Resume

Sign in

senior land surveyor

Location:
Dubai, United Arab Emirates
Posted:
August 02, 2020

Contact this candidate

Resume:

HENRY GARCIA BALDONADO

Satwa dubai

Mobile: 056-***-****

Email Add: ade0uw@r.postjobfree.com

Applying for: Land Surveyor / Senior Land Surveyor

Career Objectives: To secure a position in a well-respected organization, that will provide long-term employment and professional growth in the global field of Engineering & Construction.

JOB ATTITUDE

Performs assigned task without much supervision.

Accept criticism and advices from authorities and also open to suggestions from

Colleagues and co-employees.

See to it that the duties and functions are being performed with dedication, honesty

And diligence.

Look for the time for every work and responsibility by means of time management.

Ability to Manage a team and be responsible for their performance.

Work Experience

Nass Contracting LLC

P.O. box 38003 Adnic bldg. Abu Dhabi

Position: SR Land Surveyor March 20, 2017 – Present

Duties & Responsibilities:

Topographic survey

Setting out for foundation, pedestal, anchor bolts and embedded plates.

Site preparation works including excavation for foundation.

Establish Horizontal and Vertical traverse.

Preparation of correspondence, work Inspection requested and other technical data required during the course of the construction.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc.

Maintaining the tolerance of bolts and plates asper client during installation and concreting period. Precise surveying.

Perform the duties of a chief surveyor and senior surveyor due to lack of man power.

Joint survey with consultant, and 3rd party surveyor for inspection before and after concrete.

Survey works, structural foundation, installing bolts and embedded plates, hand over structural foundation to mechanical team after all inspected concrete done and approved by consultant.

Structural areas i manage to handle Pile cap, Foundations, Pedestal with anchor bolts and base plate, Sub-station, UPVC pipes for cable pulling, GRE pipes, HDPE pipes, Oily manhole, Pull pit manhole.

PROJECTS HANDLED:

A: ( ABU DHABI, UAE )

1.EGA- Emirates Global Aluminum (ATA POWER AND STEAM INTEGRATION PROJECT)

2.Steam power plant

B: ( JEBEL ALI, UAE )

3.600MW Jabel Ali Power Station K Phase - III for DEWA

4.Power Plant ( CIVIL WORKS )

Habtoor Leighton Group

P.O. box 10869, Umm Ramool, Airport road, Dubai, U.A.E.

Position: Land Surveyor December 10 2015 – February 15, 2017

Duties & Responsibilities:

Topographic survey

Setting out for Road Diversion.

Site preparation works including excavation for utilities.

Joint survey with the consultant in any changes or proposed revision in contract drawings.

Establish Horizontal and Vertical controls.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

Preparation of correspondence, work Inspection requested and other technical data required during the course of the construction.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc.

PROJECTS HANDLED:

5.Road and Transportation Authority - Upgrade Junction at Airport Road

DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

Position: SURVEYOR June 12 2012 – Nov 20 2015

Duties & Responsibilities:

Traverse horizontal and vertical control points.

Setting out of bored pile location and asbuilt after drilling.

Setting out of pile cap and column.

Joint survey with the consultant in any changes or proposed revision in contract drawings.

Assigned in monitoring of girder fabrication to ensure as per plan design.

Joint survey with consultant for inspection of structures such as pile cap, column, and installation of girder.

Asbuilt elevation of girder after installation.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

In-charge with the Implementation of Design Coordinate given by the Construction team.

Preparation of correspondence, work Inspection requested and other technical data required during the course of the construction.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc.

PROJECTS HANDLED:

6.SKYWAY STAGE 3 PROJECT (24 KM skyway- buendia ave to balintawak ave) BRIDGE PROJECT

To give the commuters easy access to connect from north expressway to south expressway.

DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

Position: SURVEYOR April 1. 2007 – January 17, 2012

Duties & Responsibilities:

Traverse horizontal and vertical control points.

Closing loop and joint survey with consultant for approval.

Setting out of grid lines to use for layout of structures and referrence point.

Joint survey inspection with consultant of pile cap, foundation, structure and columns.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

In-charge with the Implementation of Design Coordinate given by the Construction team.

Monitor and check installation of I-beam for proper alignment and level.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc.

Instrument Handled: Latest model for TOPCON and LEICA Total Station.

PROJECTS HANDLED:

7.SLPGC 132 MW POWER PLANT (BATANGAS CITY)

SLPGC 150 MW POWER PLANT (BATANGAS CITY)

To supply electric power using coal for steam power.

DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

PROJECT HANDLED: Smelting & steel fabrication (batangas city)

Position: SURVEYOR Nov 7 2009 – April 19 2012

Duties & Responsibilities:

Responsible for marking points, layouts of pile for pile cap foundation.

Asbuilt survey with sub- contructor after the structure done such as pile cap, columns, etc..

Assigned in checking of grid lines, control points and elevation to maintain zero tolerance for structures.

Joint survey with the consultant in any changes or proposed revision in contract drawing.

DMCI PHILS.

PROJECT HANDLED: Solaire resort and hotel (macapagal ave near moa)

Position: SURVEYOR April 13 2006 – june 17 2006

Duties & Responsibilities:

Establish grid line for structure reference.

Establish elevation.

In-charge with the implementation of design coordinates given by the construction team during the course of the construction.

Checking and reviewing of plans and shop drawings for design, coordinates, elevation, etc.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

PROJECT HANDLED: Mrt line 3 ( Metro rail transit line 3)

Position: SURVEYOR April 13 2006 – June 17 2006

Duties & Responsibilities:

Traverse horizontal and vertical control points.

Setting out of bored pile location and asbuilt after drilling.

Setting out of pile cap and column.

Joint survey with the consultant in any changes or proposed revision in contract drawings.

Assigned in monitoring of girder fabrication to ensure as per plan design.

Joint survey with consultant for inspection of structures such as pile cap, column, and installation of girder.

Asbuilt elevation of girder after installation.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

In-charge with the Implementation of Design Coordinate given by the Construction team.

Preparation of correspondence, work Inspection requested and other technical data required during the course of the construction.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc.

DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

Position: INSTRUMENT MAN Jan 10 2006 – April 2 2006

Duties & Responsibilities:

Topographic survey for contract bidding.

Establish control points.

Traverse control points and traverse elevation.

Submit accomplishment report for topographic to survey manager.

TRANSOCEAN CONTAINER SERVICES INC.

1409 Federal tower dasmarinas st. binondo manila phils.

Position: Document controller July 12 2003 – March 8 2005

Duties & Responsibilities:

Document controller/ Brokerage

Education

Bachelor of Science in Civil Engineering

2000 – 2003 ST JOHN TECHNOLOGICAL COLLEGE OF THE PHILS.

(POST GRADUATE)

Automotive Technology

1998 -2000 ST JOHN TECHNOLOGGICAL COLLEGE OF THE PHILS.

(GRADUATE)

Technical Skills

Familiarities of Instruments

Leica 1201/501 Builder (Total station – 1 second)

Leica Digital and Automatic level

Topcon 7002 and 7502 (Total station)

Topcon Digital and Automatic level

Leica TS15A1

Leica TS09

Leica TS11

Computer Literate

Microsoft office

Auto Cadd

Personal Information

Birth Date: March 08, 1981

Civil Status: Married

Citizenship: Filipino

Religion: Christian

Sex: Male

Attributes: Highly motivated to work on large scale project and able to work independently as well as in a team.

Passport No.: EC4570114

References:

EDILBERTO CINCO Survey Manager

Mobile No.: +971 056-***-****/ +971 052-***-****



Contact this candidate