Islam Mahmoud Magd Eldin Ibrahim
Tel: +202-********
Mob: +2-010********
E-Mail: ade0a5@r.postjobfree.com
Address: 1st _9 St._ Wadi-Hof _ Helwan _ Cairo _ Egypt
Objective:
Challenging a position in a multinational company with a promotional career in the field of Maintenance, Distribution, Control, Installation and Automation where I can make full use of my academic studies, personal skills and maintain my career objectives.
Personal Information:
Data of birth : 11th January1987.
Place of birth : Cairo, Egypt.
Nationality : Egyptian.
Gender : Male
Marital status : Single
Military status : Exempted
Driving license : Yes
Education:
May 2011 : B.Sc. of Engineering Faculty of Engineering, Cairo University,
Major: Electrical Power and Machines.
Grade of 4th Year: Good (68.5%).
Project Grade: Excellent.
June 2004 : General certificate of secondary education, El Zahraa Secondary School.
Cairo, Egypt (Grade 95%).
Graduation Project: Oil sulfur recovery
Project Description : Design and implementing a Control system to serve Oil Sulfur Recovery Industries using freelance software from (ABB).
Project aim : Design Oil sulfur recovery control system using Claus process.
Project Supervisor : Prof. Ahmed Bahgat & Prof. Hassan Rashad
(Professors of Electric Power Machines - Cairo University)
Employment:
Sep 2011 : EGYHEAT Co., Electrical &Installation Engineer working in Non Destructive test devices & Heat Treatment Machines & Furnaces. We make Calibration for the Heat Treatment machines & Furnace & rebuild furnace with modern designs as we are the agent company of a British company Copper heat UK.
July 2012 : Hikma Pharmaceuticals PLC, Electrical engineer in the Maintenance department, dealing with electrical or mechanical defects in the factory.
Nov 2014 : Senior Maintenance engineer in Givaudan Egypt responsible for preventive maintenance and corrective maintenance plans and CI projects.
Training Experience:
July 2012 : GMP (Good Manufacturing Procedure) for Engineering and Maintenance in the Training Department in Hikma Pharmaceuticals .
Sep 2012 : I have read and understood SOP's (Standard Operating Procedure) Training in the Training Department in Hikma Pharmaceuticals PLC.
Nov 2012 : In charge of the installation of SHANG YUH Liquid System(Preparation, Storage& CIP System) including make IQ & OQ for the machine and calibration tests.
Dec 2012 : In charge of the installation Suppository System (Filling M/C, Cooling units &Sealing and cutting M/C) SARONG from Italy. Including make IQ&OQ for the machine and calibration tests.
Dec 2012 : In charge of the installation of FETTE 2200i Tablet press machine from FETTE compacting GMBH Germany. Including make IQ & OQ for the machine and calibration tests. & Installation of Its lifter (BOHLE) from Germany.
Jan 2013 : In charge of the installation of new Cartooning M/C from Korea (HOONGA). Including make IQ & OQ for the machine and calibration tests. & Installation of Upstream and Downstream systems.
Feb 2013 : Follow up of internal project to redesign an old area to change it from class D to Class C. and transfer the liquid and semisolid department to the new area.
Mar 2013 : Follow up upgrading of BMS on the factory. Taking course in DESIGO system Software by Petrokema Company.
Jan 2014 : Responsible for the electrical installation in the packaging area upgrade (redesign lighten, sockets, new power lines, Installed doors interlocking system)
July 2014 : In charge of the calibration.
Aug 2014 : Responsible for light current project (Sound system& Camera system).
Sep 2014 : In charge of the installation of new Complete line Blister & Cartooning M/C from Italy (CAM). Including making IQ & OQ for the machine and calibration tests. & Installation of Upstream and Downstream systems.
Dec 2014 : SAP training & how to make maintenance plan, Maintenance work orders.
Mar 2015 : Modified old production lines CIP system to increase the system reliability and efficiency.
Apr 2015 : Modified Liquid production CIP system to increase the system reliability and efficiency.
Jun 2015 : Prepare technical hand book for operating & maintenance for all production lines.
July 2015 : In charge of project to increase production lines reliability & efficiency and to decrease break down time to be 1 HR per week and to reach 80% preventive maintenance orders VS 20% corrective maintenance orders.
Aug 2015 : In charge of LED Lighting project to replace all factory lights with LED.
Sep 2015 : Modified old production lines liquid tanks.
Oct 2015 : Increase electrical technicians skills by applying technical trainings to apply PDCA & works for route cause of electrical & mechanical faults.
Jan 2016 : Installation of New Carbonation machine & Apply training for the FC&A lab staff (how to operate the machine).
Feb 2016 : In charge of project to improve the small S.S tools cleaning with new CIP machine.
Mar 2016 : In charge of design out project to redesign filling units design to reduce the preventive maintenance cost.
April 2016 : In charge of upgrade liquid W.H cold store room Including replaced old AC unit (7.5 HP) with New (20 HP) and sandwich panel renovation and cladding .
May 2016 : In charge of replacing all factory sealing to sandwich panel.
Aug 2016 : Attend FAT for industrial washing machine in Ellegelle machinery SRL Italy
Courses:
Aug 2011 : Distribution [Gelicom center in Cairo] AUTOCAD & Etab software.
July 2010 : Programmable Logic Control (PLC) Siemens in Cairo University Faculty of Engineering in High Technology Center.
Aug 2008 : AutoCAD (2D) in the Faculty of Engineering Cairo University in High Technology.
July 2013 : Had a training course in the calibration in highly institute for calibration in general methods of calibration (temperature, moisture, speed, pressure masses) and how to write a calibration certificates.
May 2014 : PLC Service level2 course in establishing a communication between (PLC, HMI& Drives) Siemens to download, upload or modify programs besides that system troubleshooting and diagnostics of systems faults.
Jan 2015 : Lean White belt training achieved.
Feb 2015 : Lean Yellow belt Training and prepare project schedule study for power saving in lighting consumption using LED.
Dec 2015 : Lean Yellow belt certificate achieved.
Mar 2018 : Process risk analysis leader training
Nov 2018 : Electrical safety training course.
Programming Languages & Software Applications:
MS Office (Word - Power Point - Excel - …).
AutoCAD (2D) &Electrical shop drawing.
Free Lance software (DigiVis & Control builder).
Mat lab (Simulink) & Power world (Short circuit calculations).
Etab, Calculux& Dialux software.
Installation & Programming of all bands of Variable speed inverters (Schneider, Siemens, and Allen Bradley…ET.)
Installation, Maintenances & Programming of all bands of PLC (Siemens, Mitsubishi and Allen Bradley…ET.)
Power factor calculation and controller programming and settings.
SAP
Semantic manager 7
Languages:
Mother language: Arabic.
Very good command of English (Speaking/Writing/Reading).