JULIUS L. PAUSANOS
Doha, Qatar
Contact No: +974-********
Email: ******@*****.***
Personal Profile:
Licensed Civil Engineer professional with broad knowledge of civil construction techniques & Completed Civil And Structural for Intelligent Transportation System (ITS) in Al-Khor Expressway Project.
Previously working as a Deputy Quality Manager at QDVC (Qatari Diar Vinci Construction) for LRT projects.
Light Railways Project suh as; At-Grade stations, Interstations, Underground Stations, Tunnels, Viaduct.
Also multiple projects like; Road Constructions, River Control, School Building, Dam, and Irrigation Canal with total of 22 years experienced in the field.
A strong leader, with experienced in developing and managing high performing team, whilst gaining commitment and effectively driving organizational change.
Qualifications:
Leadership and Management
Manager Ses Equipes/Team Management
ISO 9001-2015 Auditor Transition Course (IRCA-A17929)
QMS (Lead Auditor Certified)
Internal Audit Training (ISO 9001:2008)
PMP (Project Management Professional)
Licensed Civil Engineer (Philippines)
Qatar Driving Licensed
Professional Experience:
ITS-QATAR (INTELLIGENT TECHNOLOGY SYSTEM)
Position: Sr. Project Engineer
Project: Alkhor Expressway (under TEKFEN)
Jan. 2019- Present
Consultants:
KEO
Delivering the Truss Gantry
Preparing, scheduling, coordinating and monitoring the assigned engineering projects
Monitoring compliance to applicable codes, practices, QA/QC policies, performance standards and specifications
Interacting daily with the clients to interpret their needs and requirements and representing them in the field.
In charged of coordinating main-contractor’s Engineers
Completion of Piles – 175 nos., Pile Caps – 158 nos.,Gantries – 74 nos., GME (Ground Mounted Enclosure)-107 nos.,INSPECTION CHAMBER – 120 nos., DUCTS 4WAY- 5559 M, 2WAY- 2063 M, FEEDER PILLAR – 76 nos., PTZ ( Pan Tilt Zoom) -54 nos.
QATARI DIAR VINCI CONTRUCTION (QDVC), LUSAIL QATAR
Position: Deputy Quality Manager
Project: Lusail – LRT
June 2010 to Dec. 2018
Project Cost: $14 Billions
Consultants:
Phase 2C2/2C3 - (Italferr-Hill International- ASTAD Engineering JV)
Phase 2C1A – (PARSONS-AECOM JV)
Phase 2A and 2B – (PBS and J International, Inc.)
Delivering QAG (Civil, Ach and MEP Works) sub-Project of QDVC-LRT
In charged of coordinating to the construction team, third party laboratory, ICE and client.
Completion of 1 LRT-Viaduct, 2 Undergrounds and 10 At-grade stations, 17 KM interstations, 1 Temporary Road Bridge, 1 utility bridge, 10.7 KM excavation supports, 1 huge station excavation and Fissure grouting.
Completion of cut and cover 10.7 KM tunnels around Lusail City.
1 Quality plan reviewed and 10 Procedures prepared
90% of 240 WMS submitted, reviewed.
240 ITP ( Inspection Test Plan) prepared and approved by client.
1217 Material submittals commented by client, responded and approved.
95% of NCR closed.
100 QRP (Quality Report Package) completed and submitted
VSL - MIDDLE EAST, DUBAI UAE
Position: QSE Officer
Project: Palm Jebel Ali, Dubai UAE and Various project in Middle East
November 2008 to January 2010
Working as a Team leader of QSE (Quality Safety and Environment) in VSL, managing two QC and Safety inspectors in completing the Quality and safety regulations of the project PALM JEBEL ALI and completed the quality documents support for the accreditation of ISO of the company.
V.F.R. Limited (VSL- Freyssinet - Rizzani de Eccher Joint Venture), DUBAI UAE
Position: QC Inspector
Project: Dubai Metro Project Red Line and Green Line
Project Cost: US$7.8 billion
Consultants: SYSTRA PARSON
March 2007 to October 2008
Dubai, U.A.E.
QC Inspector for pre-cast yard VFR Dubai metro project.
Less NCR received
100% ITR closed
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION, PHILIPPINES
Position: Site Engineer- Road Construction Project
Projects: Urban road Libis Inter-change, Katipunan Boni Serrano Project Manila
Catarman- Calbayog via Lope de Vega Highway, Catarman Northern Samar
Project Cost: Php. 2.829 Billion & Php. 643.720 Million
May 2003 to Feb. 2007
Consultant: TCGI
Completion of Highway construction, composed of excavation, embankment, sub grade, sub base, surface course, slope protection and drainage system.
STAINLESS STEEL INDUSTRIES INC., MANILA PHILIPPINES
Position: Site Engineer
Project: Airport Terminal under TAKENAKA
April 2002 to May 2003
Completion of aluminium/ stainless cladding, glass handrail, Kirin panel for fixed link bridge and other steel works
DAMALIRIO CONSTRUCTION, SOGOD SO. LEYTE, PHILIPPINES
Position: Project In-Charge
Project: River Control, Residential Houses and Road Construction Project
January 2000 to January 2002
Managed the Manpower and Materials
Managed excavation, form works, steel works, finishing works and landscaping program of works for implementation.
SOLID CONSTRUCTION, PUERTO PRINCESA CITY PALAWAN, PHILIPPINES
Position: Project In-Charge
Project: Road Construction, Municipal Building, School Buildings
January 1999 to December 1999
Managed the Manpower and Materials
Completion of structured excavation, pile driving, carpentry and masonry works inclined with projects at hand.
F.UY CONSTRUCTION, SOGOD, SOUTHERN LEYTE
Position: Assistant Project In-Charge
Project: Dam, Irregation Canal, Syphoon, Viaduct Canal and Road Construction
July 1997 to July 1998
Managed the Manpower and Materials
Completion of excavation, re bar works and form works.
Academic Education:
University of the Visayas, Philippines
B.S. Civil Engineering Graduate
Civil Engineer Licensure Exam Passer
Training Undertaken:
IOSH Managing Safety-DISS Qatar
Annual Appraisal- Doha, Qatar
Integrated management system - Doha, Qatar
Concrete basic course - Doha, Qatar
Geotechnical basic course - Doha, Qatar
Incident and injury free training - Doha, Qatar
Enhancing the Competency Level of Electronics Engineers Towards Globalization- Doha, Qatar
Structured Cabling System- Doha, Qatar
Fiber Optic Splicing, Testing and Troubleshooting Techniques – Doha, Qatar
ASEAN Integration and ASEAN Chartered Professional Engineer Registry Seminar and Workshop – Doha, Qatar
Concremote – Doha, Qatar
Waterproofing – Doha, Qatar
Developing Effective Interpersonal & Communication Skills – Doha, Qatar
Post tension work training - Dubai, UAE
FRP (Fiber Reinforced Polymer) Training- Dubai, UAE
Reference:
Will be pleased to furnish upon request.
Julius L. Pausanos