start-up of mechanical, electrical and safety systems.
Review submittals in conjunction with project management.
Manage and lead a team from conception stage to handover.
Able to lead and coordinate with contractors and relevant authorities to ensure project implementation.
Establish safe working procedures in the working area and Manage and ensure ISO 9000 implementation
Summary of Experiences:
Overall experience in complete Project Management, Co-ordination and Installation of MEP Services, High-rise Buildings, etc. which includes Commercial buildings Malls, Central A/C Plants(including Chillers, Package A/C, Split A/C, Window A/C) FCUs, VAVs, AHUs, Pumps, Motors, Electrical heaters, Boilers, Generators, Fuel Storage system, Services piping, Laboratory equipment’s, Kitchen equipment’s, Material procurement, follow-ups, maintenance, Production and Planning of Mechanical and Electrical systems.
2)FAWAZ REFRIGERATION & AIR CONDITIONING CO. KUWAIT
Job title : MEP Engineer
Duration : Commenced – 25.02.2013
Project : 360 Mall (KUWAIT)
Nature of work:
Inspecting testing the MEP fit out jobs as referring to the ASHRAE, SMACNA and NFPA standards.
Design, Detailed Engineering, Inspection, Supervision, Testing, Commissioning, Maintenance Of HVAC System (Non Hazardous/Hazardous),Window air conditioner, Packaged units, Split unit(Wall type, cassette type, Ceiling Mounted, Central air handling Station Direct expansion system),Chilled water system both air cooled and water cooled including cooling towers, Forced ventilation /Exhaust system, F&B ventilation, fume hoods, smoke extraction system etc.
Taking parts in new installation jobs like steel structure, Escalators, Elevators commissioning and installation works reviewing related design drawings and technical executing strategy.
Attending the site progress and technical meeting held by consultant.
Rising queries to the consultant or main contractor if any from the drawings, schedule, specifications.
Follow up for quotations, checking for the correctness of quantities and prices from the received quotations.
Preparing Preventive maintenance Schedule of chiller’s 1,100 R.T, cooling towers, Boosting pumps, Lagoon system, water feature system, fountains, and ozone system filtration units solid separators.
Cross checking chilled water pipe line designs & duct designs with hydraulic calculation.
Keep involving in fit out MEP design reviewing & Commissioning works.
Fire protection Maintenance on weekly basis, fire hose reels, fire water pumps testing and fire hydrants.
Following up all reactive maintenance work order to achieve the maintenance target.
Attending all electromechanical problems.
Planning maintenance of Fountain systems Jet nozzles pumps, Burst nozzles pump, circulation pumps, Slope surface pumps, filtration system for fish ponds, and others mall related MEP equipment’s.
Maintenance of all electrical equipment’s and Fire Alarm System.
Good knowledge about NN100,FM200 clean agent fire suppression system in substation, control room
Good knowledge about Deluge system relate to LPG gas system.
Review of technical standards, specification & tender documents.
Personal performance management of commissioning schedule.
Ensure method statements & risk assessment & compliance with standards.
Leading the MEP maintenance team.
Manpower planning to carry out routine & breakdown maintenance
Planning & arrangement of materials to keep availability of spares at all times.
Routine & preventive maintenance and check-up of HVAC /Mechanical system, Battery operated JLG lifts, Omni lifts, UPS & Batteries check up on load, Fire alarm system & fire pump testing.
Analysing the course of breakdown to avoid recurring problem.
Answering all technical Query from site.
Updating day to day Log book regarding maintenance & fit out installation activities.
3)FAWAZ REFRIGERATION & AIR CONDITIONING CO W.L.L KUWAIT .
Job title : Maintenance Engineer
Duration : Commenced –01.04.12
Project : Sabha Hospital (KUWAIT)
Nature of work:
Operation and maintenance of mechanical pumps, D-Generators, water cool chillers, Air cooled chillers, Air handling units, DX units & boilers.
Designed and implemented special strategies related to maintenance procedures.
Pressure drop calculation for FAHU, AHU, HRU and FCU motor. Extract fan, pressurization fan, and other ventilation fans pressure drop calculations.
Preparation of modification on existing Duct /Chilled water/condenser water/Refrigerant piping lay outs.
Performed routine maintenance inspections of equipment to identify and respond to problems in a timely manner, thus preventing breakdowns.
Provided solutions for system faults and network errors in fire alarm system – Used root-cause-failure techniques, corrective actions, modifications and performed replacements and/or new installation.
Assigned personnel and technical support teams to sites requiring maintenance.
Utilized different reliability and testing strategies in plants to maintain and improve operation’s profitability.
Controlling, Coordinating and supervising all operational activities to run the shift smoothly and maximizing output.
To supervise Operators, Technicians and General Labour in support of the Plant's Operation and Maintenance.
4)SUN BUILDERS CONSTRUCTION COMPANY:-
Designation : Mechanical Engineer
Duration : Commenced – November 2011 to – February 2012
Nature of work:
Estimation of RCC Chimney material.
Installation of shuttering with Hydraulic lifting jacks and power pack equipment
Balancing & Trouble shooting of mechanical equipment stationary& rotating machinery.
Teaching and supervising the fabrication team for installation the tower crain
Providing technical support to fabrication team for installation of steel structure.
Coordinating with concern team members for fastening the job.
5)SWARAJ DIVISION MAHINDRA & MAHINDRA LTD: Phase IV, Industrial Area S.A.S Nagar (Mohali) PUNJAB TRACTOR Production Division. (Automobile) Job title : Assistant Line Engineer.
Duration : Commenced – January 2011 to – October 2011
Nature of work:
Inspection of various different capacities of Engines assembly, suspension assembly, gear assembly, hydraulic lift and Paint shop quality checking during assemble on line.
Involving in technical problems that comes in way during fabrication & troubleshoot the problems to make sure no delay in production line.
Taking a part in inventory for the store and update in the SAP.
Keep involving in new Commissioning works in plant.
Additionally Taking part in the operation maintenance of Air cooled chillers & related smoke management system.
Preparing Preventive maintenance Schedule for Boosting pumps, pneumatic system.
Observed equipment and machinery installed in the workshop to ensure good working condition for avoiding any break down.
Additionally Provided assistance to Team for overhauling works related to workshop for example gears, Pumps, fire protection system, JLG machines etc.
Execution of Project/Job As per Quality Standards at workshop through SAP-ERP system.
Ensuring Production of Job with Quality Standards (IS ASAE 913C0403 Swaraj Tractor standards) & Safety at Work place.
Inspecting Fabrication shop, for smooth supply of raw material & finished Product.
Co-ordination with Concern departments for effective planning & follow up of Material as per Requirement. to Achieve Production targets as per MPS.
Taking a part in final testing of vehicles and the parts before they are sent out from Assembly Unit. Survey and removed defective parts of the equipment to facilitate repair and assembled back.
Checking engine sound level at various levels .
Good knowledge about- Repairing and serviced of Spark ignition engines, Compression Ignition engine, overhauling, Comfort air conditioning & heating. vast knowledge about calculation of engine capacity, dimensions and tolerances using knowledge of mathematics and equipment’s. Other skills as SAP, ERP system, Testing, Inspection, Production Planning etc .
Work in Different project: Dead Stock, FIFO, S-Material, I. Planning etc.
6)PROJECT submitted to Punjab University Power Pack Hydraulic Slip form Jack Application used during erection of Bridges Long height Chimneys OHT and for heavy material lifting with accurate adjustable levelling. Project Submitted during Six month Training in university petrol engine sedan change over to Diesel engine and change related all suspension, chamber, body, Cheesy modification etc.
SKILL HIGHLIGHTS
Leading the MEP maintenance team.
Systematically & methodically solve problems after logical analysing.
Good co-ordination among team mates, follow result oriented work culture
Updating day to day maintenance activities.
Skill developed for achieving the best performance of all types of electromechanical equipment by professional installation operational & maintenance techniques.
Team building to take up the top notch trouble shooting & emergency handling activities.
Ability to build up high moral of team mates.
Excellent communication & leadership skills.
Experience in project & maintenance.
Manpower planning to carry out routine & breakdown maintenance
Planning & arrangement of materials to keep availability of spares at all times.
Analysing the course of breakdown to avoid recurring problem.
TRAINING CERTIFICATES
YEAR
TRAINING INSTITUTE/COMPANY
TITLE
2010
U.K Little Greene (Wood Street Manchester)
Production FIFO Training
2010
India (M/S Swaraj groups)
Production development strategy.
2011
India (M/S Swaraj groups)
Safety induction emergency training
2011
India (N.M.C institution)
Cad Cam, design
2013
Dubai (Geneva institution)
HVAC Designing training.
2016
Kuwait (Projacs international project management co.)
Training in Autodesk Revit MEP 2017
2014
Kuwait (Maqlink Consultant)
ISO 9001:2008 Internal Audit Training
2017
Kuwait (Al Noor International Consultant)
Training for QHSE & Internal Auditing.
2019
Kuwait (Fawaz Trading and Engineering services co)
Training on working at height
EXTRA ACTIVITIES
Player of Power lifting &Volley. Done modelling for Zain communication Co. in Kuwait
Kuwait Vehicle Licence Holder.
LANGUAGES KNOWN:
English fluent, Hindi fluent, Punjabi fluent, Arabic beginner.
DECLARATION
I hereby declare that all above information is absolutely correct up to my knowledge and I bear full responsibility of its correctness.
(Parveer Singh)