Profile
ROV PILOT TECHNICIAN + MECHANICAL/HYDRAULICS/ELECTRONICS ENGINEER
Highly versatile, tenacious and driven Senior ROV Technician, possessing global expertise across offshore, oil rig, pipelining vessel, coastal and complex locations. Highly adept piloting, maintaining and repairing ROV equipment to exceptional standards, possessing outstanding and up to date training record and certifications. Adept knowledge of hydraulics and vehicle electronics. Able to deliver to exact client requirements, collaborate with cross functional teams and deliver exceptional results. Extensive background career within HM Forces and Gas Engineering, now possessing over 7 years Oceaneering ROV expertise.
Now looking to bring global ROV Technician experience into a new offshore pipelaying vessel or windfarm role where I can utilise expertise within an exciting, new challenge.
BRITISH CITIZEN / PASSPORT HOLDER VALID UNTIL 11 / 2029 1 YEAR MULTI ENTRY USA VISA VALID UNTIL 11 / 2020
1 YEAR MULTI ENTRY THAI VISA VALID UNTIL 03 / 2021
Key Skills
Submersibles Technician
Robotic “Arm” Movement
Subsea Decommissioning
ROV Operations & Repair
Intervention Tool Management
Offshore & Coastal Delivery
ROV Equipment Inspections
Relaying & Analysing Data
Heavy Lifting
Health & Safety
Fault & Risk Mitigation
Customer Service
Stakeholder Management
Team Communications
Quality Management
Project Brief Execution
Hydraulic Construction
Management Reporting
Professional Experience
ROV TECHNICIAN 2 EXXON MOBILE, MALABO, EQUITORIAL GUINEA 10 / 2019 – Present
ROV TECHNICIAN TULLOW, GEORGETOWN, GUYANA & ACCRA, GHANA 04 / 2019 – 07 / 2019
ROV TECHNICIAN CDEX, CENTRAL NANKAI TROUGH, JAPAN 11 / 2018 – 03 / 2019
ROV TECHNICIAN OCEANEERING, JAPAN, SCOTLAND & ENGLAND 05 / 2018 – 09 / 2018
ROV TECHNICIAN JMH, GAMAGORI, JAPAN 03 / 2018 – 04 / 2018
ROV TECHNICIAN JAMSETC, FUKOUKA, JAPAN 11 / 2017 – 11 / 2017
ROV TECHNICIAN ITHACA, ABERDEEN, SCOTLAND 08 / 2017 – 09 / 2017
ROV TECHNICIAN MOGIT, LAMBCHABANG, THAILAND 08 / 2017
ROV TECHNICIAN OCEANEERING & JMH, TOYOHASHI, JAPAN 04 / 2017 – 07 / 2017
ROV TECHNICIAN 2 JMH, GAMAGORI, JAPAN 11 / 2016 – 12 / 2016
ROV TECHNICIAN CDEX, OKINAWA, JAPAN 11 / 2016 – 12 / 2016
ROV TECHNICIAN SMTC, SINGAPORE 05 / 2016 – 06 / 2016
ROV TECHNICIAN JMH (JAPANESE METHANE HYDRATE RESEARCH), SHIMIZU, JAPAN 05 / 2016 – 06 / 2016
ROV PILOT TECHNICIAN BRUNEI SHELL PETROLEUM 10 / 2015 – 01 / 2016
ROV PILOT TECHNICIAN OCEANEERING, BATAM, INDONESIA 09 / 2015
ROV TECHNICIAN JAMSTEC, TOKYO, JAPAN 09 / 2014 – 09 / 2014
OPAC COURSE TRAINEE OCEANEERING, BATAM, INDONESIA 09 / 2015
ROV PILOT TECHNICIAN CONOCO PHILLIPS, PHUKET, THAILAND 07 / 2015
ROV TECHNICIAN SHELL, VUANG TUA, VIETNAM 04 / 2015
ROV TECHNICAN TOTAL, MIRI, MALAYSIA 11 / 2014 - 01 / 2015
ROV TECHNICIAN / JUNIOR TECHNICAN OCEANEERING, JAPAN 09 / 2013 – 01 / 2015
ROV TRAINEE SUBNET SERVICES, ORTETZ, PHILLIPINES 03 / 2013 – 04 / 2013
Effectively utilised HILO Intervention skid/Duplex pump to pump Glycol and stack magic in prevention of hydrates, whilst using jetting pump to clear hydrates and 6-inch dredger to make clearance for bullseyes on conductor to assist TULLOW in exploration of oil
Periodically using hotstab to inject and conduct daily GVI,S (General visual inspections), ensuring accurate B.O.P latch pressure checks whilst drill floor conducted pressure tests
Utilised HI/LO B.O.P Intervention skid in clear Hydrates using hotstab
Operated Millennium working class system within UK North Sea to attach TSS metal detector, 4-inch dredger, MS1000 Sonar system and Arris Gen 5 system; accurately preparing the areas for future demolition by EOD team following clearance
Cored sea bed, monitored drilling and production of wells in and around NANKAI TROUGH Japanese sea
Delivered within depths up to 1900 M, assisting scientists in collecting core samples of GEO Thermal energy and methane content for future experiments
Accurately replaced winch gear box, motor, hoses and preventative maintenance on winch levelwynd and A frame on ROV Lars Winch system, Re-tapping Transformers from 2800v to 2400v, whilst conducting HV checks across multiple motors to ensure accurate launch / future recoveries
Recovered Tree structures/mattresses and sleepers from the North Sea, UK sea bed upon OI 4 Vessel on a double system TOP HAT AND CAGE Millennium 199 and Millennium 130, using used SC Atlas arm and T4 arm, 6/8-inch dredger, Dyno pressure jetter, Diamond wire cutters and hard line cutters within decommissioning project
Searched and 2018-07 - 2018-08 scanned North Sea areas, previously pre surveyed, leading pre site surveys to locate un-exploded ordinance from previous world wars
Operated on system Magnum 175 Drill support operation for JMH, accurately collating data whilst drill crew cored 2 wells
Supported abandonment operation across 2 production wells whilst recovering both completions, handling washover of 1 well prior of recovery of 2 well heads and 2 monitoring wells, using tools: Marston Bentley pump, Rcu with hotstabs using oceanic and Tellus fluids from separate bladders, whilst testing diamond wire cutters subsea and surface and preparing system for NDT inspection
Successfully removed and backloaded aged HPU heat exchanger on board Chikyu vessel in Dry Dock, replacing with refurbished same model heat exchanger whilst conducing full paint job
Produced 1st Methane Hydrate in fuel form, leading annual umbilical reterm / Load tests on Magnum 113, using tools Hard and Soft lines cutters, AX (vx) ring tools, Duplex pump with hotstab and bladder for glycol injection
Delivered on 2 wells AT1 P2 and AT1 P3 using calibrated torque tool class iv set at 270 nm for opening valves, operating at depths of 1400 M and 1900 M whilst assisting scientists in collecting core samples of GEO Thermal energy and methane content for future experiments
Working on Magnum 208 on vessel Pacific 33 (anchor handling vessel) conducted pigging and grouting operations in co-ordination with deep water sat dive teams, whilst conducting pipelaying and pipe repairs with vessel DB 30. Tools used: FLOT and Torque
Built key client relations to understand and deliver requirements, delivering exceptional customer service
Conducted Tool Box Talks to clearly communicate team requirements, confirm misunderstood directions and quickly mitigate issues / risks to drive effective performance
Created accurate reporting and office administration / bookkeeping support through CTAG Dos and Windows software applications
BAR OWNER GOLDEN TIME PUB & RESTAURANT CHONBURI, THAILAND 02 / 2010 – 03 / 2013
GAS ENGINEER / BOILER TECHNICIAN BRITISH GAS, UK 02 / 2005 – 01 / 2010
STAFF SERGEANT HM ARMED FORCES, GLOBAL 06 / 1982 – 10 / 2005
General Training
RIPS BOP RELIABILITY UPGRADES (TB 325 REV B) 01 / 2020
ROV ENVIRONMENTAL & ENERGY DEVELOPMENT (WELL INTERVENTION) 05 / 2019
HIGH HAZARD TASK OBSERVER WORK INSTRUCTION 02 / 2019
SAFETY ALERT – HiPo 12 / 2018
HOSE LOG & HOSE TAGGING (TB NO. 221 REV D) 04 / 2018
RIPS OVERVIEW 04 / 2018
MECHANICAL TERMINATION ELECTRIC-OPTICAL UMBILICALS 12 / 2017
DYNACON 521 XL BRAKE CIRCUIT MODIFICATION (TB 271 TEV B) 10 / 2018
DOCKING HEAD SHOCK ADSORBER MAINTENACE PLACEHOLDER (TB 321) 06 / 2018
ELECTRIC TORQUE TOOL 10 / 2018
ISN & SA Training
MARINE TRASH & DEBRIS 07 / 2019
OPITO BOSIET: BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY 03 / 2017
SAFETY & ENVIRONMENTAL MANAGEMENT SYSTEMS (SEMS) 11 COURSE 12 / 2016
HEARING PROTECTION AWARENESS 08 / 2016
RISK MANAGEMENT – JSEA (e-LEARNING) 07 / 2015
OCEANEERING INTERNATIONAL OBSERVATION PROCESS 09 / 2013
LOTO 09 / 2013
IT & SO Training
HYDRAULIC FILTER FOR ATLAS HYBRID (TB NO. 302) 09 / 2016
HEAVY WEATHER LAUNCH SYSTEM (TB NO. 304) 08 / 2016
RETROFIT OF MANIPULATOR JAW CIRCUIT PRESSURE RELIEF VALVE (TB NO. 306b) 08 / 2016
PEOPLESOFT SECURITY FORM: BASE ON FILE/READ ONLY ACCESS V9.1 03 / 2016
UMBILICAL SLIP & CUT INTERNAL (TB NO. 307) 02 / 2016
FLANGES ON 110HP (82kW) (TB NO. 303) 02 / 2016
SEPRO LARS BULLET SETSCREW (TB NO. 305) 02 / 2016
PEOPLESOFT SECURITY FORM; EX EMPLOYEE 9.2 01 / 2016
HWOA PEDESTAL SHIMS (TB NO, 295B) 01 / 2016
IDENTIFYING THE FLOAT FUNCTION OF DT-SERIES DOCKING HEAD CONTROL MANIFORLD (TB NO 300) 12/2015
MAGNUM VEHICLE LIFT TUBE INSPECTION & FASTNER UPGRADE (TB NO 301 REV. C) 12 / 2015
EHPU HYDRAULIC HEAT EXCHANGER FLOR SETTING (TB NO 288 REV.B) 12 / 2015
Health & Safety Training
TE-ROV-1013 MOTOR REPLACEMENT 04 / 2020
TE-ROV-1097 INSULATION TESTERS (MEGGERS) 04 / 2020
TE-ROV-1210 CONNECTING TWO POWER CONDUCTORS INTO ONE ZEUS 100 TERMINAL (TB 32 8 B) 03 / 2020
TE-ROV-1196 REPLACE BOLTS ON PUMP FLANGES (TB NO. 322C) 02 / 2020
TE-ROV-1205 IMPROPERLY MACHINED TMS LEVELWIND PAWL (TB 326 100A) 02 / 2020
TE-ROV-1207 DIP SWITCH SETTING ON ABB MOTOR BREAKERS USED IN 100 PDU (TB 247C) 02 / 2020
HAND & POWER TOOL SAFETY 11 / 2019
FIRE & EMERGENCY 11 / 2019
CERTIFICATE PLAN: MALARIA REQUIRED REFRESHER 11 / 2019
TE-ROV-2016 REASSEMBLE & DISASSEMBLE THE 0T4 MANIPULATOR 11 / 2019
LINE OF FIRE & PINCH POINTS 09 / 2019
HAZARD COMMUNICATION CHEMICAL SAFETY COMPLETE 09 / 2019
HAND WRIST & FINGER SAFETY (ONLINE) 09 / 2019
TE-ROV-1094 TETHER BASICS & BEYOND COMPLETE 09 / 2019
TE-ROV-1501 TOPHAT LAUNCH & RECOVERY 09 / 2019
TE-ROV-2025 SERIAL COMMUNICATION GENERAL CONCEPTS 09 / 2019
AWARENESS LEVEL 07 / 2019
SAFETY ALERT 19.017 ADTECH OES FATAL INJURY 07 / 2019
MEGOHMMETER 06 / 2019
TE-ROV-2029 OPTICAL TIME DOMAIN REFLECTOMETER 06 / 2019
TE-ROV-2031 CLINTON FAULT FINDER 06 / 2019
TE-ROV-2032 MAGNOGRAPH AWARENESS 06 / 2019
TE-ROV-2036 INTRODUCTION TO OPAC 06 / 2019
WW-ROV-HSE-POL-0001 LOTO PROCEDURES 06 / 2019
TE-ROV-1022 GENERAL TROUBLESHOOTING EXAM 06 / 2019
TE-ROV-1031 HYDRAULIC TROUBLESHOOTING EXAM 06 / 2019
TE-ROV-1046 PILOTING SKILLS & TECHNIQUES 06 / 2019
TE-ROV-1066 BASIC ROV TROUBLESHOOTING 06 / 2019
TE-ROV-1100 BIDDLE TDR EXAM 06 / 2019
TE-ROV-1119 GROUNDING PRINCIPLES EXAM 06 / 2019
TE-ROV-1124 TECHNICAL LOGBOOKS 06 / 2019
TE-ROV-1126 INTRODUCTION TO UMBILICALS EXAM 06 / 2019
TE-ROV-1127 UMBILICAL INSPECTION EXAM 06 / 2019
TE-ROV-1128 UMBILICAL MAINTENANCE EXAM 06 / 2019
TE-ROV-1130 UMBILICAL INSTALLATION / RETERMINATION 90 EXAM 06 / 2019
TE-ROV-1071 OPERATIONS GUIDELINES & PRINCIPLES 100 EXAM 06 / 2019
CERTIFICATE PLAN: HIGH VOLTAGE SAFETY AWARENESS 05 / 2019
DIGITAL MULTIMETER 05 / 2019
LIGHT SOURCE & METER 05 / 2019
HIGH VOLTAGE TEST BOX 05 / 2019
SAFETY ALERT 19.002 - FINGER AMPUTATION 03 / 2019
SAFETY ALERT 19.006 DROPPED LARS SNUBBER RING 03 / 2019
MEDICAL CLEARANCE 02 / 2019
SAFETY ALERT 18.014 - HIPO - ELECTRICAL SHOCK 10 / 2018
PH METER OPERATIONS 12 / 2018
TE-ROV-1193 PREVENTION OF BRAKE FAILURE ON DYNACON WINCHES 100 WITH CONVENTIONAL OR OHRA LEVEL WIND (TB NO. 320) 01 / 2018
TE-ROV-1189 CAGE DRUM DRIVE SPROCKET REPLACEMENT (TB NO. 100 224C) 12 / 2017
TE-ROV-1190 CAGE CLAMP SECONDARY LATCH MODIFICATION (TB NO. 100 318) 11 / 2017
TE-ROV-1191 INSTRUCTIONS FOR HANDLING WINCH BRAKE FAILURE (TB 100 NO. 319C) 11 / 2017
TE-ROV-1188 ATLAS HYBRID JOINT ANGLE SENSORS (TB NO. 317) 09 / 2017
OPITO COMPRESSED AIR EMERGENCY BREATHING SYSTEM (CA-EBS) INITIAL DEPLOYMENT 08 / 2017
TE-ROV-1186 MEGACON BREAKER UPGRADE & IDENTIFICATION (TB 100 NO. 316A) 07 / 2017
TE-ROV-1187 RETENTION OF OPAC TTL / RS232 DAUGHTER CARD 100 (TB NO. 315A) 07 / 2017
LEVEL 2 DROPPED OBJECT PREVENTION, REV 0 05 / 2017
TRAVEL SAFELY BY BOAT 03 / 2017
TE-ROV-1182 VERIFICATION OF POWER ISOLATION TO CONSOLE FO 100 MULTIPLEXERS (TB NO. 313) 03 / 2017
TE-ROV-1183 CARE OF MAGNOGRAPH ARMORED UMBILICAL TESTER (TB 100 NO. 158B) 03 / 2017
TE-ROV-1184 VERIFYING THE PRESENCE & PROPER FUNCTION OF THE 100 HPU LOW OIL SHUTDOWN PCB (TB NO. 246B) 03 / 2017
TE-ROV-1185 INTEGRATION OF FITOK VALVES AND FITTINGS (TB NO. 100 314A) 03 / 2017
TRANSFER OF PERSONNEL AT SEA 12 / 2016
INTERNATIONAL SOS EBOLA AWARENESS 12 / 2016
PRESSURE TESTING 12 / 2016
OFFICE SAFETY 12 / 2016
TE-ROV-1181 REVISION TO UMBILICAL STATUS REPORT AND HIGH 100 VOLTAGE TEST PROCESSES (TB NO. 312) 10 / 2016
HSE BULLETIN: ASSET INTEGRITY ELECTRICAL SHOCK 09 / 2016
CERTIFICATE PLAN: OCEANEERING'S IMPACT ON THE ENVIRONMENT 08 / 2016
ACCESS TO MEDICAL RECORDS 08 / 2016
HSE ALERT – MANIPULATOR SECUREMENT STRAPS 08 / 2016
TE-ROV-1178 MILLENNIUM LIFT TUBE INSPECTION & FASTENER 100 UPGRADE (TB NO. 309A) 06 / 2016
TE-ROV-1179 TMS DIAMOND SCREW REWORK (TB NO. 310A) 06 / 2016
TE-ROV-1180 FA/FAN-3600 MOON POOL DOOR LOCKING PINS – 100 LOTO (TB NO. 311A) 06 / 2016
TE-ROV-1177 NEW JOINT ANGLE SENSORS AND JUNCTION BLOCK FOR 100 ATLAS HYBRID MANIPULATOR (TB NO. 308B) 04 / 2016
ROV-OPR-003 VIDEO RECORDING & MANAGEMENT 12 / 2016
CERTIFICATE PLAN: MALARIA REQUIRED 10 / 2015
SPECTRUM & OCEANEERING POWER AND CONTROL 09 / 2015
TE-ROV-1161 ELEX DECK CABLE SAFETY CONCERN (TB NO. 299) 08 / 2015
HAZARD IDENTIFICATION (E-LEARNING) 07 / 2015
TE-ROV-1159 TITAN 4 PITCH SPACER (TB NO. 297) 07 / 2015
TE-ROV-1160 POTENTIAL FOR TETHER CHAFING ON MILLENNIUM PLUS 100 VEHICLES (TB NO. 298) 07 / 2015
TE-ROV-1158 DETACHED CAPS ON DYNACON EHPU HP FILTER 100 ELEMENTS (TB NO. 296B) 06 / 2015
TE-ROV-1133 POSSIBLE LOOSE FASTENERS ON DT A-FRAME SHEAVE 100GREASE SEAL RETAINER PLATES (TB NO. 294) C 05 / 2015
TE-ROV-1156 SH WINCH LEVEL WIND LUBRICATION (TB NO. 293B) 05 / 2015
TE-ROV-1154 REPLACEMENT OF CROWN FASTENERS ON DT SERIES A- 100 FRAMES (TB NO. 237 REV. B)
04 / 2015
OCEANEERING - LIFE SAVING RULES 03 / 2015
TE-ROV-1151 RETROFIT OF RELIEF VALVES TO BOOM CYLINDERS (TB NO. 100 147C) 03 / 2015
TE-ROV-1152 DT-SERIES LATCH CYLINDER PRESSURE SETTING (TB NO. 100 291B) 03 / 2015
TE-ROV-1153 DT-SERIES A-FRAME CUSHION RING ADJUSTMENT (TB 100 NO. 290C) 03 / 2015
TE-ROV-1155 SEADRIFT TMS POWER SHEAVE DRIVE SHAFT INSPECTION 100 (TB NO. 292A) 03 / 2015
TE-ROV-1192 MSAL-22-CCP INSERT NUMBERING ERROR (TB NO. 259, 100 REV. C) 03 / 2015
TE-ROV-1149 EHPU HYDRAULIC HEAT EXCHANGER SERVICE (TB NO. 100 288A) 02 / 2015
TE-ROV-1150 DYNACON BRAKE RELEASE HOSE REMOVAL (TB NO. 100 289A) 02 / 2015
TE-ROV-1145 DYNACON ACME SCREW LOCKING COMPONENTS 100 MODIFICATION (TB NO. 284A) 01 / 2015
TE-ROV-1146 HWOA CURSOR ASSIST WINCH CIRCUIT UPGRADE (TB 100 NO. 285A) 01 / 2015
TE-ROV-1147 VERIFICATION OF HWOA CURSOR ASSIST WINCHES 100 ORIENTATION (TB NO. 286A) 01 / 2015
TE-ROV-1148 PAINTING OVER CYLINDER WIPER SEALS (TB NO. 287A) 01 / 2015
METHANOL SAFETY AWARENESS 12 / 201
TE-ROV-1143 INSULATION TESTING AND CLEANING (TB NO. 283) 12 / 2014
HAZARDOUS ENERGY FOR AUTHORIZED USERS COMPLETE 11 / 2014
TE-ROV-1140 FOCAL FMB-X CARDS (TB NO. 227A) 11 / 2014
TE-ROV-1141 SPECTRUM SYSTEM JUNCTION BOXES (TB NO. 281A) 11 / 2014
TE-ROV-1142 TITAN 4 ELBOW SPACER (TB NO. 282A) 11 / 2014
TE-ROV-1144 TITAN ELBOW FASTENER IDENTIFICATION (TB NO. 280A 11 / 2014
ATLAS HYBRID OPERATIONS 10 / 2014
FATALITY PREVENTION PROCESSES & BEHAVIORS 09 / 2014
TE-ROV-1134 CHECKING TRANSFORMER FASTENERS INSIDE 100 TRANSFORMER COFFIN (TB NO. 276) 09 / 2014
TE-ROV-1135 GUIDANCE FOR OPERATING DT SERIES A-FRAME LATCHES 100 (TB NO. 279) 09 / 2014
TE-ROV-1136 IMPROVED TETHER COUNTER (TB NO. 170, REV. D) 09 / 2014
TE-ROV-1138 REMOVAL OF POLARIZATION TESTING FROM USR (TB NO. 100 NO. 277) 09 / 2014
TE-ROV-1139 SUB ATLANTIC THRUSTER LOCK RINGS (TB NO. 278) 09 / 2014
TE-ROV-1137 PREVENTING CORROSION BEHIND ATLAS HYBRID JOINT 100 SENSOR HOUSING (TB NO. 273)
08 / 2014
TE-ROV-1075 ACOUSTIC SURVEY EQUIPMENT 07 / 2014
SAFETY MEETINGS 06 / 2014
WORLD CLASS SAFETY SURVEY 11 / 2013
BASIC PRINCIPLES OF ROV LAUNCH & RECOVERY 100 (LARS) 10 / 2013
TE-ROV-1011 HYDRAULIC PUMP EXAM 10 / 2013
DRUGS & ALCOHOL 09 / 2013
LIFTING COMPLETE 09 / 2013
DRIVING SAFETY 09 / 2013
HYDRAULIC SAFETY 09 / 2013
PERSONAL PROTECTIVE EQUIPMENT 09 / 2013
BACK SAFETY 09 / 2013
FALL PROTECTION (E-LEARNING) 09 / 2013
SLIPS TRIPS & FALLS 09 / 2013
HR Training
EASTERN HEMISPHERE COMPETENCY REQUIRED READING 03 / 2020
CONFLICT OF INTEREST DISCLOSURE 01 / 2019
CODE OF BUSINESS CONDUCT & ETHICS (e-LEARNING) 03 / 2019
OCEANEERING ANTI CORRUPTION COMPLIANCE (e-LEARNING) 03 / 2019
CONTINUOUS IMPROVEMENT (CI): ONLINE 12 / 2016
JOB DESCRIPTION: TECHNICIAN 06 / 2014
EXTENSIVE FURTHER TRAINING DETAILS AVAILABLE ON REQUEST, INCLUDING FURTHER VACCINATION DETAILS
Education & Certifications
FURTHER OFFSHORE EMERGENCY TRAINING INC EBS & TRAVEL SAFELY BY BOAT SMTC GLOBAL EXP 03 / 2021
BEGINNER TO PRO IN POWERPOINT: COMPLETE POWERPOINT CERTIFICATE 365 CAREERS 06 / 2020
MASTER MICROSOFT WORD BEGINNER TO ADVANCED 365 CAREERS 06 / 2020
MICROSOFT EXCEL BEGINNER TO ADVANCED 365 CAREERS 06 / 2020
INTERNATIONAL CERTIFICATE OF VACCINATION OR PROPHYLAXIS: YELLOW FEVER 03 / 2019
OFFSHORE MEDICAL CERTIFICATE BANGKOK HOSPITAL 02 / 2019 VALID UNTIL 02 / 2021
CERTIFICATE PLAN: MALARIA REQUIRED REFRESHER OCEANEERING 03 / 2018
COMPRESSED EMERGENCY AIR BREATHING SYSTEM (CA-EBS 5902 OPITO APPROVED 08 / 2017
MOG INDUSTRY TRAINING CO LTD
CURRENT SEAMANS BOOK: DISCHARGE NUMBER DB00110415 08 / 2017
ROV ADVANCED: ROV OPAC TROUBLESHOOTING MAGNUM & SPECTRUM LOTO, PROVING DEAD PROCEDURE BATAM ROV CENTER 09 / 2015
MEDICAL CLEARANCE 11 / 2014
ROV OPERATOR TECHNICIAN LICENCE: B9Y2D6 SUBNET SERVICES LTD 03 / 2013
HIGH SCHOOL DIPLOMA BRITISH GAS ACADEMY, UK 2006 - 2010
HIGH SCHOOL DIPLOMA BYDALES SCHOOL - MARSKE-BY-SEA, UK 1979 – 1982
Pilot Hours
Platform
System
Work Scope
Drill Ship
500 & 287
Magnum Plus
528
Drill Support
770
Drill Ship
70
Magnum
212
Construction
70
Jack Up
20
Millennium
70
Other
25
Semi
20
Millennium
50
Completion
20
Work Class Vessels
3
Millennium Plus
35
Sim-Ops
15
Anchor Vessel
2
Magnum
7
Inspection
2
Total
902
902
902
Additional Information
Affiliation: Armed Forces Veteran Member 2005 - Present
Technical: MS Office AutoCAD SQL, C & C ++ Qualified Web Designer Adobe Photoshop Windows 2000 / XP / VITA / Windows 7
Languages: German Thai English
References: Professional and personal references are available on request
John Moscrop
******@****.**.** +66-615****** linkedin.com/in/john-moscrop-2115a236/