PERSONAL DETAILS.
OBJECTIVE
To Obtain challenging employment in a company of high-level, to be part of their technical team, and this way to use my creativity, dedication, knowledge and ability to solve problems for further enhance my knowledge and skills. Accustomed to working under pressure, Creative professional, dynamic, flexible.
PROFESSIONAL
EXPERIENCE
Aug – Sep 2019
May – Jul 2019
ROV Sr. Pilot Tech. Fugro – Trinidad and Tobago.
Perform planned maintenance and repair tasks on ROV units and ancillary equipment as required by regulations, Company and Client procedures.
Operating equipment such as cameras and interpreting data, sometimes in poor visibility, from video or sonar displays to calculate and keep track of the position of the vehicle.
Launching, recovering and flying the ROV by remote control from the surface of the water to depths of up to 3000 msw.
Assisting in major umbilical and tether re-termination.
ROV Sr. Pilot Tech. Fugro – Gulf of Mexico. USA.
Launching, recovering and flying the ROV by remote control from the surface of the water to depths.
Conduct pre/post dive checks, assist in deployment and recovery of ROV with adherence to Company’s Quality Assurance, Safety and operational procedures.
Jan 2013 – Feb 2019
Aug 2011 - Dec 2012
Jun 2011 – Jul 2011
Jan 2006 - May 2011
ROV Supervisor, Assistance of Project, Technical Support. Semi-submergible Drill Rig-Muralla IV. Grupo-R International. Gulf of Mexico. Project Manager Assistant.
Responsible for the execution of ROV operations and ensuring its timely completion in accordance with the relevant scope of services, while remaining within the constraints of Company and Client safety and operational procedures for all personnel and the ROV System.
Responsible for mobilizations and demobilizations of the ROV system. Tether re-termination and Umbilical re-termination.
ROV Supervisor. Canyon Offshore. United States of America, Houston, TX .
Responsible for the execution of ROV operations and ensuring its timely completion in accordance with the relevant scope of services, while remaining within the constraints of Company and Client safety and operational procedures for all personnel and the ROV System.
ROV Supervisor. Subsea 7 i-Tech. (APAC). Ensuring that the project operations comply with Company / Clients / Industry HSEQ. Ensuring that problems arising within the execution of the projects are communicated and understood by the relevant staff involved in the project and followed through to a satisfactory conclusion. Assisting in repair of all ROV System equipment.
Assisting in major umbilical, tether re-termination.
ROV Supervisor / Sr. Pilot Tech. Canyon Offshore. U.S.A, Houston, TX. Operating equipment such as cameras and interpreting data, sometimes in poor visibility, from video or sonar displays to calculate and keep track of the position of the vehicle. Perform planned maintenance and repair tasks on ROV units and ancillary equipment as required by regulations, Company and Client procedures. Ensure that all the ROV auxiliary equipment is operational. Ensuring that the project operations comply with company / clients / Industry HSEQ. Assisting in repair of all ROV System equipment.
May 2003 - Dec 2005
ROV Pilot Tech. Subsea 7. Mexico
Ensure that all the ROV auxiliary equipment is operational. Perform planned maintenance and repair tasks on ROV units and ancillary equipment as required by regulations by the company and client procedures. Testing and installing ROV mounted tooling packs, manipulators, camera's and interface survey sensors in the ROV auxiliary systems.
Assisting in major umbilical re-termination.
Oct 1993 - May 2003
Oct 1986 – Jun 1991
E.T.O. Maersk. Offshore semi-submergible platforms. Mexico.
Electrician in charge and responsible for all maintenance and repair of electronic and electrical equipment in the semi-submergible platform.
GMDSS Operator, Electronics / ETO. Merchant Marine Vessels (worldwide) Radio Officer. GMDSS operator, electronics and electro-mechanical Technician, maintenance, operation, wiring, mechanical and some hydraulic assembly. Read and interpret electrical, architectural and mechanical diagrams, drawings or specifications to determine wiring layouts for new or existing installations
EDUCATION
Sep 2013 - Oct 2016
Sep 1991 – Aug 1993
Sep 1984 - Aug 1986
Aug 198 – Sep 1983
University Valle of Mexico Completed University online
Nautical Merchant Marine School: Electronics Engineering.
Merchant Marine Academy Electronics and Radio communications Tech.
High School
CERTIFICATIONS
Name course
Issuing Body
Issue Date
Cert Number
Exp. Date
ROV Supervisor
MTCS
3 AUG 2015
P1k6ds583
3 AUG 2021
High Voltage Safe Working Practice
MTCS
18 AUG 2018
1msdtrpet
18 AUG 2021
Schilling HD Operation Maintenance & Repair
FMC Technologies
01 FEB 2013
BOSIET
Houston/USA
8 Nov 2018
8992575008111801
7 Nov 2022
OGUK
Houston/USA
7 Nov 2018
2013/1844
6 Nov 2020
SAFE GULF
Houston/USA
VISA B1_OCS
U.S.A.
17 FEB 2019
25 Feb 2024
LANGUAGE SKILLS
ROV VEHICLE / EXP.
MANIPULATORS /
EXP.
PROJECT EXP.
TOOLS AND SENSORS / EXP.
ENGLISH SPOKEN: Good WRITEN: Good
SPANISH SPOKEN: Good WRITEN: Good
Theory, operation, maintenance, mobilization and demobilization of the following equipment:
TRITON Perry: ST, XL XLS, XLX ROV / Trencher Triton T750.
SMD: QX, Pioneer and Hercules.
Sub-Atlantic: Super Mohawk
Schilling HD.
Five Functions: Schilling Rig Master, Perry-TA60.
Seven Functions: Schilling Titan 3 and 4.
Schilling Orion 7P.
Subsea Umbilical Installation • SCM Pod Change-outs • Subsea Mattress Installations • Jumper, STFL, HFL and EFL Installations • Well Intervention • Suction Pile Installations • Subsea Tree Installations • Pipeline Lays and Surveys • Umbilical Installations • Installation and Commissioning of Girasol and Cascade / Chinook FPSOs fields • Dewatering Gas Export Lines • Pressure Testing Pipe Lines and Free Standing Hybrid Riser • Subsea Equipment Commissioning • Pressure Cap and SkoFlo Change-out • ADCP recovery • Metrological Buoy Change-outs • Cable Burial • Spudding in New Wells • Drill Rig Support • Dive Support.
Running tool SCM for Aker Kvaerner
Seal Replacement Tool VCM 28”.
Seal Replacement Tool- wellhead.
Cleaning tool VCM 12”, 28” MB/SB
Cleaning tool FMC Hub.
Hydraulic cleaning tool for well head.
Cameron Cleaning tool.
Cameron Running tool.
Oceaneering torque tool CL-2 to CL4.
Jupiter torque tool CL-2 to CL4.
Jupiter Subsea Torque Verification System.
Jupiter Control System for TT.CL4
Various cutters, Hardline, soft line and subsea grinders used
Various Zip Pump / Zip Jet Subsea dredging & jetting systems
TSS 340 & 440 Cable & Pipe Tracker
AKER Torque Tool Class 10
Multiplier TT Class 5
Torque Tool CL7. Aker Kvaerner.
Back seal test Unit.
Orientation tool flying lead.
Damper tool VCM 22”,28”12” Aker K.
Push up/down tool 12”.22”,28’ Aker K.
PPT Control Unit. Aker K.
Oceaneering Flot tool.
5 Station Manifold.
Hydraulic grinding tool.
IHPU – MAKO
Oceaneering RCU.
Oceaneering Liner Valve Override Tool 2&5 inc.
Test Jig for LVOT
Oceaneering AX/VX Rotary Hub Cleaner
Cathodic Protection (CP)
Oceaneering High Press Directional Valve
Forum AX/VX gasket tool replacement.
Seanic 5K Water Blaster.
Quad, dual and single Hot stab.
BOP intervention tool, AT150.
Forum Methanol Skid
Forum Glycol Skid.
Forum BOP Actuation Tool (BOP-AT150)
Single & Dual Point TDU’s (Oceaneering & Subsea7 Units)
Various hot-stab / tronic connections used
HiPAP, USBL, LBL, COMPATT, CTD probes, ROVNAV, QINSy, WinFrog
Automatic - Electronic systems, for propulsion ship's Engines, tugs. Electro-Hydraulic Systems and Electro-Pneumatic systems. Communications via satellite (GMDSS, inmarsat, c, a, m) Also including Drilling equipment: - (Top drive, Baylor brake, B.O.P. etc.) Switch Boards High tension. (AC/DC) Motor generators (480, 600 ac voltage) Radars (band - s, x) Gyroscopic Course repeaters Echo-sounder Satellite Navigator Navtex Rx VHF SSB. Trans-Receptor Battery Charges Motors AC/DC Telephone Exchanges SCR s Echo sounders Internet skills including: e-mail. Experience using the WWW Microsoft Office (Word, Excel, PowerPoint)
ROV TRACK RECORD
Start Date
End Date
Client
ROV Syst.
Position
Vessel
Location
Task
Aug 2019
Sep 2019
BHP
FCV 3539
Senior ROV Pilot Technician
Drill Ship Deep Water Invictus
Trinidad and Tobago
Install riser and drill Support
May 2019
Jul 2019
Seabed Solutions
FCV 3075
Senior ROV Pilot Technician
MSV Hugin Explorer
GoM,
USA
Survey and seismic Nodes Retrieval
Jan 2019
Feb 2019
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Nov
2018
Jan 2019
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Sep 2018
Oct 2018
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Aug 2018
Sep 2018
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Jul 2018
Aug 2018
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
May 2018
Jun 2018
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Mar 2018
Apr 2018
Grupo-R LTD
Schilling HD30
ROV Supervisor
Workshop.
Mexico
Maintenance on HD36
Jan 2018
Feb 2018
Grupo-R LTD
Schilling HD30
ROV Supervisor
Workshop.
Mexico
Maintenance on HD36
Dec 2017
Jan 2018
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Oct 2017
Nov 2017
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Sep 2017
Oct 2017
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
1 Aug 2017
29 Aug 2017
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
May 2017
Jun 2017
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Feb 2017
Mar 2017
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV.
GoM, Mexico
BOP and Raiser Installation. Drill Support
Nov 2016
Dec 2016
PEMEX
Schilling HD36
ROV Supervisor
MSV Bucanero
GoM, Mexico
XMT Installation
Aug 2016
Sep 2016
PEMEX
Schilling HD36
ROV Supervisor
MSV Bucanero
GoM, Mexico
Survey
May 2016
Jun 2016
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV.
GoM, Mexico
BOP and Raiser Installation. Drill Support
Mar 2016
Apr 2016
Grupo-R LTD.
Schilling HD36
ROV Supervisor
Workshop
GoM, Mexico
Complete overhauling Schilling HD36
Jan 2016
Feb 2016
PEMEX
Schilling HD30
ROV Supervisor
Drill Rig Muralla IV.
GoM, Mexico
Demob HD30 and Mob HD36.
Sep 2014
Dec 2015
PEMEX
ROV HD30 and HD 36
Project manager assistance.
Drill Rig Muralla IV / MSV Buccanero
GoM, Mexico
Assistance with the problems arising within the execution of the projects are communicated and understood by the staff involved in the project.
May 2014
Jul 2014
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Apr 2014
May 2014
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Feb 2014
Mar 2014
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Dec 2013
Jan 2014
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Oct 2013
Nov 2013
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Aug 2013
Sep 2013
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
3 Jul 2013
31 Jul 2013
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
May 2013
Jun 2013
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
BOP and Raiser Installation. Drill Support
Mar 2013
Apr 2013
PEMEX
Schilling HD36
ROV Supervisor
Drill Rig Muralla IV
GoM, Mexico
Mobilization of Schilling HD36 onboard of Drill Rig Muralla IV
Jan 2013
Feb 2013
Grupo-R LTD
Schilling HD
ROV Supervisor
None
Mexico
Training on Schilling HD WROV.
01 Dec 2012
28 Dec 2012
PEMEX
Perry ST-12
ROV Supervisor
Drill Rig Ocean Yorktown
GoM, Mexico
Riser and BOP installation / Drill Support
Oct 2012
Nov 2012
Grupo-R LTD
Triton Perry XLX 64
ROV Supervisor
HOSS ST. JOHN
GoM, USA
Riser and BOP installation / Drill Support
Jul 2012
Oct 2012
PEMEX
Triton ST-12
ROV Supervisor
Drill Rig – Ocean Yorktown
GoM, Mexico
Riser and BOP installation / Drill Support
Jul 2012
Jul 2012
BP
Triton
XLS 14
Senior Pilot Tech.
Vessel Well Enhancer
North Sea, UK
Dive Support
Nov 2011
Jun 2012
PEMEX
Triton
ST12
ROV Supervisor
Rig – Ocean Yorktown
GoM, Mexico
Riser and BOP installation / Drill Support
Sep 2011
Oct 2011
PEMEX
Centurion QX207
ROV Supervisor
Drill Rig – West Pegasus
GoM, Mexico
Riser and BOP installation / Drill Support
02 Aug 2011
29 Aug 2011
BP
Triton XLS18 XLS19
Senior pilot tech
MSV Norman Clipper
GoM U.S.A
XMT Installation,
Jun 2011
Jul 2011
PEMEX
Centurion QX207
ROV Supervisor
Drill Rig – West Pegasus
Curacao
Riser and BOP installation / Drill Support
Mar 2011
May 2011
BP
Triton
XLS 10
ROV Supervisor
MSV Express
GoM U.S.A
Umbilical 6” installation
Dec 2010
Jan 2011
BP
Triton
ST12
ROV Supervisor
MSV Intrepid
GoM U.S.A
Pipe lines and PLET Installation
Sep 2010
Oct 2010
Technip
Triton
XL19
ROV Supervisor
MSV Apache II
GoM U.S.A
Umbilical Installation
Jun 2010
Jul 2010
BP
Triton XLS14
Sub Atlantic super-mohawk 18
Senior Pilot Tech.
WSV Well enhancer
North Sea UK
Well Intervention / Dive Support
May 2010
Jun 2010
BP
Triton XLS14
Sub Atlantic super-mohawk 18
ROV SUPV /Senior Pilot Tech.
WSV Well enhancer
North Sea UK
Well Intervention / Dive support.
Mar 2010
Apr 2010
Anadarko
Triton
XLS49
ROV Supervisor
MSV Express
GoM U.S.A
Umbilical, EFL and Jumpers Installation. XMT Valve Operations
Dec 2009
Jan 2010
BP
Triton
XLS10
ROV Supervisor
MSV Express
GoM U.S.A
Pipe Installation, metrology, Jumpers, FLET, PLET, EFL installation. Valve operation.
Oct 2009
Dec 2009
BP
Triton XLS27
ROV Supervisor / Sr. Pilot Tech
MSV intrepid
GoM U.S.A
Hurricane Remediation
Jul 2009
Sep 2009
Reliance Industries
Triton XLS 10
ROV Supervisor
MSV Express
Kakinada, India
Jumpers, EFL, HFL and umbilical installation.
May 2009
Jun 2009
Reliance Industries
Triton XLS 46
ROV Supervisor
MSV Rem Forza
Kakinada, India
Jumpers Installation / Dive support
Feb 2009
Apr 2009
Reliance Industries
Triton XLS 46
ROV Supervisor
MSV Rem Forza
Kakinada, India
Jumpers Installation / Dive support
Nov 2008
Dec 2008
Reliance Industries
Triton XLS 10
ROV Supervisor
MSV Express
Kakinada, India
Umbilical and Jumpers installation
Oct 2008
Nov 2008
Reliance Industries
Triton XLS 10
ROV Supervisor
MSV Express
Kakinada, India
Umbilical and Jumpers installation, Metrology.
Jun 2008
Aug 2008
Reliance Industries
Triton XLS 10
ROV Supervisor
MSV Express
Kakinada, India
Suction Piles, EFL, HFL, Umbilical installation.
Mar 2008
May 2008
Reliance Industries
Triton XLS 08
ROV Supervisor
MSV Express
Kakinada, India
Suction Piles, EFL, HFL installation.
Jan 2008
Feb 2008
Reliance Industries
Triton XLS 10
ROV Supervisor
MSV Express
Kakinada, India
Umbilical remediation, metrology. Survey
Dec 2007
Jan 2008
BHP Billiton
Triton XLS07
ROV Supervisor
MSV Intrepid
GoM U.S.A
Concrete mats installation.
Metrology, Pipe line Installation.
Nov 2007
Nov 2007
Reliance Industries
Triton XLS08
ROV Supervisor
MSV Intrepid
Kakinada, India
Suction Piles Installation, Metrology
Aug 2007
Sep 2007
BP
Triton XLS07
Senior Pilot Tech.
MSV Intrepid
GoM USA
Jumper CFL, EFL, CFL Installation, Metrology.
Mar 2007
May 2007
Petrobras America
Triton XLS14
Trencher T-600
ROV SUPV / Pilot tech.
MSV Tyco Decisive
GoM, Mexico and USA
Pipe lines survey. Monitoring Trencher T-600
Jan 2007
Mar 2007
Shell
Triton XLS07
Senior Pilot Tech
MSV Harvey
GoM U.S.A
Concrete Matts Installation, Survey
Oct 2006
Nov 2006
BP
Triton XLS08
XLS10
ROV Supervisor
MSV Express
GoM U.S.A
Pipe Line Installation
Jun 2006
Sep 2006
Chevron
Triton XLS07
Senior Pilot Tech
MSV Tyco Decisive
GoM U.S.A
Survey Pipe lines, buried pipe, Monitoring Trencher T-600. Concrete Matts Installation
Apr 2006
May 2006
Shell
Triton
XLS 08
Senior Pilot Tech
MSV Express
GoM U.S.A
Pipe line Installation
Mar 2006
Apr 2006
Shell
Triton
XLS 10
Senior Pilot Tech
MSV Express
GoM U.S.A
Pipe line Installation
Jan 2006
Feb 2006
Chevron
XLS 08
Senior Pilot Tech
MSV Express
GoM U.S.A
Pipeline Installation
Jul 2003
Nov 2005
PEMEX
Pioneer 24
Pioneer 26
PilotTech.
Drill Rig Borgnie
GoM, Mexico
Riser and BOP installation / Drill Support
E-mail ********@***.**.
Mobile Number: +52-558******* / +1-713-***-****
Date of Birth: 14 Nov 1964
Gender: Male Male
Nationality: Mexico.
Address: Privada 33 – 6 Las Palmas
Medellin de Bravo, Veracruz. Mexico. CP 94274
Passport Number: G21779339
Seamen’s Book: P0254299 Panamanian