Post Job Free
Sign in

Civil Engineer

Location:
Arvada, CO
Posted:
August 04, 2020

Contact this candidate

Resume:

Angelika Molas

eslabiak@ gmail.Arvada, com CO ***03 917-***-****

EXPERIENCE

Ascent Geomatics Solutions, Westminster, CO

Civil Design • • • • • • • Prepared Prepared Prepared Designed ponds, Prepared Provided package Provided Engineer/ swales, drawings, CAD vehicle drainage detailed USR, Surface grading Technician support sediment SWMP trucking Use plans grading State reports Agreement and IV, creating for and traps, September exhibits GESC and in well County support drainage and drawings plans pads (SUA) in berms 2017 exhibits support with for of exhibits for oil oil for – up and oil June and multiple for of to and gas oil 36 permitting for gas 2020 gas and wells development oil sites oil sites and gas and for including pad gas including Weld, gas sites access sites; Adams, facilities, access road this and included and roads, well Arapahoe well pads sediment WOGLA pad and accessibility Counties MLVT and basins, 2A pads The Vertex Companies, Denver, CO

Civil Design • • Prepared Provided coordination, Engineer, CAD site December asbestos, planning support 2014 and in lead addition – drawings paint, September mold to for full 2017 locations, approximately land development bore location 110 services. multiple records, sites; groundwater this included contour drawing maps,

• TCE include Provided UP approval concentrations, a 36.layout 38-through acre and environmental approvals site project in Northpoint, close for out the report addition for MA the exhibits and $0.of 65.2M, new 15-and 0.acre track 8-project acre site turnouts site in close in Central Gering, out at a documents. Bergen, private NE. rail NJ. Typical service projects yard from

• Conducted Property Condition Assessment.

Brierley Associates, Denver, CO

Assistant • • Engineer, Prepared subcontractors, Performed Geotechnical January and geotechnical field planed 2013 building testing for – August investigations geotechnical investigation including 2014 soil field plans, and and investigations prepared rock organizing boring technical and utility including coring, data locates. scheduling reports pit test investigations, for drilling engineering / coring soil designs. and rock

• • classification Performed other Prepared data logs standard and engineering construction and tables, laboratory logging. and report management CAD soils documents documents. tests and testing including, concrete and field material investigation observations testing method in including the field. statements Proctor and Testing field results, and Field Engineer, • Full 1200 Fredonia, time foot on deep, site KS 20, representative March foot wide 2013 shaft – August and through inspector 2014 native for the soil project and rock. design Construction engineer for included the construction building the of a shaft, foot wide an 80 by foot 10 foot wide, high 20 tunnels foot high connecting gallery / cavern to the gallery at the 1200 that included foot depth, underground over 100 linear mechanical foot of 10 rooms underground and utility works infrastructure. back up to the Construction ground surface also for included the purpose raise boar of ventilation, shaft, 1200 utility foot from transport, the and

• emergency Excavation escape. methods observed full time included drilling and blasting, and raise bore construction.

• Responsible and specifications) for construction for the excavation, management initial as ground related support, to the engineering and final lining design of documents all of the underground (drawings works. Requests Management for Information and document and Substitution, control daily included, construction review and reports, acceptance progress of contractor tracking, weekly submittals, meetings, progress payments. CAD work and specification writing in support of engineering design team, and verifying Olsson Associates, Golden, CO

Assistant • • • Engineer Prepared Sheets. Created Prepared in Made a Land the Cost Retaining revisions Existing Estimate. Development, Wall and to Profile. the Proposed September plans and Plans called 2012 for the – out December projects the Flag using 2012 Notes Civil on all 3D. the Set Development up the Development Plans. Omland Internship EXPERIENCE • • • Engineering - Designed the Designed foundations. Ensured Project (Cont.transportation, Leader, that ) sewers, an Associates, undeveloped projects September drainage, geotechnical, conformed Cedar land 2011 utilities, Knolls, in – hydraulics, to Mahwah, December federal grading, NJ NJ and and traffic 2011 into state environmental residential signs, environmental detention single aspects basin, family regulations of wetland the housing project. and transition units local by ordinances. analyzing area, and New Land Jersey Development • • Redesigned construction Worked where Institute the Project on flow of a an of geotechnical Technology, Team existing and a strip pressures Member, mall road project Newark, using to September in accommodate pipes AutoCAD. where NJ were the 2011 computed seepage for – December a predictive under using 2011 a HAESTED dam increase was in found Method vehicle using Software. volume GeoStudio due to and the SKILLS

CERTIFICATIONS • • Experience Proficient in with Windows AutoCAD, XP/ME/Civil 2000/3D, Hydro-98, Word, flow, Excel, HEC-RAS and Hydrograph, PowerPoint. Rational Method, and GeoStudio.

• • • Nuclear 40 MSHA hour Refresher Gauge MSHA: Operator 04/Training 19/2013 Safety 08/09/Training 17 03/06/2013 EDUCATION

New B.S. in Jersey Civil Engineering, Institute of GPA: Technology, 3.643, Jan Newark, 2012 NJ ACTIVITIES:

HONORS:

§ § § § American Tau Engineering Dean’s Beta List Pi, Society The Alumni Engineering of Civil Whitford Engineers, Honor Scholarship Society, Member Member LaGuardia A.S. in Liberal Community Arts: Mathematics College, and Long Science, Island GPA: City, NY 3.72, June 2007 COURSE HONORS: KNOWLEDGE § § Phi Dean’s Theta List Kappa, Member Strength of Materials

Statics Dynamics

Foundation Surveying Design

Fluid Mechanics

Structural Analysis

Hydraulics Soil Mechanics Lab

Steel Construction Design MGT

Construction Materials Lab

Construction Water Reinforced Transportation Underground Civil Engineering Resources Concrete Materials Construction Engineering Engineering Design Design and I and Procedures II



Contact this candidate