Post Job Free
Sign in

Engineer Site

Location:
Chennai, Tamil Nadu, India
Posted:
August 03, 2020

Contact this candidate

Resume:

Name:RIKESH.H

Contact Details:

E-mail:

ade14k@r.postjobfree.com

Mobile: +919*********

Whatsapp: +974********

Skype ID:rikilara89

Passport:U3169303

Permanent Address:

E-223, MMDA Colony, Arumbakkam,

Chennai - 600106, Tamilnadu, India.

Personal Data:

Date of Birth: 03-09-1989

Gender: Male

Nationality: Indian

Marital Status: Married

Blood Group: B+

Languages Known:

English (IELTS Certified) & Tamil (Native)

Career Objective

Seeking a challenging position to effectively

utilize my creative abilities and skills in an

organization that offers professional growth while being innovative and flexible.

Areas of interest

● Building & Facilities Management.

● MEP Systems.

● Operations and Maintenance.

● Utility/Plant Maintenance.

● Building Management System (BMS).

Extra-Curricular Activities

● Inter-School District Karate Champion

Under 11-13 Category held in Kalpakkam.

● Represented my school as vice-captain in

the Inter-School District Cricket

Tournament.

● A member of the college cricket team

which won the runners up trophy in the

Inter Engineering Collegiate Tournament

and Dr. A.C. Muthiah Rolling Trophy in

2012.

Personal Skills

● Good communicator and effective team

player.

● Time & Man Management.

● Self-driven, Energetic and Quick learner.

● Leadership Quality.

● Smart Worker.

● Adaptable to new situations and

environments.

Academic Projects

Nov 2008 – Mar 2009 AUTOMATIC PNEUMATIC JACK

Our project deals with the lifting of heavy objects like tractors, cars for repairing and overhauling purposes in mechanical and automotive lines. Nov 2010 – Apr 2011 DESIGN OF MEDIUM RANGE JETLINER This is a design project where we designed a 280-seater passenger aircraft that covers a range of 7200 km at a cruise speed of about 872 km/hr by comparing the data and specifications of present aircrafts in this category.

Sep 2011 – Mar 2012 REDUCTION OF DRAG USING WINGLETS IN CESSNA-150 Aircraft In this project, we designed and fabricated the scaled wooden wing model (with and without winglets) of CESSNA-150 wing type and found the percentage reduction in drag by testing the models in the low subsonic speed wind tunnel.

Academic Records

June 2009 – June 2012 BE., Mechanical / Aeronautical Engineering - 72.13 % Rajalakshmi Engineering College, Anna University, India. June 2006 – April 2009 Diploma in Mechanical Engineering - 89.25 % Adhiparasakthi Polytechnic College, Anna University, India. June 2004 – April 2005 Secondary School (SSLC) - 78.18 % Little Jacky Matriculation School, India.

Other Certifications

● IELTS - General Training with ‘C1’ CEFR level.

● World Academic Qualifications Recognition (ECA) from World Education Services, Canada. Professional Experience

Aug 2012 – Sep 2015 HVAC Engineer

Vijay Jothy Engineering (Voltas limited contract), India Chennai International Airport, Airports Authority of India (AAI) client Utility/Plant Capacity: 9500 TR (Cooling-High Side), 11 KV Power Roles & Responsibilities:

● Lead the Operation & maintenance team of both high side/low side which includes equipment Carrier made Centrifugal water-cooled chillers, York made AIr-cooled chillers, Induced drag Cooling towers, Carrier & Blue star made AHU, TFA, FCU, Cassette unit, Ventilation & exhaust air systems, Motors & pumps, VFD, and LT/HT panel systems.

● Co-operated with the project team for air/water balancing work and performed seasonal chiller tests.

● Prepared the PPM schedules and co-ordinated for its execution to ensure 100% equipment reliability.

● Analysed Chiller/Cooling tower/AHU performance and prepared technical reports for the client for effective capacity enhancement.

● Overseen BMS team for proper conditioning of air quality and temperature.

Sep 2015 – Oct 2016 HVAC Supervisor / Shift Engineer Al mannai group of companies (Qatar Kentz contract), Qatar Sidra Medical & Research Center (SMRC) 7-Star Hospital - QF Client Utility/Plant Capacity: 30250 TR (Cooling-High Side), 33 KV Power Roles & Responsibilities:

● Overseen the O & M mechanical team with HVAC and other Mechanical systems which includes, not limited to, McQuay made Centrifugal water-cooled chillers,Induced drag Cooling towers, Klimak made AHU & FCU, Ventilation & exhaust air systems, Staircase pressurization system, Calorifiers, Hot water pumps, Heat exchangers & Tertiary pump system, and Variable drive motors.

● Prepared site observation reports and resolved the problems one by one with available materials and manpower.

● Analysed Chiller, Cooling towers, AHU performance and prepared schedule for effective equipment management.

● Prepared the PPM schedule for all equipment and co-ordinated for its smart execution.

● Prepared and maintained manpower & machine power checklist for ensuring smooth day to day activities.

● Lead BMS team for maintaining proper indoor air quality and temperature, especially in lab & OT areas.

● Co-coordinated with the HSE team to keep the worker’s environment safe and conducted tool box & safety meetings on a daily basis to ensure the workers were working with proper PPEs for the specified jobs.

Nov 2016 – Jul 2020 Assistant Facility Manager, HVAC Site Engineer Petroserv Limited, Qatar

SMRC Hospital, Alshaqab Hotel, Central Plant - QF client Utility/Plant Capacity: 46000 TR (Cooling-High Side), 33 KV Power Roles & Responsibilities:

● Leading the MEP O & M facilities team involving the various Mechanical, Plumbing & Electrical systems like McQuay made Centrifugal Water-cooled Chillers, Daikin made VRVs, York made Air-cooled chillers, Water pumps, Water circuits - Fire, Potable & Irrigation, Electrical Panels, Fire Pumps and Emergency DGs, York made AHUs, Cold rooms, Cold room systems, Heat Exchangers and Dx units.

● Performing the role of contractor focal point to ensure the smooth running of the facilities by compiling all the activities and liaison with the client for the same.

● Estimating and prognosticating all work activities as per the work orders through CMMS (CAFM) software to achieve the desired KPI for each month interval.

● Conducting various site visits & inspection under TSS team to give the technical solutions for abnormal systems & its conditions with suitable recommendations, if any.

● Overseeing the Central plant operation activities and making sure all equipment is operating under normal conditions with nominal parameters without any end user complaints.

DECLARATION

I hereby declare that all the above furnished details are true to the best of my knowledge. Yours truly,

Place : Chennai, India

Date : (H. RIKESH)



Contact this candidate